Professional Documents
Culture Documents
A
RB-3
1 1
S3 5"Tk S7
5"Tk
9'-6"
RB-2
STAIR
RB-4
S3 5"Tk
2 2
9'-6"
2'-9"
1'-0"
3 3
RB-8 5"Tk S7
S3 5"Tk S2 5"Tk
9'-412"
RB-1
7'-512"
LIFT
SCHEDULE OF BEAMS
RB-1
S3
RB-4
5"Tk BEAM BEAM DIMENSIONS
RB-2 BEAM ID
5"Tk S5 TYPE B D
9'-412"
RB-1 0'-9" 1'-3"
1'-0"
4 4 0'-9" 1'-6"
RB-8 RB-2
S3 S2 5"Tk S2 5"Tk
5"Tk
8' RB-3 0'-9" 1'-6"
9'-412"
RB-4 0'-9" 1'-6"
RB-4
RB-5 0'-9" 1'-9"
S3 5"Tk
RB-6 0'-9" 1'-9"
RB-3
9'-412"
RB-6
RB-5
S3 5"Tk SCHEDULE OF SLAB
9'-412"
SLAB SLAB
SLAB ID
TYPE TK
1'-0"
6 6 1-Way
RB-8 S1 5" Tk
S3 5"Tk S2 5"Tk S2 5"Tk
S2 1-Way 5" Tk
9'-412"
S3 1-Way 5" Tk
RB-3
S6 2-Way 5" Tk
1'-0"
7
RB-8
7 S7 MAT 5" Tk
S3 5"Tk S2 5"Tk S2 5"Tk Cantilever
S8 412" Tk
9'-412"
Slab
RB-6
RB-5
S3 5"Tk
9'-412"
1'-0"
8 8
RB-8
S3 5"Tk
8'-3"
LIFT
RB-1
STAIR
9 9
RB-6
S4 512"Tk
RB-2
LIFT
10 10
11'
RB-2
S7 5"Tk
1'-0"
11 11
RB-9
S3 5"Tk S2 5"Tk S2 5"Tk
8'-712"
8'-412"
RB-5
S3 5"Tk
RB-3
8'-712"
1'-0"
12 12
RB-6
RB-9
S1 5"Tk
As Per Site
S2 5"Tk S2 5"Tk
S1 5"Tk @ TUTICORIN.
CLIENT: Mr. K. PERUMALSAMY
1'-0"
13 13
DEVELOPER: VIJAYALAKSHMI INFRASTRUCTURES Pvt.Ltd.,
1 Tk 717 SD-01 E
RB-7 4 2"
S3 5"Tk
As Per Site
RB-8
14 14 00 09.08.22 -- M.Y N.S K.N STM
-3
1'-0"
ge
b Ed
Sla
or
df
ere
si d n
C on ors, cutio
lly Flo Exe
c tura very For
u E nal
Str o
pti
tO
Bu
15
A PROPOSEDS SHUTTERING LAYOUT OF STILT ROOF BEAMS