You are on page 1of 1
Unit 8 - Week 7 Course outline How to access the portal ‘Wook 2 Week 2 Week 2 Week 4 Week 5 Week 6 Week 7 ‘simutaton ana Caso Staty OFAC Microgrid ‘Simulation and Case ‘stugy of DC Microgea ‘Simulation and Case Sut ofAC-DC Hybrid Microgria Demand Side Managementin he ‘sman Grid Demand Response Analysis of Smart na ‘quiz: Assignment 7 solutions: Assignment-7 Week 8 DOWNLOAD VIDEOS WEEKLY FEEDBACK reviewer3@npteL.itm.ac.in v Assignment 7 ‘The due date for submiting this assignment has passed. Due on 2019-09-18, 23:59 IST. ‘As per our records you have nat submitted this assignment. 2) Which ofthe flowing fs rue inthe case of overexcited synchranaus generator? 4 point sors reactive power Inject reactive power (Operates at tne unity power factor None of the above Np, the answer is incomes Secre:0 ‘Accepted Answers: Iects reactive power 2) Which of the folloring statement is true in the grid connected operation of the AC microged? 4 point Battery charging, PV at MPPT, diesel generator regulating the voltage and frequency Battery charging, PV at off MPF, diesel generator regulating tne voltage and frequency attory charging, PY at MPPT, cosa gonorator tured oft None of the above No, the answer is incomes Secre’0 ‘Accopted Answers: ‘Battery changing, PV a MPP, diesel generator turned off 3) While the dual active bridge converters are used to interface the two Autonomous DC microgids, the transformer 1 point operates at? \ery low frequency Low trequency Meat frequency High frequency No, the answer is incoect. Sere: 0 Accepted Answers: High trequency 4) Inthe islanded operation of the DC microgtid, suppose the batery reaches is lowest SOC limit which ofthe 4 point following action is mote preferable? Battery is allowed to drain out Vs oporated at oft MPPT Fckitional loads are switched on Non-Emergency loads are tuned off No, tno answor is nomect. See: 0 ‘Accopted Answers: "Non-Emergency foads are tumed off '5) During the steady state operation ofthe iin the case of stusies AC-DC hybrid system, the reactive power 4 point ‘supplied by the fast-acting converters (q. which take part inthe contingency station are Less than 40% ot tar avatabie rang More than 40% of cer avaiab2e rang Eiqual to 40% oftheir availa rating None of the above No, the answer is nec. Secie:0 Accepted Answers ‘Less than 40% oF nar avai rating 16) Tne typical bus voltage (Vm) range of the gna curing steacylaynamic state Is? 4 point .9pus vm 1.apu vm 1.10 None of the above. No, tne answer isincomeet. Score: 0 ‘Accepted Answers: ‘G.gpu vin = 2pu 77) Which of the folowrng statomont regarding demand side management Is ruc? point ‘The number of cevioes shifted can be a negative value “The number of devices shifted avay from a time step can be mote than the numberof devices available for contol at that tne step. Connection times of devices can oniy be delayed, and not brought forwarc ‘The devices can be delayed more than a predefined maxcmum iit No, the answer isincomeet Score’ 0 Accepted Answers: ‘Connection times of devices can only be delayed, and not brought forward 8) Which of the folovang DSM suatagies helps in raducng peak demand wih the Indust customers? 4 point ity ive Consumer driven mutt Objective ‘ot tne above No, the answer is incomes Scare: 0 ‘Accepted Answers: Al of the above 19) Which of the folowing is nt the objective of demand response? 4 point Maximization of Electricty Cost Mexmization of Social Weltare ‘Minimzaton of Aggregators Power Consumetion ‘Minimization oF both Eleccty Cost and Aggregators Power Consumption No, the ansirer is income, Sere 0 ‘Accepted Answers: ‘maximization of Electricty Cost 20 Eneigy elated OR belong to which ofthe following groups oF DR programs? 4 point DR hased on conto strategy DR based on price DR based on oa None of the above No, the answer is incomes Sere 0 ‘Accepted Answers: DR based on load

You might also like