1. Differentiate between a system, a process and a plant, giving an example in each
category. 2. Cite five examples for each of the types of control systems: a. Manual control systems; b. Semi-automatic control systems; c. Automatic control systems; 3. Differentiate between control and regulation by citing two examples. 4. What are the requirements of a controller in an “application” for each design and development? 5. List two examples for each of the following: a. Open-loop control system; b. Closed-loop control system; c. Time-variant control system d. Time-invariant control system e. Linear control system f. Non-linear control system g. Lumped control system h. Distributed control system i. Adaptive control system 6. Write a technical note on the qualitative and quantitative aspects of control