#1
PLTU 2X25 MWATT NUSA TENGGARA BARAT
PT. BARATA
®
INDONESIA
WELDER CERTIFICATE
NO: 022/ PLTU 2 NTB/ BRT GGM/2012
Name
Welder Stamp
Welding Proces
Welding Machine type
Welding Position
Welding Progression
Place and Date of Test
Welding Procedure Spesification No
Procedure Qualification Record No
Material Spesification Test
Thicknes Material
Thicknes Range
Single / Multi Pass
Current Polarity
Visual Inspection
Guide Bend Test
Radiography Test
Result
» MUSLEHUDDIN
W-CS-063
SMAW
: Kemppl Minare 220
Vertical 3G.
+ Uphill
PLTU2, Jeranjang NTB 19 June 2012
WPS, XA. 1,1N-163 Rev.0
POR, YA.1, 1N-24
Plate, SA 106 Gr C
8mm
4,76 ~ 50,00 mm
Multi Pass:
DCIEP
Accepted
NA
By PT, Bengawan Solo Teknik
‘Accepted /OS/BRT/BSTIB/2012
We cortity that the wolder has been tested in accordance with ASME sec I<
When the Welder has not welded wit the process during a priod of 6 mounths, Or period of 2 years
4. mounth for PT. Barata Indonasia Project) has | ‘4 it revalidation, his qualification for that process shail expire.
jue Date ; 27 June 2012
Witnessed / Approved by, Prepared & Inspected by,
M. Jainuddin
QC, inspector
QA/ QC. Manager