QUALITY CHECKLIST FOR SITE WORKS

EARTH WORK/ BACKFILLING


ARCHITECTURAL STRUCTURAL SITE SERVICES & UTILITY
DEVELOPMENT
Name of the Customer: Date:

Project Name: Project ID:

Name of the Contractor: Location:

Drawing Ref. No.: Quantity:

Sl.No. Description YES NO NA


1 Surveying Complied?
2 Whether suitable arrangements for re-routing the service
lines done?
3 Is the LAYOUT, ALIGNMENT and SIZE of Excavation
marked
on the ground as per drawings?
4 Is adequate shoring, strutting done?
5 Check for DEWATERING. Is it O.K.?

6 Is the excavation done up-to the level as per drawing.

A. NATURAL EXISTING GROUND LEVEL :

B. FOUNDING LEVEL :

C. DEPTH OF EXCAVATION :

BACKFILLING

1 Is the earth used for filling as per specification?

2 Check for the approved method of compaction, ie. (Roller,


plate compactor, etc.,)

3 Whether Proctor compaction test carried out satisfactorily


as per the requirement?
CORRECTIVE ACTION PROPOSED- Item wise.
If 'No' is marked, please specify reasons and thereafter corrective action proposed.
(Add additional sheets, if necessary)

Contractor's Rep.: Client Rep.: Lemcon Rep.: