Bidding Document No.: Tender No. CO CONTS/0015K/NTTPP/EPC/e-conts/2020, dt. 18.11.2020.
Name of the Work: Infrastructure Work and Single Package Engineering,
Procurement & Construction (EPC) required for its 3x800 MW NLC Talabira Thermal Power Project (hereinafter referred to as NTTPP), near Kumbhari & Tareikela villages in Jharsuguda District, Odihsa, India S. No To be Modified as
The Bidder should have executed on single package EPC (Engineering,
Procurement and Construction) basis, at least one pulverized Coal fired Thermal Power Plants, with minimum unit capacity of 500MW and the scope of works in such plants should have included at least Steam Generator, Steam Turbine Generator sets along with their associated 1 auxiliary equipment and the BOP (Balance of Plant) comprising Coal Handling plant, Ash handling plant, Cooling Towers, Chimney, Water Treatment Plant including associated civil works for the above equipment & systems should have been commissioned during the last 20 years and should have achieved CoD and should be in opertaion as on the date of bid submission.