2015/05/08 Bank Valve (Loader) - Remove (UENR5026-03)

SMCS - 5051, 5124 i06134170 

Removal Procedure
Start By:

a. Release the hydraulic system pressure.

Illustration 1 g03808843

1. Remove bolts (2) and plate (3). Remove floor mat (1).

Illustration 2 g03821014

2. Remove bolts (4) and plate assembly (5).

Illustration 3 g01521965
Viewed from the bottom of the machine.

Illustration 4 g01521974
Viewed from the inside of the cab.
https://sis2.cat.com/#/print-preview/service/%257B%2522title%2522%253A%2522Bank%2520Valve%2520(Loader)%2520-%2520Remove%2520(UENR5026-03)%2522%252C%2522formattedPublicationDate%252… 1/2
22/7/22, 08:50 SIS 2.0

3. Disconnect tube assemblies (6) and (8).

4. Disconnect hose assembly (10).

5. Disconnect tube assemblies (11) and (14).

6. Disconnect harness assembly (9).

7. Remove fittings (7), (12), and (13).

Illustration 5 g01521982

8. Disconnect hose assemblies (15) and (16).

Illustration 6 g03820789

9. Use two people to remove bank valve (17). The weight of bank valve (17) is approximately 25 kg (55 lb). Remove bolts (18) and remove bank
valve (17).

HWA1-UP, HWB1-UP, HWC1-UP, HWD1-UP, HWE1-UP, HWG1-UP, LBF1-UP, LBS1-UP, LYA1-UP, LYB1-UP, LYC1-UP, LYD1-UP, LYE1-UP,
NSB1-UP

PPI-0006B391
2022/07/22
13:50:22-05:00
i06134170
© 2022 Caterpillar Inc.