DAILY ACTIVITY REPORT

Report : Boiler, Coal Handling System, Ash Handling System


Date : 19/07/2022

No Description Pictured Note


1 Ash Silo Continue welding cassing
ash silo section 2

2 Ash Silo Continue welding


structure ash silo

3 Sampling Rack Cooler Continue fabrikasi


sampling rack cooler
DAILY ACTIVITY REPORT
4 Boiler Continue install header
pipe drain blowdown

5 Boiler Continue install rockwool


water wall left boiler

6 Boiler Install cover clading front

7 Boiler Continue install cladding


boiler water wall front