You are on page 1of 1

e)

.24

+2
d) CR

5
24 (B
.
R. N )
.C AI 24

+5
(B R.
DR

0
N .C
JU S (B

24
S
ER

+7
.3
RO HI
R

5
8
.T

24 6.1
24
. C 00 AK

2
.5 13
.6
NG 8+73 NG 59+ G. 2

28

P.
1
BA
9

15
BA Hm.1 AN 59+2
24
.7 .15 LEGENDA

7
24
HM

26 .85723 2
77
.4 +2 B .1

.2 0
25 5. .94
+75 P.159
82
Hm

61
2 5
5 +25 +50 +17

2
2 2
25 6.0 26 5.0 P.158

+24.000
.2 49

+24.000
2 .3 0 24
49 25 5.9 60 1 .4
11
24 24.356
26 .76 54 24 24.453 24.574 24.586

26 .30
.3 8 26 .99 .68

.3
.5 4 2 23.756 24.665

25
68

52
2 85 25.406 25.418
25 2 6
26 5.8.01 25 24.699 24.648 25.448
JALAN

4
.0 .8 24.565 25.216
41 2 .1 5 1 26 52 25.159 25.398 25.440
25 6.2 12 9 .18 24.639 26.359 26.052 25.903 25.505
.5 05 1 26.088 26.662
29 2 26.159 25.890 25.451
2 6.1 25.871 22.952 24.312
25 2 5.6 23 26.032 25.883 25.699 25.483 26.652 25.058 23.587
KONTUR
.2 2 5.8 56 25.696 25.881 25.890 25.844 22.795 25.469
87 256.0924 25.792
26.312 26.081 26.200 26.083 25.225
.25 6
6 26.167 25.840 24.877 24.624 24.446
25 25.554 25.238
.11
5 24.201 24.276 24.258 21.295 25.424 DESA
+5 24.989

+24.000
+23.000
+22.000

+21.000
25.312

+21.000

SALURAN
+23.000
+25.000
0

+25.000
+25.000
+75

RAMBUT
MAKAM

SAWAH

TEGALAN

KEBUN

KALI

JEMBATAN

d) e) GORONG - GORONG
R .24 .24
.C .C
R
(B (B
N UN B. SADAP
J AI )
ER DR .24
.T CR
NG 8+73 O SS ( B. B. BAGI
A
B .15 R IR
HM
.C KH
NG +00 . A
+27.00 BA .159 NG +22 TERJUNAN
H m A
B .15 9
Hm
+26.00 B. PELIMPAH SAMPING

+25.00
B. PEMBUANG
+24.00
TALANG
+23.00

SCALE V +22.00
0 5 100 15 20
+21.00

SCALE H +20.00
0 50 2000 150 200
+19.00

+18.00
bidang persamaan/reference level
0+5
+ 17.00 m
PATOK HEKTOMETER
Hm.157 Hm.158 Hm.159
HECTOMETER STONE
NOMOR PROFIL P.157 P.157+25 P.157+50 P.157+75 P.158 P.158+25 P.158+50 +73 +75 P.159 +4 +17+22
PROFILE NUMBER
JARAK PROFIL/DISTANCE
6942.00

6967.00

6992.00

7017.00

7042.00

7067.00

7092.00

7115.00
7117.00

7142.00
7146.00

7159.00
7164.00

JARAK LANGSUNG 25.00 25.00 25.00 25.00 25.00 25.00 23.00 25.00 13
ACCUMULATED DISTANCE
ELEVASI TANGGUL KIRI
25.95

26.01

26.12

26.05

25.88

25.87

25.89

26.66
26.66

25.51
25.52

25.52
25.45
YANG ADA/EXISTING

EXISTING LEFT BANK LEVEL

ELEVASI TANGGUL KANAN


26.35

26.11

25.82

26.31

26.08

25.88

25.89

26.61
26.65

25.06
25.16

25.52
25.47

EXISTING RIGHT BANK LEVEL


25.77

25.86

25.65

25.79

25.67

25.70

25.48

25.04
22.95

24.31
24.36

23.92
23.59

ELEVASI DASAR SALURAN PADA AS


EXISTING CANAL BED LEVEL
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE

ELEVASI TANGGUL
RENCANA/DESIGN

BANK LEVEL
25.51

25.49

25.47

25.44

25.42

25.40

25.38

25.36
24.41

24.40

24.39
24.38

ELEVASI MUKA AIR RENCANA


DESIGN WATER LEVEL
24.88

24.86

24.84

24.81

24.79

24.77

24.75

24.75
23.78

23.77

23.11

ELEVASI DASAR SALURAN


CANAL BED LEVEL

PASANGAN KIRI

PASANGAN KANAN

TIPE BANGUNAN
TYPE OF STRUCTURE

DIMENSI SALURAN DAN DATA TAMBAHAN RUAS 27

DIMENSI SAL. SUPLESI


CACABAN RAMBUT

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI PEMALI JUANA
ANAU J I L AME P R I A N A T A A F N AME P N AG
N I RA J NAANASKA L EP T VNS
A l a m a t : Jl. B r i g j e n S. S u d i a r t o 3 7 5 T l p. F a x. 6 7 3 2 0 4 6 Semarang
PEKERJAAN REHABILITASI DI CACABAN PAKET I GAMBAR NO. REGISTER

SITUASI & POTONGAN MEMANJANG NO. LEMBAR 08


CONSTRUCTION DRAWING P.157 - P.159+22
JUMLAH LEMBAR 08
KONTRAKTOR : PT. MITRA WARDHANA
NO KONTRAK : HK 0201/Ao.9.1/Ao.9/02/IV/2021 DISETUJUI
DIUKUR DIGAMBAR MENGETAHUI KONSULTAN SUPERVISI KORDINATOR PELAKSANA PPK IRIGASI DAN RAWA I

Hendrar Pradigdo Ir. Kusumo Budiarko Puguh Wahyudi, ST. MT. Heri Santoso, ST. MPSDA.
Didik Marjono Jalu Mega S Site Manager NIP. 198004072010121002 NIP. 197701162009121001

You might also like