You are on page 1of 1

Inputs Grade Control Model Outputs

• DDH • Estimation method (ID4) • Ore tonnage


Errors Errors Error(s)
1.
Errors
1. 1. 1 Assay completion 2. 1.
3.
2. 2. 2.
3. 3. 3.
• Assays (DDH) • NSR calculation • Grades
Errors Errors Errors
1. 1. Error(s) 1.
1.
2. 2. 2 Face mapping 2. 2.
3.
3. 3. 3.
• SG (Cal. From the assays) • COV • Spatial accuracy of GCM
Errors Errors (O/W boundary)
1. 1. Errors
Error(s)
2. 2. Update 1. 1.
3
3. 3. Wireframes 2. 2.
3.
• Face mapping • Mined out volumes (Survey) 3.
Errors Errors • Block model (GCM)
1. 1. Errors
2. 2. Error(s)
1.
Upload to 1. 2.
3. 3. 4
“LF Central” 2.
3.
• •
3.
Geologists SG of Back Fill (measured)
Errors Errors
• Quarterly reconciliation
1. 1. Long Term – Grade control (RF1)
2. 2. Mill Feed – Grade Control (RF2)
Error(s)
3. 3. Import updated 1. Mill Feed – Grade Control (RF3)
5
Wireframe 2.
• DH Surveys 3. • Errors
Errors 1.
1. 2.
2. 3.
3. Error(s) Error(s) • Validation report (ID4 vs NN)
Grade Control 1. 6 Update BM 1.
• DH Collar surveys 11
BM 2. 2.
3.
Errors
Errors
3. 1.
1. 2.
2. 3.
3. • PPT of updated areas
Error(s)
Error(s) Validation and
• Sludge samples 12
Interogate 1. 7 1. Errors
As built w/f 2. BM report 2.
1.
Errors 3. 3.

1. 2.
2. 3.
3.
• DH Sampling interval Grades and
Error(s) Error(s)
13 1. Update resource 1.
Errors Tonnage 2. 8
3. report 2.
1. 3.

2.
3.
• Drilling pattern
Error(s)
Errors Depleted mined 1.
9
1. out areas 2.
3.
2.
3.
• Software
Errors Error(s)
1. Create PPT 1.
10
2. Of updated areas 2.
3.
3.

You might also like