This Completion of Installation is a written declaration signed by the Supplier and the Customer
which confirms that all equipments of the line that have been delivered are fully installed and ready
for testing in accordance with the technical conditions.
Customer: Address:
This step permits the Supplier team to prepare and start the installation testing of the line.
Installation date:
Product specs:
Bottle Size:
Name:
Function:
Name:
Function:
This document is a non-binding recommendation by the Association of the Beverage Machinery Industry.
For further information, please consult our website www.abm-industry.org.