PROJECT: FACTORY
Total Dhs. TWENTY FOUR THOUSAND THREE HUNDRED AND SEVENTY FIVE DIRHAMS 24375.00 AED
ONLY.
PLS NOTE.
* MOBILIZATION TO SITE WILL BE WITHIN 2 DAYS AFTER RECEIVING YOUR APPROVAL.
* DRILLING AS SPECIFIED IN BS 5930:2015 – SAMPLING AND STANDARD PENETRATION TEST AT SITE FOR
25 BOREHOLES TO 15 METER DEPTH EACH.
* PARTICLE SIZE DISTRIBUTION TEST FOR SOIL STRATUM AS PER BS 1377 PART 2.
* CHEMICAL ANALYSIS OF SOIL & WATER SAMPLE AS PER BS 1377 PART 3.
* DEVELOPING CONCLUSIONS AND RECOMMENDATIONS FOR FOUNDATION DESIGN AND
CONSTRUCTION.
* PERCUSSION DRILLING MACHINE WILL BE USED AT SITE.
* REPORT WILL BE READY 2 DAYS AFTER FINISH SITE WORK