Professional Documents
Culture Documents
Alat Gamping10
Alat Gamping10
[ABSENT] - - 0 0- -
[16.6242,21.1726] - - 0 0- -
[21.1726,25.7209] - - 0 0- -
[25.7209,30.2693] - - 0 0- -
[30.2693,34.8176] - - 0 0- -
[34.8176,39.366] - - 0 0- -
[39.366,43.9144] - - 0 0- -
[43.9144,48.4627] - 2.28 377137.4 165411.2 2 47.86166
[48.4627,53.1111] - 2.28 85302.75 37413.49 2 48.68857
Totals - 2.28 462440.2 202824.6 2 48.01419
STANDBY TIME
Waktu peledakan 30 menit/hari Jam 0.5 0.5 0.5
Istirahat makan 60 menit/shift Jam 2 2 2
Penggantian shift harian 30 menit/shift Jam 1 1 1
Pengisian bahan bakar 30 menit/shift Jam 1.00 1.00 1.00
Ibadah jumat 60 menit/minggu Jam 0.14 0.14 0.14
General safety talk 60 menit/minggu Jam 0.14 0.14 0.14
Waktu briefing 10 menit/hari Jam 0.33 0.33 0.33
Pengecekan alat (P2H) 15 menit/hari Jam 0.50 0.50 0.50
Rolling shift 480 menit/minggu Jam 1.14 1.14 1.14
Road Maintenance 15 menit/hari Jam 0.25 0.25 0.25
DELAY TIME
Rain Duration 360 jam/tahun Jam 0.99 0.99 0.99
Slippery Time 35 % 0.35 0.35 0.35
Jam kerja yang tersedia per hari Jam 15.66 15.66 15.66
Utilization of working hour Persen 85% 85% 85%
Jam kerja efektif per hari Jam 13.31 13.31 13.31
Jam kerja efektif per tahun Jam 4750.99 4750.99 4750.99
Tahun
4 5 6 7 8 9 10 11 12 13
2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
366 365 365 365 366 365 365 365 366 365
8 8 8 8 8 8 8 8 8 8
358 357 357 357 358 357 357 357 358 357
51 51 51 51 51 51 51 51 51 51
2 2 2 2 2 2 2 2 2 2
24 24 24 24 24 24 24 24 24 24
60 60 60 60 60 60 60 60 60 60
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
15.66 15.66 15.66 15.66 15.66 15.66 15.66 15.66 15.66 15.66
85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
13.31 13.31 13.31 13.31 13.31 13.31 13.31 13.31 13.31 13.31
4764.30 4750.99 4750.99 4750.99 4764.30 4750.99 4750.99 4750.99 4764.30 4750.99
14
2034
365
8
357
51
2
24
60
0.5
2
1
1.00
0.14
0.14
0.33
0.50
1.14
0.25
0.99
0.35
15.66
85%
13.31
4750.99
1 2
TAHUN
2021 2022
Target Produksi per tahun (BCM) 200000 400000
Produksi Gamping Akumulasi (BCM) 202824.60 604262.99
Produksi Gamping per tahun (BCM) 202824.60 401438.39
Produksi Gamping per jam (BCM) 42.69 84.50
Overburden per tahun (BCM) 61871.10 105676.56
Overburden per jam (BCM) 13.02 22.24
Produksi total per tahun (BCM) 264695.70 507114.95
Produksi total per jam (BCM) 45.10 86.40
Kadar rata-rata CaO 48.01 47.71
Stripping ratio 0.31 0.26
8 9
TAHUN
2028 2029
Target Produksi per tahun (BCM) 600000 600000
Produksi Gamping Akumulasi (BCM) 4225756.09 4829782.04
Produksi Gamping per tahun (BCM) 604025.96 604025.96
Produksi Gamping per jam (BCM) 126.78 127.14
Overburden per tahun (BCM) 80478.14 80478.14
Overburden per jam (BCM) 16.89 16.94
Produksi total per tahun (BCM) 684504.09 684504.09
Produksi total per jam (BCM) 143.67 144.08
Kadar rata-rata CaO 47.90 47.90
Stripping ratio 0.13 0.13
3 4 5 6 7
2023 2024 2025 2026 2027
600000 600000 600000 600000 600000
1208399.65 1809295.10 2413678.22 3017704.18 3621730.13
604136.67 600895.44 604383.13 604025.96 604025.96
127.16 126.12 127.21 127.14 127.14
139705.74 144872.38 72037.89 80478.14 80478.14
29.41 30.41 15.16 16.94 16.94
743842.41 745767.82 676421.02 684504.09 684504.09
126.73 126.70 115.24 116.62 116.62
48.08 48.47 49.06 47.90 47.90
0.23 0.24 0.12 0.13 0.13
10 11 12 13 14
2030 2031 2032 2033 2034
600000 600000 600000 600000 600000
5433808.00 6037751.89 6641695.78 7245639.67 7849583.56
604025.96 603943.89 603943.89 603943.89 603943.89
127.14 127.12 126.76 127.12 127.12
80478.14 104593.93 104593.93 104593.93 104593.93
16.94 22.02 21.95 22.02 22.02
684504.09 708537.82 708537.82 708537.82 708537.82
144.08 149.13 148.72 149.13 149.13
47.90 46.99 46.99 46.99 46.99
0.13 0.17 0.17 0.17 0.17
WHEEL LOADER
GAMPING
Komatsu WA250-5
Bucket capacity (heaped) 2.7 m3
Bucket fill factor 0.8 difficult loading
Swell factor (gamping) 67%
Density (gamping) 2.28 kg/m3
Horsepower 140 HP
Cycle time 0.7 menit
Efisiensi : 61.20%
1. Efisiensi alat 80% average
2. Efisiensi manusia (operator) 85%
3. Efisiensi kondisi kerja 90%
WASTE
Komatsu WA120-3
Bucket capacity (heaped) 1.5 m3
Bucket fill factor 0.8
Swell factor (batu pasir) 54%
Density (batu pasir) 1.8 kg/m3
Horsepower 85 HP
Cycle time 0.7 menit
Efisiensi : 61.20%
1. Efisiensi alat 80% average
2. Efisiensi manusia (operator) 85%
3. Efisiensi kondisi kerja 90%
WASTE (PASIR)
GAMPING
lebar 2545 mm
panjang 9290 mm
beban 21147.8637485 Pa
GAMPING
Tahun Cmt (menit) Cms C Et Produktivitas (loose) Produktivitas (insitu)
1 20.34 0.7 17.28 0.85 35.69 23.91
2 20.54 0.7 17.28 0.85 35.33 23.67
3 20.93 0.7 17.28 0.85 34.68 23.23
4 21.74 0.7 17.28 0.85 33.38 22.36
5 21.90 0.7 17.28 0.85 33.13 22.20
6 22.09 0.7 17.28 0.85 32.85 22.01
7 22.32 0.7 17.28 0.85 32.51 21.78
8 22.56 0.7 17.28 0.85 32.18 21.56
9 22.79 0.7 17.28 0.85 31.85 21.34
10 23.02 0.7 17.28 0.85 31.53 21.12
11 25.53 0.7 17.28 0.85 28.42 19.04
12 26.65 0.7 17.28 0.85 27.23 18.24
13 27.25 0.7 17.28 0.85 26.63 17.84
14 27.65 0.7 17.28 0.85 26.25 17.59
WASTE
Pushback Cmt (menit) Cms C Et P (loose) P(insitu)
1 7.78 0.7 6 0.85 32.40 17.49
2 7.99 0.7 6 0.85 31.55 17.04
3 8.37 0.7 6 0.85 30.10 16.26
4 8.79 0.7 6 0.85 28.68 15.49
5 9.35 0.7 6 0.85 26.96 14.56
6 9.53 0.7 6 0.85 26.43 14.27
7 9.77 0.7 6 0.85 25.81 13.93
8 10.00 0.7 6 0.85 25.21 13.61
9 10.23 0.7 6 0.85 24.63 13.30
10 10.46 0.7 6 0.85 24.08 13.01
11 12.98 0.7 6 0.85 19.42 10.49
12 14.09 0.7 6 0.85 17.88 9.65
13 15.21 0.7 6 0.85 16.57 8.95
14 15.79 0.7 6 0.85 15.96 8.62
MATCH FACTOR >1
Dozer D51EX 1
Backhoe PC 27MR-3 2
Compactor JV25CW-6 1
Greder XCMG Motor Grader GR135 2
Alat Pendukung Bus Coaster Bus 2
Truk untuk Bahan Bakar Hino 338 1
Water Truck UD CWA 260X 1
Mobil Light Tower TEREX AL4000 4
Handy Talkie Teno Handy Talkie TN 322 20
Generator YANMAR 50KVA 1
Total Station Topcon Total Station GTN105N 2
Alat Eksplorasi
GPS Garmin 64S 2
Jaw Crusher Zenith PEW 860 1
Cone Crusher HCC 66D Coarse 1
Alat Pengolahan Belt Conveyor B650 1
Rock Breaker PC200 + rock breaker 1
Vibrating Feeder ZSW-590*110 1
Komputer Komputer rakitan 5
Alat Kantor AC 1/2 PK Panasonic R32 8
Printer EPSON L385 3
Light Vehicle Mitsubishi Triton 4x4 5
Alat K3 Rambu Keselamatan 30
Pompa Hydrant 3
Hydraulic Drilling Sandvik Pantera DP1500i 1
Mobile Mixing Unit HOWO 8x4 Driving Type 1
Alat Pengeboran dan Peledakan
Electric Blasting Machine 1
Ohm Meter 1
Beton bulat untuk pond Asiacon 1
Culvert Udeck untuk sedimen pond Asiacon 1
Beton Bulat untuk Jalan Asiacon 15
Tahun
2 3 4 5 6 7 8 9 10 11 12 13 14
2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1
4 6 6 6 6 6 6 6 7 7 7 8 8
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
4 4 4 4 4 4 4 4 4 4 4 4 4
20 20 20 20 20 20 20 20 20 20 20 20 20
1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
5 5 5 5 5 5 5 5 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3 3 3 3 3 3
5 5 5 5 5 5 5 5 5 5 5 5 5
0 0 0 0 0 0 0 0 0 0 0 0 0
3 3 3 3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
Tahun Tonase gamping Mining Recovery Milling recovery Tonase pengolahan
1 462440.09 0.99 0.97 444081.22
2 915279.52 0.99 0.97 878942.93
3 1377431.60 0.99 0.97 1322747.56
4 1370041.61 0.99 0.97 1315650.96
5 1377993.53 0.99 0.97 1323287.18
6 1377179.18 0.99 0.97 1322505.16
7 1377179.18 0.99 0.97 1322505.16
8 1377179.18 0.99 0.97 1322505.16
9 1377179.18 0.99 0.97 1322505.16
10 1377179.18 0.99 0.97 1322505.16
11 1376992.07 0.99 0.97 1322325.49
12 1376992.07 0.99 0.97 1322325.49
13 1376992.07 0.99 0.97 1322325.49
14 1376992.07 0.99 0.97 1322325.49
Volume Pengolahan
194772.46338
385501.283333518
580152.440551971
577039.89534391
580389.1149375
580046.12497062
580046.12497062
580046.12497062
580046.12497062
580046.12497062
579967.318287225
579967.318287225
579967.318287225
579967.318287225