You are on page 1of 1
NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED (Ministry of Road Transport & Highways) 2022_NHIDC_698931_1 31.08.2022 Sub : Upgradation of Existing 2-lane Highway to 4 lane with Paved Shoulder configuration from Km 26.350 (Design Chainage 26+615) (Khati Chowk) to Km 30.097 (Design Chainage 30+359) (Hanuman Chowk) including bridge on Chenab river of Jammu - Akhnoor Section of NH 144A in the Union Territory of Jammu & Kashmir on EPC basis (Pk; Replies to pre Bid queries SN. Pre Bid Query Reply Major Bridges/ROB/Flyovers projects lat) in case the cost of specialized project is less than or equal to Rs. 1,000 Cr: The sole [Bidder shall have completed at least one similar Major Bridge/ ROB! Flyover project in the last 10 (Ten) financial years preceding the Bid Due Date, having span equal to or greater khan 50% of the longest span or 100 m, whichever is lass ofthe structure proposed in this lpoject and also the oost of such similar project shall be atleast 20% of the Estimated Project Cost. For this purpose, a project shall be considered to be completed, if more than 0% of the value of work has been completed and such completed value of work is equal lo or more than 20% ofthe Estimated Project Cost. (22) In case the cost of specialized project is more than Rs. 4,000 Cr: The Bidder shall lhave completed at least one similar Major Bridge! ROB/ Flyover project in the last 10 (Ten) nancial years preceding the Bid Due Date, having span equal to or greater than 50% of he longest span ofthe sttucture proposed inthis project or 100m, whichever is less, and llso the cost of such similar project shal be atleast 20% of the Estimated Project Cost or & '1000Cr. whichever is less. For this purpose, a project shall be considered to be completed lf more than 90% ofthe value of work has been completed and such completed value of }work is equal to or more than 20% of the Estimated Project Cost or & 1000 Cr, whichever js less. ‘Amend the clause as per this := |) The sole Bidder or in case the bidder being a joint venture, any member of joint venture shal necessary demonstrate aduitional experience in construction of specialized projects lof major bridges’ tunnels/RoBs/Flyovers in the lest 5(Five) financial years preceding the [it due date ("Mandatory Experience") IThe Bidder should have executed the construction of atleast one span of minimum 80m length with steel / composite superstructure/RCC in a major Bridges/ROBSIRUB/Flyover fer as isolated project or a part of project. The bidder should furnish te above required Project specific information and evidence in support of its claim, as per format at Annex & lAnnex-IV of AppendiiA. In case , similar work is part of @ project, the bidder should submit the cost of the similar work substantially completed duly certified by project thority As por RFP. f an @.shivprdsaay General Manpger(T) Replies of pre bid queries Page 1

You might also like