You are on page 1of 5
PROVINCIAL ECONOMIC ENTERPRISE MANAGEMENT OFFICE, DAVAO de ORO PROVINCIAL HOSPITAL - LAAK roper Storage and labelling requirements of hos} ANNEX“ i REPEMLICOF THE HIMLAMINES PROVINCE OF DAVAO DE ORO PROVINCIAL ECONOMIC ENTERPRISE MANAGEMENT OFFICE DAVAO DE ORO PROVINCIAL HOSPITAL - LAAK MINUTES OF THE MEETING ON WASTE MANAGEMENT PROGRAM Date: March 15, 2022 Venue: ADMIN Lobby, DdOPH - Laak AGENDA DISCUSSION ‘AGREEMENTS RESPONSIBLE TIMELINE | REMARKS PERSON 4.Wastewat | Last box of the Wastewater | @ — The hospital plan to request for | Pollution Control Officer | ASAP _| Still for er Treatment Treatment Facility was assistance from the Provincial collaboratio Facility clogged with soil/debris from Engineering Office and one Managing Head nwith the the construction site (3rd backhoe to fix/repair the last Provincial building). . Portion of box which had been Administrative Officer Engineering | clogged from the construction Office and © The hospital shall conduct site Hospital Waste Focal LGU- Laak regular desludging of its penstn MENRO primary wastewater © —_Non- compliance with or gross faa treatment facility (septic tank) to prevent overflow of wastewater, so we need to fix the last box, since the hospital wastewater discharge permit indicates violation of any provision of this act, rules and regulations and/or any pertinent provisions of RA 9275 otherwise known as “Philippine Clean Water Act of 2004", a corresponding penalty in PROVINCIAL ECONOMIC ENTERPRISE MANAGEMENT OFFICE THE PuLaHVaSes DAVAO DE ORO PROVINCIAL HOSPITAL - LAAK that our permit shall contain its wastewater into the water-tight and leak-free Primary Wastewater Treatment Facility (Septic Tank) the amount of 10,000,00 to 200,000,00 per violation shall be imposed. 2. Hallway @ = The Utility worker keeps @ = The Utility as well as the Pollution Control Officer ASAP | Still must be complaining about waste committee on Waste Requesting fixed during being transported to the Management Program suggested | managing Head for a budget transportatio MRF or Material Recovery that the hallway be sealed or hota n of hospital Facility or dumping fixed with cement so that they Administrative Officer province or waste going location/compost pit of can easily transport waste using Froth. to waste selected and separated a wheelbarrow or anything with @ | WHiiy Worker scott disposal waste within the hospital wheel and that the garbage is HSER area (MRF) grounds. properly secured while being faosdiait- Wests ceaeal Material transported, especially at night deals i and on rainy days, when it is pe Daria difficult for them to do the task oe comfortably. twas i sAP__| implemente if il © — The staff especially the Utility | Pollution Control Officer | A licies © = Utility Worker will be ith the d te ‘ incharge of the collection worker must comply wit REPUMLIC OF TINE MHELIPENES. PROVINCE OF DAVAO DE OKO. PROVINCIAL ECONOMIC ENTERPRISE MANAGEMENT OFFICE, DAVAO DE ORO PROVINCIAL HOSPITAL - LAAK Procedures and proper disposal of ‘existing healthcare waste Managing Head management based on manual infectious waste. Regarding Administrative Officer on Waste Managemen | waste collection, the hospital of the DOH {Program must provide non-touched | A. All health care waste produced on COVID - disposable bins, preferably | during the care of COVID - 18 Utilty Worker 19 Infection fined with a garbage bag in a | patients should be collected safely in at the patient room, to prevent | designated containers and bags, Isolation transmission of treated, and then safely disposed of Coe Waste: Focal or treated, or both, preferably on-site. Ward infection/cross infection. B. All who handle health care waste should wear appropriate PPE and perform hand hygiene after removing it. C. Use double lined garbag! the collection of health care Noted Prepared by: MARBY A. DOLOYAN, RN. MAN. JOSE RTIN D. BRIONES, MD. FPSMS. Chief Nurse/ Pollutio! jontrol Officer Chief of Hospital/Managing Head PROVINCIAL ECONOMIC ENT! MA DAVAO de ORO. PROVINCIAL HOS: ATTENDANCE SHEET WASTE MANAGEMENT PROGRAM TS ORGEMENT PROGRAM Date: March 15, 2022 Venue: ADMIN Lobby, DdOPH - Laak NAGEMENT. OFFICE PITAL~LAAK NAME DESIGNATION/POSITION | SIGNATURE WARE A DOLOAN, RN MAN, (ont port [ bescav a ft Orono. (list fos fede iva ‘cx, fade EL MTOR YY Marae S ponte “hy - Teds be ea [Py Rn aye viele | Fray way INN sie far Mon orn Fernander Messing tr di, POW S. eacour MUU oS Luviuyo, ToeN Duver AT! Csi. aver (\ i wt A One MLodeoprn VI ford _Agptton beans Prowse | ge jo mnen PEE 0 Fara = AD : nn y Mi) fnakyn fle Peolean Gea wars me C | Pema 2 | OS Parole 4, Poblacion, Lask Davae de Oro

You might also like