WEEKLY ENVIRONMENTAL

MONITORING REPORT N° Week 15 - 2014

REPORTING PERIOD: 04/04/2014 -10/04/2014 Date of Report: 11/04/2014 Author :OLORUNYOMI WALE
A – NUMERICS

Environmental

GROUND WATER SURFACE WATER


WITHDRAWAL / USE WITHDRAWAL / USE

AMOUNT OF AMOUNT OF
Abandoned
LAND LAND Active ground Active
ground water COMMENTS / OTHER DATA
SITE CLEARED RECLAIMED water wells (*) Estimated withdrawal Estimated
wells (*)
(give N°s, volume of points (*) volume of
(give N°s,
(hectares) (hectares) GPS water (give N°s, GPS water
GPS
coordinates withdrawal coordinates withdrawal
coordinates
and nearest from well and nearest from point.
and nearest
community) community)
community)
0 0 SICIM Campsite 295 m3 0 River Mbitel 160m3

335290 N 339814 E
598326 E 604417 N
and Ouami is
Ouami is the closest
closest community
community to
the water well
and it is more
than 20 km
away

WEEKLY 0 0 1 295 m3 0 1 160 m3


TOTAL

(*) List date withdrawal commenced and ended in the “comments” column. For surface water use also list the type of water body being used (e.g., river, stream, lake, etc.).
Spills

Spill Report No. Location of Spill Initial Spill Close-out Spill Type of Spill (i.e., Material Volume of Volume of Current Status
(GPS coordinates Report Date Report Date into flowing water, Spilled Material Spilled Material
and/or kilometer post (DD/MM/YY) (DD/MM/YY) into open water, (L) Recovered (L)
mark or other location into a
descriptor AND marsh/swamp,
nearest community) onto land)

SICIM S-####
SICIM S-####

Non-Compliance Situations Occurred in the Week and Those from Past Weeks that are Still Active

Non- Level Location of Non- Brief Description of Non- Initial Close-out Corrective Measures Undertaken Current
Compliance (I, II, or III) Compliance Situation Compliance Situation Report Report Date Status
(GPS coordinates Date (DD/MM/YY)
Situation
and/or kilometer post (DD/MM/
Report No. mark or other location YY)
descriptor AND
nearest community)
SICIM NCS

EMP Compliance Initiatives Identified in the Week and Those from Past Weeks that are Still Active

EMP Compliance Location Where Brief Description Initial Close-out Actions Undertaken Current
Initiative Initiative Identified of Initiative Report Date Report Status
Report No. (GPS coordinates and/or (DD/MM/YY) Date
kilometer post mark or other
(DD/MM/Y
location descriptor AND
nearest community) Y)
B- SUMMARY OF THE WEEK’S ENVIRONMENTAL MONITORING ACTIVITIES
Phot ANY FOLLOW-UP
APPLICABLE ITEMS OF
SITE o/ ACTION/NON-
THE MONITORING CHECK- OBSERVATIONS
Map COMPLIANCE/DEFICI
LIST AND STATUS*
N°** ENCY?
Road Environmental Three environmental baseline reports for laterite borrow pits were
Baseline (Land approved for four borrow pits (3 on RLP1 and 1 on LPG1 roads).
request).

Campsite /
Waste  Waste collection and segregation continues within the campsite
ROW
management and the Right of Way.

 Water was withdrawn from River Mbitel for dust control within the
Campsite /
Dust control / campsite and some worksites.
ROW
Water
withdrawal