Unit 8 - Week 7
Course outline
How to access the
portal
‘Wook 2
Week 2
Week 2
Week 4
Week 5
Week 6
Week 7
‘simutaton ana Caso
Staty OFAC Microgrid
‘Simulation and Case
‘stugy of DC
Microgea
‘Simulation and Case
Sut ofAC-DC
Hybrid Microgria
Demand Side
Managementin he
‘sman Grid
Demand Response
Analysis of Smart
na
‘quiz: Assignment 7
solutions:
Assignment-7
Week 8
DOWNLOAD VIDEOS
WEEKLY FEEDBACK
reviewer3@npteL.itm.ac.in v
Assignment 7
‘The due date for submiting this assignment has passed. Due on 2019-09-18, 23:59 IST.
‘As per our records you have nat submitted this assignment.
2) Which ofthe flowing fs rue inthe case of overexcited synchranaus generator? 4 point
sors reactive power
Inject reactive power
(Operates at tne unity power factor
None of the above
Np, the answer is incomes
Secre:0
‘Accepted Answers:
Iects reactive power
2) Which of the folloring statement is true in the grid connected operation of the AC microged? 4 point
Battery charging, PV at MPPT, diesel generator regulating the voltage and frequency
Battery charging, PV at off MPF, diesel generator regulating tne voltage and frequency
attory charging, PY at MPPT, cosa gonorator tured oft
None of the above
No, the answer is incomes
Secre’0
‘Accopted Answers:
‘Battery changing, PV a MPP, diesel generator turned off
3) While the dual active bridge converters are used to interface the two Autonomous DC microgids, the transformer 1 point
operates at?
\ery low frequency
Low trequency
Meat frequency
High frequency
No, the answer is incoect.
Sere: 0
Accepted Answers:
High trequency
4) Inthe islanded operation of the DC microgtid, suppose the batery reaches is lowest SOC limit which ofthe 4 point
following action is mote preferable?
Battery is allowed to drain out
Vs oporated at oft MPPT
Fckitional loads are switched on
Non-Emergency loads are tuned off
No, tno answor is nomect.
See: 0
‘Accopted Answers:
"Non-Emergency foads are tumed off
'5) During the steady state operation ofthe iin the case of stusies AC-DC hybrid system, the reactive power 4 point
‘supplied by the fast-acting converters (q. which take part inthe contingency station are
Less than 40% ot tar avatabie rang
More than 40% of cer avaiab2e rang
Eiqual to 40% oftheir availa rating
None of the above
No, the answer is nec.
Secie:0
Accepted Answers
‘Less than 40% oF nar avai rating
16) Tne typical bus voltage (Vm) range of the gna curing steacylaynamic state Is? 4 point
.9pus vm 1.apu
vm 1.10
None of the above.
No, tne answer isincomeet.
Score: 0
‘Accepted Answers:
‘G.gpu vin = 2pu
77) Which of the folowrng statomont regarding demand side management Is ruc? point
‘The number of cevioes shifted can be a negative value
“The number of devices shifted avay from a time step can be mote than the numberof devices available for contol at
that tne step.
Connection times of devices can oniy be delayed, and not brought forwarc
‘The devices can be delayed more than a predefined maxcmum iit
No, the answer isincomeet
Score’ 0
Accepted Answers:
‘Connection times of devices can only be delayed, and not brought forward
8) Which of the folovang DSM suatagies helps in raducng peak demand wih the Indust customers? 4 point
ity ive
Consumer driven
mutt Objective
‘ot tne above
No, the answer is incomes
Scare: 0
‘Accepted Answers:
Al of the above
19) Which of the folowing is nt the objective of demand response? 4 point
Maximization of Electricty Cost
Mexmization of Social Weltare
‘Minimzaton of Aggregators Power Consumetion
‘Minimization oF both Eleccty Cost and Aggregators Power Consumption
No, the ansirer is income,
Sere 0
‘Accepted Answers:
‘maximization of Electricty Cost
20 Eneigy elated OR belong to which ofthe following groups oF DR programs? 4 point
DR hased on conto strategy
DR based on price
DR based on oa
None of the above
No, the answer is incomes
Sere 0
‘Accepted Answers:
DR based on load