Dubai Development Authority Stamp:

ISO A1 - 841 x 594 mm


STONE FINISH ALUMINIUM GRILL NOTES:
1- THIS DRAWING IS THE COPYRIGHT OF ARCHCORP AND MUST
NOT BE RETAINED OR REPRODUCED WITHOUT CONSULTANT'S
PERMISSION.
2- ALL DRAWINGS TO BE READ IN CONJUNCTION WITH THE
SPECIFICATIONS, THE BILL OF QUANTITIES AND OTHER
RELEVANT DRAWINGS.
3- ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS,
UNLESS NOTED OTHERWISE.
4- DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS
SHOULD BE FOLLOWED AND VERIFIED WITH THE DETAILS.
5- ANY DISCREPANCIES FOUND IN DRAWINGS ARE TO BE
REPORTED TO THE ENGINEER.
6- CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS TO THE
CONSULTANT BEFORE COMMENCING ANY WORK ON SITE.

ENTANCE GATE

400 2000 400 2000 400 2100 400 2000 400 2000 400

1 BOUNDARY WALL PLAN


A-115 SCALE 1 : 20

LIGHT LIGHT

STONE CILL
2000 400 2000 400 2100 400 2000 400 2000 400
LEGEND OF FINISHES
PPC ALUMINIUM FINISH GRILLES
01 30 MM THICK NATURAL WHITE STONE CLADDING WITH
WITH SECRET FIXING SMOOTH FINISH.

1500
1450

725
0 07/07/2022 MARS Issued for Construction
No. Date Issued by Revisions

PURPOSE OF ISSUE

ISSUED FOR CONSTRUCTION


01

ENTRANCE GATE STONE FINISH STONE CILL


DESIGN CONSULTANTS:

archcorp
2 BOUNDARY WALL ELEVATION architectural engineering
dubai : p.o. box : 95285. dubai, uae. t : +971 4 2955877 f : +971 4 2955811
sharjah : p.o. box : 65100. sharjah, uae. t : +971 6 5289142, f : +971 6 5289156
A-113 SCALE 1 : 20 abu dhabi : p.o. box : 114840. abu dhabi, uae. t : +971 2 6775254, f : +971 2 6775276
LIGHT e : Info@archcorp.biz www.archcorp.biz

OWNER:

ISLAMIC AFFAIRS & CHARITABLE


STONE CILL ACTIVITIES DEPARTMENT
ALUMINIUM GRILL CLIENT:

ENGINEERING OFFICE
1500

PROJECT TITLE:
STONE CILL
R-000121000 - DESIGN AND CONSTRUCTION OF
HH SHEIKH RASHID BIN MOHAMMED MOSQUE
IN DUBAI HARBOUR AT PLOT 3920665
DRAWING TITLE:

250 BOUNDARY WALL TYPICAL PANEL DETAIL

Area Location Parcel ID.


DUBAI DUBAI HARBOUR 3920665
Designed Drawn Checked Approved

SH MARS SH SH
Project No. Date Scale @ A1 Status
ISSUED FOR
2739 09/02/2022 1 : 20
3 BOUNDARY WALL SECTION CONSTRUCTION
Drawing No. Rev
A-115 SCALE 1 : 20
2739 - A-113 0