Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Concerns the application of civil engineering
Geotechnical technology to earthen materials (soil and rock)
(Holtz & Kovacs, 1981)
Engineering
• The mining industry is a complex type of business that requires measurable risk analysis.
• Mining projects will also be affected by various uncertainties (commodity prices; level;
properties of soil, rock and rock mass; and geological structures)
• Consequently, geotechnical science has become a necessity to answer these uncertainties,
especially those related to rock properties.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Development on Geotechnics
Before the 18th century; and development on rock
mechanics
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Introduction
Proven by
Used as
The discovery of the five most important
pyramids in Egypt in less than a century
in the period 2750 BC and the
construction of thousands of pagodas.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Development of Geotechnical Engineering before the 18th century
(Skempton, 1985)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Pre – Classical Classical Soil Mechanism –
(1700-1776) Fase I (1776-1856)
1. Henry Gautier (1660 – 1773) 1. Charles Augustin Coulomb (1736 – 1806)
Studied natural slope problems that led to a soil In 1776, examined friction and cohesion to determine the
mound to form a retaining wall procedure plane of slip behind a retaining wall ("Coulomb Theory"). Then
it developed into the Mohr-Coulomb Theory (combined with
2. Benard Forest de Belidor (1671 – 1761) 2D stress conditions Christian Otto Mohr)
Proposed a theory about lateral soil pressure on the
retaining wall 2. Jean Victor Poncelet (1788 – 1867)
Developed Coulomb's theory in 1840 by using the graph
3. Franscois Gadroy (1705 – 1759) method to determine the amount of lateral soil pressure on
Published the first laboratory model that used sand vertical and horizontal retaining walls with various forms of
collections to produce retaining walls in 1746 soil surface. Also first discovered soil shear angles and
ultimate carrying capacity on shallow foundations.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Classical Soil Mechanism – Fase II Modern Soil Mechanism (1910-1927)
(1856 – 1910)
1. Albert Mauritz Atterberg (1846 – 1916)
1. Henry Philibert Gaspard (1803 – 1856) Published about the consistency of clay particles by defining
In 1856, studied the permeability of sand material, liquid, plastic, and shrinkage limits and plastic indexes
which resulted into permeability coefficient, a very
useful parameter in geotechnical engineering 2. Arthur Langley Bell
nowadays Developed a relationship between lateral pressure and resistance
on clay, shallow bearing capacity in clay soils, and shearbox to
2. Sir George Howard Darwin (1845 – 1912) measure uninterrupted clay shear strength in wet conditions
Conducted a study to determine the rolling
moment on a high sand retaining wall in the 3. Wolmar Fellenius (1876 – 1957)
consistency of loose and solid sand. Developed a stability analysis on the slopes of water-saturated
clay (where, ϕ = 0) assuming a critical shear field in the form of a
3. Joseph Valentin Boussines (1842 – 1929) circular arc.
developed the theory of stress distribution in
homogeneous, semi-infinite, elastic, and isotropic 4. Karl Terzaghi (1883 – 1963)
media loads In 1925, developed a theory of consolidation for clay which is still
widely used until today, known as “Erdbaumechanik auf
4. Osborne Reynold (1842 – 1912) Bdenphysikalisher Grundlage”.
Demonstrated the dilatancy effect in sand.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Development on Rock Mechanics
• Rock mechanics is both engineering and science whose purpose is to study the behavior of rocks in their place
of origin in order to control the work made on these rocks such as underground digging and others (Talobre,
1957).
• In the past, many people considered stone as a very strong foundation and that it was impossible for
problems to arise.
• Until an area was found where rock was not as strong as it seemed, such as the very deep mine in
Kolar Golds Field, India, and a deep-level gold mine in South Africa (Hoek, 2014).
• Rock mechanics has developed since 4000 BC, where the basic principle began to be applied at the
underground Hematite Mine in Greece.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
1773 1776 1826 1884 - 1908 1920 1921 1931
Rock tests from Shear strength Construction of the Construction of Josef Stini began teaching Engineering Griffith began to put Bucky used the
Bordeaux by criteria test was Liverpool and the Panama Canal Geology. Throughout his life, he published forward a theory centrifugal test to
Coulomb conducted Manchester Subway 333 papers and books and founded the about brittle study the slope
journal Geologie und Bauwesen material collapse instability model
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Y e a r: 4000 BC 3000 BC
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Y e a r: 1773 1776 1826 1884
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Y e a r: 1908 … 1945 … 1973 … 1980
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Development of Research on
Geotechnics in Indonesia
A closer look at Indonesian geotechnics research history
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019 14
Development of Research on Geotechnics in Indonesia
TEKMIRA
Puslitbang
Geoteknologi LIPI
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Development of Research on
Geotechnics in Indonesia • Laboratory of Rock Mechanics
• Laboratory of Blasting Techniques
• Laboratory of Drilling and Excavation
• Laboratory of Mining Equipment
Sub-laboratories
Develop geomechanical
based research by solving
other scientific problems
founded Laboratory of Rock Mechanics vision
Dr. Made Astawa Rai related to increasing slope
of ITB
stability and openings where
it will improve the safety of
Activities
open and underground
mining
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Velocity Test UCS and Triaxial Test
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PELATIHAN GEOTEKNIK
TAMBANG TERBUKA DAN
TAMBANG BAWAH TANAH MENGAPA
29 Juli – 1 Agustus 2019
GEOTEKNIK
Sheraton Hotel, Bandung
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Periode Keemasan Filsafat Dan Ilmu
Di Yunani
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Socrates
menyatakan bahwa
Pengetahuan yang sangat berharga adalah
pengetahuan tentang diri sendiri.
Esensi dari realitas berada di dalam idea.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Plato
menyatakan bahwa
Realitas atau kebenaran
bukan terdapat di idea,
tetapi di adalam empiris.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Aristoteles sebagai bapak ilmu
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Prinsip Dasar Mekanika Batuan
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Hukum Hooke Umum
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
HUBUNGAN ANTARA DEFORMASI DENGAN GAYA --->
BERLAKU HUKUM RHEOLOGY
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
BENTUK MULA-MULA : abcd
a’
b’ a BENTUK KEDUA : a’b’c’d’
b a1
b1
BENTUK AKHIR : a1b1c1d1
DIMANA :
d’
c = c’ = c1
d = d1
c = c’ = c1 d = d1
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
TERJADI SUATU TRANSAKSI :
Karena 2g sangat
bujur sangkar belah ketupat kecil maka :
cb = cb’
DISTORSI
(geseran murni)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
TERJADI SUATU TRANSAKSI :
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Hukum TAYLOR
x
m y
z
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
KITA AKAN MENGEMBANGKAN KOMPONEN (FUNGSI)
INI MENURUT TAYLOR :
m m - m’
m n n - n’
w w - w’
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PENGEMBANGAN DARI TAYLOR MEMBERIKAN :
dm dm dm
m’ = m + x + y + z +
dx dy dz
d2m (x)2 d2m (y)2 d3m (x) 3 d3m (y) 3
+ + 3
+ 3
…
dx2 2! dy2
2! dx 3! dy 3!
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
dm
KARENA ….. dst ADALAH KECIL, MAKA
dx
ORDE KE-2 dst DAPAT DIABAIKAN, MAKA :
dm dm dm
m’ = m + x + y + z
dx dy dz
dn dn dn
n’ = n + x + y + z
dx dy dz
dw dw dw
w’ = w+ x + y + z
dx dy dz
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
INGAT :
dm
mB = mA + x = mA + x
dx
dmi dmi
m’ – m = xg ---> DIMANA = KONSTAN
dxj dxj DI TITIK A
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
SEHINGGA :
dmi
mi = xj z = A . x
dxj
z = (aij) xj
MEMPRESENTASIKAN SUATU
TRANSFORMASI “PONTUEL”
DIMANA :
dmi
---> MERUPAKAN TENSOR DAN DISEBUT JUGA
dxj
GRADIEN DARI VEKTOR PERPINDAHAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Hukum GAUCHY
M
lim = 0
S0
S
F
lim x DISTANCE = 0
S0 S
M = FORCE x DISTANCE
= GAYA x JARAK
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Hukum NEWTON 2
F = ma
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
AJARAN
NEWTON
principia/the
mathematical
principles of
natural
philosophy(1687)
Hukum NEWTON 2
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Leibniz vs. Newton on
Absolute Space
Teori Lain Yang Berhubungan
• LAME
• YOUNG
• GAUSS
• LAME-NAVIER
• HOOKE
• MAXWELL
• KELVIN
• BURGER
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019 43
KRITERIA PECAHNYA BATUAN
• MOHR COULOMB
• GRIFFITH
• JANBU
• MORGENSTEIN - PRICE
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019 44
TAMBANG TERBUKA
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka & Kuari Batu
Marmer
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Tembaga
Ertsberg, Grasberg & Escondinda
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Tembaga
Batu Hijau Newmont Nusa Tenggara
Tambang Terbuka
Emas Kelian
Tambang Terbuka Batubara
Mine Sangatta & Bengalon
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Longsoran Lereng Alam Pada
Beberapa Wilayah di Indonesia
Longsoran lereng Pada Tambang Cilacap (sumber : PVMBG)
Pasir - Jawa Barat (Pikiran Rakyat)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Longsoran Lereng Tambang Terbuka
di Indonesia
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Longsoran Lereng Dapat Terjadi
Dimana saja dan Kapan saja
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang kini...
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
• Diperlukan seminimum mungkin ketidakstabilan lereng, agar
tidak menyebabkan delay pada AKTIVITAS OPERASIONAL,
DAMPAK pada LINGKUNGAN dan KESELAMATAN KERJA serta
EFFISIENSI BIAYA.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Kelongsoran Lereng dapat terjadi
dimana saja
Jenjang
penangkap
(Catch
Benches)
Cleanup of 3790/L
rock trap is
continuing
• Irwandy Arif
Tanjung
2009
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Persentase Kecelakaan Tambang Terbuka disebabkan oleh
Ketidakstabilan kondisi bawah tanah
Sumber: MSHA USA: 1995 – Q2 2001
Persentase Distribusi dari 34 Kecelakaan dari Tahun1995 hingga
Kuartal 2 tahun 2001 pada operasi tambang terbuka
( Dikelompokkan berdasarkan Komoditas)
Sumber: MSHA
Geoteknik...
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
• Diperlukan seminimum mungkin ketidakstabilan lereng, agar
tidak menyebabkan delay pada AKTIVITAS OPERASIONAL,
DAMPAK pada LINGKUNGAN dan KESELAMATAN KERJA serta
EFFISIENSI BIAYA.
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
FALSAFAH RANCANGAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
FALSAFAH RANCANGAN
• LONGSORAN (SLIDING)
• RUNTUHAN (FALLING)
• NENDATAN
• AMBLASAN (SUBSIDENCE)
• RAYAPAN (CREEP)
• ALIRAN (FLOW)
• GERAKAN KOMPLEKS
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PEMICU DAN PEMACU GERAKAN
MASSA TANAH ATAU BATUAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PENYEBAB GERAKAN MASSA TANAH DAN BATUAN
(TERZAGHI, 1950 DAN BRUNSDEN, 1979)
• Penyebab eksternal :
1. Perubahan geometri lereng
2. Pembebasan beban
3. Pembebanan
4. Shock dan vibrasi
5. Penurunan permukaan air
6. Perubahan kelakuan air
• Penyebab internal :
1. Longsoran progresif
2. Pelapukan
3. Erosi seepage
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tipe Longsoran
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Longsoran bidang
GAMBAR SKEMA LONGSORAN DARI SUATU PERLAPISAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Longsoran baji
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Longsoran guling
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Longsoran Busur
GAMBAR SKEMA LONGSORAN DARI PUNCAK
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
GAMBAR LONGSORAN KARENA HILANGNYA PENYANGGAAN YANG MENGAKIBATKAN KERUNTUHAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
GAMBAR MEKANISME DARI REGANGAN LAMBAT
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Batubara:
Litologi
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Batubara :
Speeding coal expose
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Batubara :
Speeding coal expose
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Batubara :
Kemajuan High Wall
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Batubara :
Kemajuan High Wall
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Batubara :
Kemajuan High Wall + Backfill
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Tambang Terbuka Batubara :
Kemajuan High Wall + Backfill
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
TAHAP-TAHAP PERTAMBANGAN DAN
SASARAN GEOTEKNIK
• Metode analitik
• Metode grafik
• Metode statistik
• Metode numerik: metode elemen hingga,
metode elemen batas, metode
kesetimbangan batas, metode elemen
distinct, metode blok kunci
• Metode probabilitas
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PB8S1 – March 2007 Conditions
PB8S1
3985/L
PB7S
3775 &
3760/L
PB8S1 – Unloading to 3850/L
PB8S1
3850/L
PB8S1 – Delayed Unloading
KENAMPAKAN DINDING (LERENG) KUARI A PT KARIMUN GRANITE,
PANDANGAN MENGHADAP KE TIMUR
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
KENAMPAKAN BIDANG KEKAR PADA LERENG BARAT BAGIAN SELATAN, KUARI A
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PETA AREA KUARI A PT.KARIMUN GRANIT, SEPANJANG TAMBANG KUARI
PULAU
Pelatihan Geoteknik Tambang Terbuka KARIMUN
dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PETA LOKASI LERENG DAN ARAH BIDANG KEKAR PADA PETA STRUKTUR KUARI A
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
LOKASI PERPOTONGAN (CROSS SECTION) PADA KUARI A YANG DIGUNAKAN PADA
GAMBAR BERIKUTNYA
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
MODEL LERENG
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
KONDISI PEMODELAN SETELAH DILAKUKAN PERHITUNGAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
VELOCITY VECTOR MODEL KG 2 (BENCH HEIGHT=15 M, BENCH WIDTH=7.5 M)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
RANCANGAN LERENG TAMBANG
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
RANCANGAN TAMBANG
Nilai dibawah ini dapat digunakan secara umum sebelum memiliki data masukan yang lebih
banyak dan lebih teliti.
Bila data masukan khususnya karakteristik batuan, maka angka ini dapat menjadi lebih kecil.
• Ketentuan faktor keamanan :
- lereng tunggal : 1,2 –1,3
- Lereng keseluruhan : 1,5
- Analisis balik longsoran besar : 1,1
- Geologi kompleks, tanah/batuan yang lunak,
dan adanya air tanah : 1,3
- Kondisi sederhana : 1,3
- Sipil : 1,5
• Kemungkinan runtuh
- Jenjang lereng : 10–50 %
- keruntuhan untuk semua jenjang : 10–30 %
- lereng keseluruhan :1–3%
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PEMANTAUAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PEMANTAUAN
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
PEMANTAUAN (Lanjutan)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Jaringan Survey
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Jaringan Survey (Lanjutan)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Robotic Station di Tambang Tutupan
• Crack Meters
• Wireline Extensometer
• Inclinometer
• Time Domain Reflectometry (TDR)
• Borehole Extensometer
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Crack Meters (Lanjutan)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Gambar Wireline Extensometer
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Inklinometer (Lanjutan)
Time Domain Reflectometry (TDR) (Lanjutan)
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Bore Extensometer (Lanjutan)
Langkah – langkah Program
Pemantauan
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019
Kriteria Pemantauan
• Nilai Batas:
• Bunyi alarm, keruntuhan
terjadi.
• Berlawanan, alarm yang
salah.
Terima Kasih
Pelatihan Geoteknik Tambang Terbuka dan Tambang Bawah Tanah 29 Juli -1 Agustus 2019 130