A2 B C D E

A
RB-3
1 1
S3 5"Tk S7
5"Tk

9'-6"

RB-2
STAIR
RB-4
S3 5"Tk
2 2

9'-6"
2'-9"

1'-0"
3 3
RB-8 5"Tk S7
S3 5"Tk S2 5"Tk

9'-412"
RB-1
7'-512"
LIFT
SCHEDULE OF BEAMS

RB-1
S3
RB-4
5"Tk BEAM BEAM DIMENSIONS
RB-2 BEAM ID
5"Tk S5 TYPE B D

9'-412"
RB-1 0'-9" 1'-3"

1'-0"
4 4 0'-9" 1'-6"
RB-8 RB-2
S3 S2 5"Tk S2 5"Tk
5"Tk
8' RB-3 0'-9" 1'-6"
9'-412"
RB-4 0'-9" 1'-6"

RB-4
RB-5 0'-9" 1'-9"
S3 5"Tk
RB-6 0'-9" 1'-9"

RB-3
9'-412"

RB-7 0'-9" 1'-9"


1'-0"

5 5 RB-8 1'-0" 2'-0"


RB-8
S3 5"Tk S2 5"Tk S2 5"Tk
RB-9 1'-0" 2'-0"
9'-412"

RB-6

RB-5
S3 5"Tk SCHEDULE OF SLAB
9'-412"

SLAB SLAB
SLAB ID
TYPE TK
1'-0"

6 6 1-Way
RB-8 S1 5" Tk
S3 5"Tk S2 5"Tk S2 5"Tk
S2 1-Way 5" Tk
9'-412"

S3 1-Way 5" Tk
RB-3

RB-5 S4 1-Way 512" Tk


S3 5"Tk
S5 2-Way 5" Tk
RB-3
9'-412"

S6 2-Way 5" Tk
1'-0"

7
RB-8
7 S7 MAT 5" Tk
S3 5"Tk S2 5"Tk S2 5"Tk Cantilever
S8 412" Tk
9'-412"

Slab
RB-6

RB-5
S3 5"Tk
9'-412"

1'-0"

8 8
RB-8
S3 5"Tk
8'-3"

LIFT
RB-1

STAIR
9 9
RB-6
S4 512"Tk
RB-2

LIFT

10 10
11'

RB-2
S7 5"Tk
1'-0"

11 11
RB-9
S3 5"Tk S2 5"Tk S2 5"Tk
8'-712"

8'-412"

RB-5
S3 5"Tk
RB-3
8'-712"

1'-0"

12 12
RB-6

RB-9
S1 5"Tk
As Per Site

S2 5"Tk S2 5"Tk

15 PROJECT: PROPOSED CONSTRUCTION OF


RB-5 COMMERCIAL BUILDING
As Per Site

S1 5"Tk @ TUTICORIN.
CLIENT: Mr. K. PERUMALSAMY
1'-0"

13 13
DEVELOPER: VIJAYALAKSHMI INFRASTRUCTURES Pvt.Ltd.,

RB-9 PROPOSED SHUTTERING LAYOUT OF


S3 5"Tk 5"Tk DRG. NAME:
S5
As Per Site

STILT ROOF BEAMS

TYPE G.F.C.D SIGNATURE W

S8 JOB. NO DRG. NO DRN/CKD DSN/APD S N

1 Tk 717 SD-01 E
RB-7 4 2"
S3 5"Tk
As Per Site

RB-8
14 14 00 09.08.22 -- M.Y N.S K.N STM
-3
1'-0"

5"Tk RB REV DSN DRN CHK APP


NO DATE DESCRIPTION
S6
This Portion of Structure
will be Isolated.
5'

ge
b Ed
Sla

or
df
ere
si d n
C on ors, cutio
lly Flo Exe
c tura very For
u E nal
Str o
pti
tO
Bu
15
A PROPOSEDS SHUTTERING LAYOUT OF STILT ROOF BEAMS

You might also like