NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED
(Ministry of Road Transport & Highways)
2022_NHIDC_698931_1
31.08.2022
Sub : Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km
26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman
Chowk) including bridge on Chenab river of Jammu - Akhnoor Section of NH 144A in the Union Territory
of Jammu & Kashmir on EPC basis (Pk;
Replies to pre Bid queries
SN.
Pre Bid Query
Reply
Major Bridges/ROB/Flyovers projects
lat) in case the cost of specialized project is less than or equal to Rs. 1,000 Cr: The sole
[Bidder shall have completed at least one similar Major Bridge/ ROB! Flyover project in the
last 10 (Ten) financial years preceding the Bid Due Date, having span equal to or greater
khan 50% of the longest span or 100 m, whichever is lass ofthe structure proposed in this
lpoject and also the oost of such similar project shall be atleast 20% of the Estimated
Project Cost. For this purpose, a project shall be considered to be completed, if more than
0% of the value of work has been completed and such completed value of work is equal
lo or more than 20% ofthe Estimated Project Cost.
(22) In case the cost of specialized project is more than Rs. 4,000 Cr: The Bidder shall
lhave completed at least one similar Major Bridge! ROB/ Flyover project in the last 10 (Ten)
nancial years preceding the Bid Due Date, having span equal to or greater than 50% of
he longest span ofthe sttucture proposed inthis project or 100m, whichever is less, and
llso the cost of such similar project shal be atleast 20% of the Estimated Project Cost or &
'1000Cr. whichever is less. For this purpose, a project shall be considered to be completed
lf more than 90% ofthe value of work has been completed and such completed value of
}work is equal to or more than 20% of the Estimated Project Cost or & 1000 Cr, whichever
js less.
‘Amend the clause as per this :=
|) The sole Bidder or in case the bidder being a joint venture, any member of joint venture
shal necessary demonstrate aduitional experience in construction of specialized projects
lof major bridges’ tunnels/RoBs/Flyovers in the lest 5(Five) financial years preceding the
[it due date ("Mandatory Experience")
IThe Bidder should have executed the construction of atleast one span of minimum 80m
length with steel / composite superstructure/RCC in a major Bridges/ROBSIRUB/Flyover
fer as isolated project or a part of project. The bidder should furnish te above required
Project specific information and evidence in support of its claim, as per format at Annex &
lAnnex-IV of AppendiiA. In case , similar work is part of @ project, the bidder should
submit the cost of the similar work substantially completed duly certified by project
thority
As por RFP.