Professional Documents
Culture Documents
REMOVAL
1. Remove master cylinder and gasket.
2. Disconnect vacuum hose from the booster.
3. Remove the shift knock cable (A/T) and then remove joint pin and snap pin.
INSTALLATION
1. When installing the booster assembly, replace the packing of each end of booster installation holder.
2. Insert the booster and tighten the nut.
Tightening torque :
19 - 26 N·m (1.9 - 2.6 kg-m, 13 - 18 lb-ft)
3. Connect the booster push rod and brake pedal with a joint pin and install a snap pin to the joint pin and then
install the shift knock cable (A/T).
Permissible play :
1.2 - 1.7 mm (0.047 - 0.067 in.)
Tightening torque :
10-16 Nm (1.0-1.6 kg-m, 7-11 lb-ft)