You are on page 1of 2
CODES AND STANDARDS GOVERNING GAS SYSTEM FACILITIES Well Flow Line Well Head Heater Dehydrator Gathering System ees, ‘Test Facility ; i cus. cus, ask Exosa A eva, Pipe Line Pipe tine asmeseevn SME See. vin : Pipe Lie eva, (esazaen) lesazery | ASME B13) Easwee-313) : (esa 2062) wry Gas Processing Plant Gathering System | ‘Fleld Compression — | f EL] cue compression ie tte) evs, (ASME See. vl |) mE nose Pipetine ASME 0313 i Pe Line baste see van : esazesn ASME Batt Fo esazena, ASME 8-913) ASME DS) NB. lng under Saety Codes Act itltion ineadesundarround ping wit tens shown. ‘ha Pipsline Division af he EUS requis tha Be spline be li Therefore the est and ot ave tay plato fly we parte pte under EUS whthert ine e fence ont ote {cs 2#62.4 (oll and Gas Plptine Systems) Also Inchites Compreesor Staton wihin'ts Scope and may pote xétoal requirements ‘The Pipeline Act Pat 1 Set2 (places Jreton for ol, possue vases an pressure piping under the Sally Coses Act well et wens Ne. tote CODES AND STANDARDS GOVERNING OIL SYSTEM FACILITIES Flow Line ‘Test Facilty $F diphase Fis A988 { rerera-tiasa) | (ASMESee. val (esazeen swe 8313), water Source ‘welt Dating taray __ Gathering System Central Battery Pipe Lines ies (5A 2589) 5 fae on Pip Lise : Pe tne Fa : (esazesn ret cPR-1282) Toe (esazen nt Fine ine : | (enna 4 nose ue. : (iste see vi ; Pete sme et3) (esazen, H cee rf Fiction wen ‘Piping under Safty Codes Act ation lacus anderroune piping wth te iit show Tha Plplioe Ovi af he CUB regu (94 2662.9 (0H apd Ge pte Sys) ‘The Pipatioe Act Patt ect 2() places Jrsdeto for bole hat ath ppl lease by avalve. ADSA doesnot hae the sa concer, “Thareore the Fest ane stave any palo lly wba prt oth pela ander EUS whathor ls ns the neds Compreeror Slaton waite See pressura vests and press piping under he Safety Codes Act end ey Impose atonal aqlrmens cus. wry ASA

You might also like