You are on page 1of 7
SONY PICTURES ENTERTAINMENT INC. EXHIBIT A WORK ORDER WORK ORDER, Exhibit A to the Agreement dated October 1, 2013, by and between Sony Pictures Entertainment inc. (the "Company" or “SPE") and DSB Enterprises LLC, dba DSB Consuting (Contractor or DSB"). 1. SERVICES: See attached Statement of Work dated October 1, 2013. 2. TERM: From October 1,2019 unti March 31, 2014, or unti art termination pursuant to Section 4 of the Agreement, whichever i fst 3. COMPENSATION: 8. Contractor willbe compensated ata fixed foe of $125,000 for the DSB Infrastructure Build Project Expenses: NA Overtime compensation: N/A ther compensation: NIA Estimated costs: $125,000 fixed foe 4. CHANGE REQUESTS During the course ofthe Services, ia change in project scope is identifed by ether party. Contractor wil issue a Change Request form to Company that deals the change in project ‘scope and its impact on both the project schedule and cost (‘Change Request), Contractor shall not commence work in connection with any change order untlthe fee andlor schedule impact ofthe change order is agreed upon by beth ports in writing. If Change Request is ‘approved, the cost associated with it wll be added tothe total service fees available to Contractor as outined in the appicable statement of work. The time required to implement ‘approved Change Requests wil also be reflecied inthe integrated project plan. ‘creo ano accerten tnis_//"# day of DEC 2014: ‘SONY PICTURES ENTERTAINMENT IN. SNe v=_ Sepa afl Statement of Work - AWS Infrastructure Build Out at: October 1, 2013 ‘This Statement of Work (‘SOWP) documents certain toms ofthe understanding between OSB Enterprises LUG, dba OSB Consisting (the “Contractor and Sony Petures Entertainment Ine. (Be “Company or SPE") wih respect o The MediaCentre Project (Preec. The Contractor wil provide certain services {oe Company as described inthis Satement of Workin connection wth the Project (Services). These ‘Series hal be provided under he provisions of his Statement of Work and the Matter Services| ‘Agreement between Conracor and Company dated 00/15/2013, inclucing any appendices, schedules ‘andlor attachments which, logoter, descbe cur understanding wth respect othe Serveas (Agreement) Project Background and Objectives ‘The objective othe pejctiso bul out an inrastuctre nthe cloud (Amazon Web Services) {e-onable SPTN to insoutes content preparation and realize many operations benefits (2. ‘ower costs higher productivity, beter aualiy, nereased troughput uniform management and ‘improved reporting & tacking). Ths infastrucure wil provide a highly stable and avalale ‘roducton envionment to supper he Media Cenze pation that wil be responsible for ‘manscin a free amount of content across the European ragln Thi enn mina om many ‘stbutowe and is subsoquentyrantormed tough a eerie of workowe (eg, Ingest, QC, Compliance, Prome) to meet our playback deivery requirements. This infastructure thats being bultwl ly ake rl in ranctoming SPTN operational capabites and providing move "exit to meet changing market condtons Project Scope ‘The scope of the projet described in this SOW bs: ‘+ Valdete al platiom components wih died coniguation as stated in tachment ‘+ Responsible fr bulng cu the AWS infastrutire fo eupport the Media Centre program, Build ‘outta include both a non production environment as wel 8 a prodicton environment. See ‘tachment (AWS ~ SPE MC Production Tech Arch AMoore version = Visio = 05 vs) fo etaled architecture pans Out of Scope The following items are specifically out of scape fr this SOW: ‘Amazon Web Services Direct Connect ‘© Deployment and inplementation of this MadlaCentre component willbe provisioned within a standalone AWS account thats separate and stint from the primary MediaCentre platform AWS aecount. 12 Management and provisioning of al Dect Connect ports and supporting networking infastructure willbe fully managed by SPE IT ‘The Consultant Approach and Deliverables Objectives “The primary objectives ofthe projctdesebed in his SOW are: ‘+ Vaidate at platorm components with desired configurations Build Non-Production Enveonments) Buia Production Envianmant ties ‘+ Engage wih SPE IT ond the Media Cente Architecture Councl (Le, IT ES, Networks, DMG, Enletainment Networks (UK), Infomation Secuty) to estabish echnical solutons and ‘speaticatons fr the flowing ‘Dedicated and secure connectivity from the AWS data center n Docklands, land othe ‘Golden Square, London locaton Ingress and egress security policies governing acces totem the AWS environment and the lobal SPE network [DNS zone fe management, detogaton, hosting ete Source code repostory hosing Opscode Chet account provisoning Network scenning ‘© Validet the following key configurations tobe utized inthe MediaCentre platform architecture © Aapera High Availity Custering for AWS © Cory Cloud Ciustoring © Vadispine High Avaisbity confguration for Glasssh © Visine Transcoder deployment and contgurston ‘+ Build non production environments per the architectural designs provided herein as Attachment t ‘Bult production environment pe the architecture designs provided herein as tachment 1 Deliverables Dativerabie# Deliverable Description 1 ‘Validate al key conigurations in Attachment t 2 Buliest non-production enviromenifs) a BuleTestproducton environment Contractor Services and Responsibilities Ryesponsible (Ajecountabe (CJonsuted (Voted Contactor Company Validate al Key configurations | R A ‘BulerTestnon-producton | R ce lest production R € Project Team Contractor shal provide the folowing team resources that re detaed on he resource loading schedule included n tachment 2 (PltfomOps-Suppor:-Resourceloading xlsx) fo the duration ofthis SOW. Project Timeline Contactor shall deliver the defined milestones onthe following tmatins toane once, 2019 Pewee Wisco Reber 2048 verbo? ion ann 1820%4 evenben Project Assumptions ‘The Sensces,Daiversbes, tes and detvery schedule fortis engagement are based upon the flowing assumptions, representations or information supplied by the Company (Assumptions) ‘Assumption # [Assumption Deai/Descrinton 7 ‘Companys intl IT group wil provide arect and unetred access to the entre AW inrastucue via he global VPN serie. With his assumption, Contraco Shall not setupimaintain any stenate remote neta sean othe AWS inastuctre 2 ‘Company wil provide Contactor with the rsured usar icanses and network 220888 utes Enterprise Chef Server (Opscode) aesount for the Purposes of ‘managing allinrastueture automation forthe MedaCenive projet. ‘Acceptance Criteria ‘Company must confi in wing that each delversbe or service complies with the requirements ofthat detverable or sevies. Specie deiverable oF service roquicoments that are 2 conden of writen acceptance by Company must be provided foreach deliverable or sence tothe Contactor at the beginning ofthe engagement. All dalverable and service requirements wil be derived frm the scope ‘defined in Attachment 1 Bath Company and Contractor and agree and scknowiedge that i any testing citeria for 9 specie Deliverable has not been agreed in wring, the Boh pais hall mualy agree upon and etn wring ‘he tosing eters for such Delverable, ‘Acceptance shall be deemed rendered by Company i Company fas signed-o on the applicable Colverabl or serie, ‘Company shall provide accoptance ox any objections in writing orby eal o the Contato, Kenting the deliverable or sence n question and the reason fr objection fva (6) business days of delivery, Acceptance Criteria AWS Infrastructure Build Out (Attachement 3) ‘Acceptance cri contained witin Atachent 3 ted “DSE-SPE MediaCentre Platform Arcecture ‘Acceptance Criteria v8 8x incorporates the folowing Key milestones in which the system wil Be ‘considered accepted when each of he citer lad out within the aforementoned document are met or passed sccesstaly Iilestone #1 ~ Engagement and Solution Design & Validate all key configurations Milestone #2 ~ Build non-production envionment) Milestone #3 ~ Bull production environment Company's designated accoptance agent shall be: ‘Adam Moote, Technical Lead - MediaCentre Project ‘win input and crecion provided by the MedkaGonte Technical Architecture Commitee Service Level Agreements ‘The folowing SLAs shal apply fo the the Deliverables contemplated inthis SOW: 1+ Frstume correct > Contactor ascot that the Deliverables wil correct and according tothe agreed upon ‘specicaton when they are delvered and signed of on, + Ontinedalvery 1 Contractor asset that the Deliverables wil devered on tme according tothe devery ‘schedule detaled in this SOW, Fees & Expenses ‘The Contractors foes forthe scope of Serviecs doscribad in thie SOW wil be $125,000, Thi oo is ‘based on the Company ftling the Company Responses described in this SOW. The Contactor shal bil SPE in accordance wit the flowing biting schedule, ‘iling Description eee tobe Billed ‘iting Date Milestone #1 Delivery | $25,000 ‘Date of gro or deiverable Miosione #2 Delvery_| $50,000 ate of signa er delverable Muiestone #3 Dalvery | $50,000 ato of eigno er dalverable

You might also like