You are on page 1of 5
KENYA PIPELINE COMPANY: LUMITED, [Notes of |L Location of Meeting: Bb | Minutes Written by: |mesting _PS 27 Conference Room ___l-4 j Nancy Mulwa_ ‘Date of Meeting | Filo ile Ref. ~ | De | 29" October 2021 KPCIOPICO oN October 2021 | Purpose pose STAKEHOLDERS CO-ORDINATION MEETING Meeting Ritonded | 7 Elud Chege ~~ KPC Ag, Terminal Manager na bY 2. Patrick Muli -KRA | |3. David Abaka — - URA | (4 Frida Kil - KPC MBD | | 5. Wilchister mond KPC -HSE | |6. Nancy Mulwa - KPC MBD |7. Jane Odegi - Pipecor Representative | |g. OMCs representatives-24 ( attached List) | | 9. Vincent Ayusi - KPC {| on Al = Meeting No. 1 of Q3 FY 20/21 | | Distributi | As above plus Operat ions Manager, Ag. M&BDM Sheet 1 of | Action | Date of by Completi on of Action Description of Discus: [Min 1.0 | Opening Remarks: The Chairman called the meeting to order at 1630 hrs and | | opening prayers offered by Willchister Omondi The Chair regretfully informed members that the meeting had been called on short notice due to KPC System breakdown that had affected loading process for the entire day. The FUEL FACS system was not accessing database (Master | Data) in SAP hence affecting FAN processing and loading process. | Min 2.0 Agenda: 4. KPC system Failure & way forward 2. AOB | Min 2.1 | KPC System Failure & Way forward The Chairman informed members that due to prolonged system failure experienced during the entire day, it was necessary for the stakeholders to agree on the best way forward He also told the meeting that it was not possible to give a definite timeline of when the system will be restored to normalcy, | however he committed that the technical team will work around the clock to restore the system. It was noted that this was end month period where customers and OMCs need to close out their evacuation targets. Therefore, it was prudent that the depot be opened as soon as the system is restored to normalcy. ‘After deliberating on the matter, the following was agreed by the members; | 4. KPC to communicate and give the update of the system Meeting No. | of Q3 FY 20/21 Sheet 2 of 3 Min 3.0 AOB 1. KPC to consider re-instating access cards for OMCs | 2. JET A1 is expected in the depot on Sunday (31.10.21) 3, Due to congestion of access roads to the depot, truck drivers | are required to avail their trucks for Safety checks and park them at their individual yards. | The meeting was adjourned at 1830 hrs. id Kimani —-Date 2/10/2021 | Chairman Signature ®& Nancy Mulwa Oe -Date 28/10/2021 Secretary Signature status to the stakeholders at 10.00 PM, 8.00 AM, 6.00 PM If the system will be restored by Saturday ( 30" October 2021) evening then the depot shall be opened for loading | on 31.10.2021 (Sunday) from 0400 hrs to 2000hrs. A communication to confirm the same will be send to all the | stakeholders on Saturday at 1800 hrs. Kisumu depot has been requested to be opened tomorrow (30.10.2021) to ease Eldoret pressure and OMCs are advised to lift products the depot. Meeting No. | of Q3 FY 20221 Sheet 3 of 3 © Date of meeting... af. 1 ss 2: Date of meeting notification (attach copy) 3. fe Section 1: Personal Details peer — No. Name Org. / Stn. Time 4 NANCY pAdlwa Mpc 2 Avemt whnigens Our 5 Piiised Wepre | noch 4 | Jane bigs Pi gecew 5 pared, KEMgor Ruaiserten| es | pelle Ornette] ICP C Folie sa a | Crs Other! fens ow 9 | Fein Kunut Kee. 40 ¢ ines _| 11 [Dawa Poepsa | tSyaA [ee [-pe— [iors 42 Waieney © Ras | Onpennsa| bo i 16.38 st 43 [Learns Gre] Cod rel THe (6-B< id >. 14 CAitus SHeplel Be ‘ (6230 1s PAIS Mats | era. loPfrccr | theo | 16_| uns (Asi ae Lice Dn Hi | 1 O4l 47 rh Neola ut Oe g- io) fe PEt Maka | Kec | Apresol ost Section 2: Meeting Information = & Duration of meeting (in minutes). i ie - . 7 —___— | Name/Signature/Date Ni Welw s A@x- [agh>}r Form Ref: KPC.QMR-3 Issue/Rev: 1/1 Effective Date: 02.06.2016 Page lof 1 Me Vealdhow 1. Date of meeting..... 2. Date of meeting notificat 3. Venue of meeting....5..: 4, Purpose/Type of meeting.) Section 1: Personal Details Com pany 4 eck in| 0 yang 4 D mM la ‘[Seceens Wuass Set | D 3. [ere yeaa) Fecal 4 (Apes f Pasty Ar TAL 6 evans Ap ONGE | Lavco) 6 = ey MET Gs aa VINA no nol a (isher ABA) Tapa) 9 | KAteT ptictae (Te. sTee 40_| EVANS (e410 ASINETT 11 fehemed Abdikead ie] ZA Cs /A 12 |S Move! Soe 13 | Aedfales jnohanm Mitput 14 | Fely Mo Venta PT Rtn 15 16 AT 18 Section 2: Meeting Information Duration of meeting (in minutes) _Name/Signature/Date Form Ref: KPC.QMR-3 Issue/Rev: 1/1 cc Wawa _ Effective Date: 02.06.2016 Page 1 of 1

You might also like