You are on page 1of 1
#1 PLTU 2X25 MWATT NUSA TENGGARA BARAT PT. BARATA ® INDONESIA WELDER CERTIFICATE NO: 022/ PLTU 2 NTB/ BRT GGM/2012 Name Welder Stamp Welding Proces Welding Machine type Welding Position Welding Progression Place and Date of Test Welding Procedure Spesification No Procedure Qualification Record No Material Spesification Test Thicknes Material Thicknes Range Single / Multi Pass Current Polarity Visual Inspection Guide Bend Test Radiography Test Result » MUSLEHUDDIN W-CS-063 SMAW : Kemppl Minare 220 Vertical 3G. + Uphill PLTU2, Jeranjang NTB 19 June 2012 WPS, XA. 1,1N-163 Rev.0 POR, YA.1, 1N-24 Plate, SA 106 Gr C 8mm 4,76 ~ 50,00 mm Multi Pass: DCIEP Accepted NA By PT, Bengawan Solo Teknik ‘Accepted /OS/BRT/BSTIB/2012 We cortity that the wolder has been tested in accordance with ASME sec I< When the Welder has not welded wit the process during a priod of 6 mounths, Or period of 2 years 4. mounth for PT. Barata Indonasia Project) has | ‘4 it revalidation, his qualification for that process shail expire. jue Date ; 27 June 2012 Witnessed / Approved by, Prepared & Inspected by, M. Jainuddin QC, inspector QA/ QC. Manager

You might also like