RENCANA USULAN KEGIATAN KELOMPOK (RUKK)

KEGIATAN : PEMBANGUNAN PRASARANA PERTANIAN


SUB KEGIATAN : PEMBANGUNAN, REHABILITASI DAN PEMELIHARAAN JARINGAN IRIGASI USAHA TANI
PEKERJAAN : PEMBANGUNAN IRIGASI AIR TANAH DANGKAL/SUMUR LAPANG
SUB SEKTOR : TAHANAN PANGAN
KELOMPOK TANI : NGUDI RAHAYU
DESA / KELURAHAN : DS. SARIREJO
KECAMATAN : BOGOREJO
KAB / KOTA : BLORA
PROVINSI : JAWA TENGAH
SUMBER DANA : APBN
TAHUN ANGGARAN : 2022

No Kegiatan Vol Sat Harga Jumlah Total

1 2 3 4 5 6 7

A Tenaga Kerja
1. Pekerja 432.000 OH 90,000.00 38,880,000.00
2. Tukang 162.000 OH 120,000.00 19,440,000.00
JUMLAH A 58,320,000.00
B Bahan / Material
1 Besi 2049.17 kg 11,500.00 23,565,432.00
2 Kawat Bendrat 43.00 kg 17,000.00 731,000.00
3 Kayu Perancah 146.00 m3 24,000.00 3,504,000.00
4 Paku 58.12 kg 2,500.00 145,300.00
5 Minyak Bekisting 29.06 ltr 11,500.00 334,190.00
6 Plywood 9 mm 18.00 Lbr 133,210.00 2,397,780.00
7 Bambu 96.92 btg 22,000.00 2,132,132.20
8 Pasir 20.00 m3 280,000.00 5,600,000.00
10 Semen 280.00 kg 50,000.00 14,000,000.00
13 Kerikil Untuk Beton 14.66 m3 240,000.00 3,517,216.80
14 Air 11922.00 Lltr 50.00 596,100.00
15 Bata Merah 18.00 m2 45,500.00 819,000.00
16 Batu Belah 3.00 m3 280,000.00 840,000.00
17 Pipa PVC S-12,5 dia.2.5" 531.61 m1 45,000.00 23,922,419.68
18 Stop Valve PVC 2" 2.00 bh 40,000.00 80,000.00
19 Tangga Pipa Galvanis Finish Cat + Gembok 1.00 unit 2,310,000.00 2,310,000.00
20 Pipa Pengisi ( Inlet ) PVC 2" 9.00 m1 40,000.00 360,000.00
21 Pipa Outlet PVC 2.5" 7.00 m1 45,000.00 315,000.00
22 Pipa Penguras PVC 3" 7.00 m1 60,000.00 420,000.00
23 Klam Penjepit Pipa 12.00 bh 10,000.00 120,000.00
24 Pintu Aluminium 1.00 bh 1,800,000.00 1,800,000.00
25 BP KWH Meter 1 Fasa Daya 2200 VA 1.00 unit 3,603,000.00 3,603,000.00
26 Kabel NYY 3 x 2,5 mm 350.00 m1 15,000.00 5,250,000.00
27 Box Panel Listrik Outdoor Topi 60X40X20Cm 1.00 bh 1,000,000.00 1,000,000.00
28 Pipa Galvanis 2" 60.00 m1 50,000.00 3,000,000.00
29 Kabel Submersible 3 Core Flat Cables 3 x 1.5 350.00 m1 22,000.00 7,700,000.00
30 WLC otomatis 2.00 uit 3,000,000.00 6,000,000.00
31 Konstr. Jaringan lurus 13.00 titik 50,000.00 650,000.00
32 Water Flushing 1.00 bh 850,000.00 850,000.00
33 Air Lifting 1.00 jam 300,000.00 300,000.00
34 Pemasangan dan pembongkaran peralatan uji 1.00 bh 450,000.00 450,000.00
35 Pumping test 1.00 jam 300,000.00 300,000.00
36 Check Valve 2" 1.00 bh 295,000.00 295,000.00
37 Gate Valve 2" 1.00 bh 390,000.00 390,000.00
38 Pipa PVC dia. 2" 46.00 m1 38,000.00 1,748,000.00
39 Pengeboran 30.00 m1 300,000.00 9,000,000.00
40 AF Bend PVC dia. 2" - 450 5.00 bh 28,000.00 140,000.00
41 AF Bend PVC dia. 2" - 900 10.00 bh 28,000.00 280,000.00
42 Stop Valve PVC (2") 2.00 bh 50,000.00 100,000.00
43 Pipa Cassing PVC Dia. 4" kelas AW 20.00 m1 213,000.00 4,260,000.00
44 Pipa Screen PVC Dia. 4" kelas AW 10.00 m1 213,000.00 2,130,000.00
45 Papan Informasi K3 1.00 bH 150,000.00 150,000.00
46 Topi pelindung (Safety helmet) 5.00 bh 25,000.00 125,000.00
47 Pelindung pernafasan dan mulut (Masker) 5.00 bh 10,000.00 50,000.00
48 Sepatu keselamatan (Sepatu boot) 5.00 Psg 60,000.00 300,000.00
49 Peralatan P3K (Kotak P3K, Obat Luka, Perban, Dll) 1.00 Ls 75,000.00 75,000.00
50 Ball Valve ONDA PVC 2.5" 12.00 bh 85,000.00 1,020,000.00
JUMLAH C 135,655,570.68

TOTAL JUMLAH 194,995,570.68


DIBULATKAN 194,995,500.00

Terbilang : Seratus Sembilab Puluh Empat Juta Sembila Ratus Sembilan Puluh Lima Ribu Lima Ratus Rupiah 194,995,500.00

Blora, ………………………….

Disetujui oleh : Disetujui oleh : Penyusun :


Kordinator BPP Kec. Bogorejo Ketua Kelompok Tani Fasilitator DAK TA. 2022
Ngudi Rahayu

Lagiyono Priyanto Reza Adhadi Putra Utomo


NIP. 19660513 198803 1 008 Ketua

Mengetahui,
PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN

Lilik Setyawan, SP.MM Sofwan Rifai, SP. MM


NIP. 19800527 200501 1 007 NIP. 19850527 201101 1 014