This document provides details of the canopy roof framing plan including:
1. The framing consists of three types of beams - WF150, WT150, and H60 with varying lengths and quantities of each.
2. The total weight of the framing is calculated to be 1034.79656 kg and the horizontal force (15% of total weight) is 155.219484 kg/m.
3. The area covered by the canopy roof is 53.322 square meters. The document provides the weight per meter of each beam type used in the framing.
This document provides details of the canopy roof framing plan including:
1. The framing consists of three types of beams - WF150, WT150, and H60 with varying lengths and quantities of each.
2. The total weight of the framing is calculated to be 1034.79656 kg and the horizontal force (15% of total weight) is 155.219484 kg/m.
3. The area covered by the canopy roof is 53.322 square meters. The document provides the weight per meter of each beam type used in the framing.
This document provides details of the canopy roof framing plan including:
1. The framing consists of three types of beams - WF150, WT150, and H60 with varying lengths and quantities of each.
2. The total weight of the framing is calculated to be 1034.79656 kg and the horizontal force (15% of total weight) is 155.219484 kg/m.
3. The area covered by the canopy roof is 53.322 square meters. The document provides the weight per meter of each beam type used in the framing.