You are on page 1of 12

6/9/2021 Software Engineering (210253)

which model represents state transition for software engineering activities?

Incremental model

Concurrent model

The Spiral Model

Prototyping model

Which one of the following is a Prototyping Model phase?

Construction of prototype

Deployment Delivery & Feedback

All of these

Modeling Quick design

Clear selection

which of the following questions are addressed in order to validate requirement

Is each requirement bounded and unambiguous

All of these

Is each requirement consistent with the overall objectives for the system

Is each requirement testable, once implemented

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 2/13
6/9/2021 Software Engineering (210253)

The pattern which is associated with software engineering work task or actions
is called

None of these

Phase pattern

Task pattern

Stage pattern

Clear selection

"Consider a system where, a heat sensor notify an intrusion and notify warnings
to security company.” What type of a requirement the system is offering ?

Known Requirement

Non- Functional Requirement

None of these

Functional Requirement

Clear selection

Which of the following requirements can be described as performance attribute,


a security attribute or a general constraint on a system

Non- Functional Requirement

Functional Requirement

None of these

Static
https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 3/13
6/9/2021 Software Engineering (210253)

Clear selection

The techniques which converts the needs of the customer into technical
requirements for software is called _______

Collaborative Requirements Gathering

Quality Function Deployment

Usage Scenarios

Elicitation Work Products

Clear selection

Which of the following diagram is time oriented?

None of these

Activity

Sequence

Class

Clear selection

The pattern which is associated with framework activities for the process is
called

None of these

Task pattern

Stage pattern

Phase pattern

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 4/13
6/9/2021 Software Engineering (210253)

Which of these abstractions class consist?

Operations

Attributes

All of these

Set of the objects

Clear selection

What are the different elements of analysis model?

Behavioural elements

Class-based elements

Scenario-based elements.

All of these

Clear selection

Which of the succeeding is not a life cycle model?

Spiral model

Waterfall model

Prototyping model

Capability maturity model

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 5/13
6/9/2021 Software Engineering (210253)

Which requirement monitoring task assesses evolving software with respect to


user goals

run-time validation

Distributed debugging

run time verification

evolution and codesign

How many phases are there in Scrum ?

None of these

Clear selection

Which one of the following models is not suitable for accommodating any
change?

Prototyping Model

Build & Fix Model

RAD Model

Waterfall Model

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 6/13
6/9/2021 Software Engineering (210253)

Which of the following is not an UML diagram?

Class diagram

Use case Diagram

Sequence Diagram

Interface diagram

Clear selection

Which of the following is representing step for negotiating requirements

Negotiation of the stakeholders’ win conditions

All of these

stakeholders’ “win conditions" determination

system’s key stakeholders Identification

Clear selection

Use case diagram, activity diagram, sequence diagram belongs to _____________


category.

Behavioral

Non-structural

Structural

Non-behavioral

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 7/13
6/9/2021 Software Engineering (210253)

A process model that is designed construct a software in increments is called

incremental Model

RAD Model

Prototype Model

Spiral Model

Clear selection

Robotics, expert system and pattern recognition are the applications of ______

Artificial intelligence

Game programming

Web programming

System software

Clear selection

Which of the following are issues of requirement analysis

Data & class

Functional & Non-functional

Performance & Design

Stakeholder & developer

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 8/13
6/9/2021 Software Engineering (210253)

How is plan driven development vary from agile development?

Specification, design, implementation and testing are interleaved

Iteration occurs within activities/operations

Outputs are determined by negotiation during the software development process

only implementation and testing are interleaved

Clear selection

Component diagram, Class diagram, deployment diagram and object diagram


belongs to _____________ category.

Structural

Non-structural

Behavioral

Non-behavioral

Clear selection

Identification of stakeholder is related to which of the software practice?

Examine the result

Carry out the plan.

Plan the solution.

Understand the problem.

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 9/13
6/9/2021 Software Engineering (210253)

____process framework activity is responsible for feedback.

Modeling

Construction

Communication

Deployment

Clear selection

Which one of the subsequent is not a stage of requirement engineering ?

Requirement documentation

Requirement design

Requirement elicitation

Requirement analysis

Clear selection

_________ interact and work directly with the software to achieve system
function

Stakeholder

Secondary actors

None of these

Primary actors

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 10/13
6/9/2021 Software Engineering (210253)

SDLC means for

System Development Life Cycle

Software Development Life Cycle

Software Document Listing Collection

Software Deployment Life Cycle

Clear selection

which of these are an umbrella activities

Risk management

All of these

Software quality assurance

Software project tracking and control

Clear selection

Requirements elicitation is also called as _____

requirements implementation

requirements testing

requirements gathering

requirements validation

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 11/13
6/9/2021 Software Engineering (210253)

Agile Software Development is consist of

Iterative Development

Linear Development

Incremental as well as Iterative Development

Incremental Development

Clear selection

The___ model is a truthful approach to the development of huge-scale systems


and software.

RAD Model

Prototype Model

Spiral Model

incremental Model

Clear selection

Which Phase of the Unified Process refines and expand use cases?

Production

Construction

Inception

Elaboration

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 12/13
6/9/2021 Software Engineering (210253)

Which of the following represents agile method?

Scrum

Agile Modeling

All of these

DSDM

Clear selection

Page 3 of 3

Back Submit

Never submit passwords through Google Forms.

This form was created inside of Pimpri Chinchwad College of Engineering. Report Abuse

 Forms

https://docs.google.com/forms/d/e/1FAIpQLSc9eIUgi6klI78HnwalDfBpxxln7ckZdeGHr2WmBByF4qQjFg/formResponse 13/13

You might also like