Note:

Over flow Pipe 1- All dimensions are in cm unless otherwise stated.


2- During RCC work vibrator must be used to avoid water leakage from reservoir.
IMC 3- All PCC works should be with M(1:2:4) unless otherwise stated.
Box section 4- All RCC works should be with M(1:1.5:3) .
(50x30mm) 5- Delivery and Sanction pipes should be Isolated with glass wool.
Thick 2mm 6- Curing must be continued up to 28 days.
Hand rail
7- Clear and Clean water must be used every where.
8- The inlet, outlet, overflow and washing pipes should be adjusted according to site condition.
Delivery Pipe 9- Bearing Capacity Assumed 1.5kg/cm²

Suction Pipe

Ø1.5" GI Pipe 2mm Thick


40cm Spacing

Ø2" GI Pipe 2mm Thick

Elevation of Elevated Water Tank

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Elevated 35 M3 Tank
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-shown Sheet Title Front View
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # 01
PCC M(1:2:4) 5cm
Isogam for isolation 1 layer
Iron Gate (60x60)cm RCC Slab M(1:1.5:3) 12cm Thick
10x10cm GI Sheet 20 560 (sheet 3mmthick)
560 Gauge Gutter with Plaster (1:3) with Padlow Powder
with lockable system
Down pipe Ø2"GI
10 Vent Pipe

20
60 40 360 40 60

15
1% Slope

35

35
Detail-2
A A A Ø3"GI Over flow Pipe

30
30

Manhole
60x60cm Plaster (1:3) with Padlow Powder Dowel Bar Suction Pipe Ø3"GI
RCC Wall (1:1.5:3) 22cm Thick Ø12@15cm,L=110cm

280

265
pe Plaster (1:3) & Painting
Slo

235
1%

22 22 22 386 22

560
35m³ RCC Reservoir
490

560

20 L=340cm
65

25
pe
Slo
1%

50

D
Ø3"GI
Detail-1 Washing Pipe
60

65

300
40 40

Ladder Safety GI Pipe Ladder

20 L=430cm
Cover
TANK FLOOR PLAN

C
Clamp Support
TANK ROOF PLAN 1 SCALE 1:100
1

40
SCALE 1:100
Delivery Pipe Ø3"GI

C
600

B B

1000
100 400 100
60
Ladder Cove Made form steel

300
plate W=3cm Thick=2mm
360
Ø1.5" GI Pipe 2mm Thick
80

20 L=415cm
40cm Spacing
70

80

C
Ø2 GI Pipe 2mm Thick Clamp Support
40

40

C
Top & Bottom
Detail -1
1
SCALE: NTA Ø16@20 cm PCC M(1:2:4) 10cm Thick
Gravel 15cm Thick
Compacted Satisfactory Material

270
600

RCC M(1:1.5:3) 70cm Thick


40
PCC (M150) 7cm Thick
Ladder Cove Made form steel E E

22 L=380cm
Gravel 15cm Thick
plate W=3cm Thick=2mm Well Compacted Base 40 100

Ø1.5" GI Pipe 2mm Thick Ø16@20 cm NGL-2%


40
1%Slope NGL-2%
30cm Spacing Top & Bottom

100

100
Ø2 GI Pipe 2mm Thick
30

80
80

70
10

Detail -2
1 SCALE: NTA SECTION A-A
FOOTING REINFORCEMENT PLAN 3 600

2 SCALE 1:100 Ø16@20 cm


SCALE 1:100 Ø10 Bar Spacer
Top & Bottom

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Elevated 35 M3 Tank
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Sections
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ------
Note:
7 1- All dimensions are in cm unless otherwise stated.

35
Ø12@20 c/c 2- During RCC work vibrator must be used to avoid water leakage from reservoir.
30
95 3- All PCC works should be with M(1:2:4) unless otherwise stated.
22
4- All RCC works should be with M(1:1.5:3).
95
Ø12@15 c/c
15
7 5- Delivery and Sanction pipes should be Isolated with glass wool.
Ø12@10 c/c 15 6- Curing must be continued up to 28 days.
Ø12@15c/c CORNER STEEL BAR Ø12@10 c/c
7- Clear and Clean water must be used every where.
X X L=234 cm 8- The inlet, outlet, overflow and washing pipes should be adjusted according to site condition.
Ø12@15c/c 9- Bearing Capacity Assumed 1.5kg/cm²
380

Ø12@20 c/c

Ø12@10 c/c
Ø12@15 c/c
22
30

Ø12@20 c/c
35

35 30 22 386 22 30 35 Ø8@15c/c
Ø8@15c/c
Ø8@10
20 c/c
PLAN REINFORCEMENT
1
SCALE 1:100

10
Ø10@15 c/c
8Ø20
20

8Ø20 8Ø22
15

6Ø20
20

Gutter with Down


pipe
Ø12@20c/c
22
Ø8@10
20 c/c
Ø12@15c/c Ø12@15c/c

25
22
40 Ø12@20c/c

40

40

40
30

25
Ø10@20 c/c
100

Ø12@15 c/c WATER STOPPER


35 35 40 40
25

65

4 SECTION D-D
5 SECTION C-C 6 SECTION B-B
SCALE 1:100
6 SECTION E-E
SCALE 1:100
SCALE 1:100 SCALE 1:100
25
50

Ø12@15 c/c
60 40 360 40 60
NOTE:
560
THE COLUMN'S STIRRUPS SPACING AT JOINT AND LONGITUDINAL BAR OVERLAPPING
63 LOCATION TO BE CONSIDERED AT 10cm SPACE AND THE REST AT 20cm.
SECTION X-X
3 SCALE 1:100 20
Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Elevated Tank 35 M3
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Renfor. Plan
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ---------
(B-B) Section (A-A) Section
Scale: All in Centimeter Scale: All in Centimeter
4 " Inch PVC Pipe

P.C.C, Mark:200
8
PPR 20 mm Pipe
8 cm Height concrete adage

12 cm P.C.C Mark:200
15 cm stone patching
62
Soak Pit filled with Bolder
8 8
0+0000 Ground Level 12 12 0+0000 Ground Level
15 15

Valve
Meter
10 100 10
60 8 cm Height concrete adage
Inlet Pipe
12 cm P.C.C Mark:200
Valve Box for placing
15 cm stone patching Meter and valve

50

Plan of Stand Post


Scale: All in Centimeter
A

10

35
Sloop 2%

10
50 10 100
10
B B
Sloop 2%
35
50 120

10

10 120 10
A

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile STP. Drawing
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-As shown Sheet Title Stand post
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ---------------------
1700
35 1615
Ø80 MM INNER DIAMETER GI PIPE
CONNECTED TO RESERVOIR

B
35

35
B

253.5
35
WATER
MANHOLE

238
1000

1000
915

35
Metallic Lockable

353.5
Main Gate
35

35
A
35 285 35 268 35 268 35 268 35 268 35
Note:
1- All dimensions are in cm unless otherwise stated.
2- During RCC work vibrator must be used to avoid.
3- All PCC works should be with M200 mortar unless otherwise stated.
4- All RCC works should be with M250 mortar unless otherwise stated.
5- Brick masonary (1:4).
6- Curing must be continued upto 28 days.
7- Clear and Clean water must be used every where.

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Boundry Wall
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Boundry Wall Plan
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ----------
45 45
5 35 5 5 35 5

4
5 5

3
153

153
10

25 35

210

210
7.5 7.5
3 2

3 2
5

5
45

45
45

45
50

50
50 50

Section B-B Section A-A

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Boundry Wall
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Front View+Section
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ------------------
7.5 15
95 7.5 40 40 40 40 40
15

10

10
70

70
G.L G.L G.L G.L

170

170

95
205
180
Non

100

100
Return C C
Valve

10

10
10 40
80 10
15

15
Well 16" Casing 8"
130 10Dia Dia
15 15 200 1510
Section A-A
15 Section B-B
15
A

7.5 7.5
10

80 15
15

95 40

Section C - C
Handle
B B
10

180
200

Non-return
Valve

RCC Slab

10
15

80 10 Handle
130

15
10
1015 15 12 12
A

10 10

Well Protection Plan Wall Reinforcement Handle

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Well Development
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Sections and details
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ------------------
D:\1-My Office Works Data\1-IMC\1-IMC-General Files\1-Projects\2-UNICEF\3-Paktika\1-Survey +Design Village 1\3-Autocad and other dwg\Solar Frame 1\Solar 1.jpg

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Solar Frame
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Frame 3 D
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # -----
D:\1-My Office Works Data\1-IMC\1-IMC-General Files\1-Projects\2-UNICEF\3-Paktika\1-Survey +Design Village 1\3-Autocad and other dwg\Solar Frame 1\Solar 2.jpg

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Solar Frame
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Fron View
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ----------
D:\1-My Office Works Data\1-IMC\1-IMC-General Files\1-Projects\2-UNICEF\3-Paktika\1-Survey +Design Village 1\3-Autocad and other dwg\Solar Frame 1\Solar 3.jpg

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Solar Frame
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Side View
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # --------------
D:\1-My Office Works Data\1-IMC\1-IMC-General Files\1-Projects\2-UNICEF\3-Paktika\1-Survey +Design Village 1\3-Autocad and other dwg\Solar Frame 1\Solar 4.jpg

Funded by: AHF Drafted and Design BY: IMC/WASH Team Province Balkh Date July/2022 Drawing Tile Solar Frame
INTERNATIONAL MEDICAL CORPS (IMC) Review and Checked by: Eng. Yousuf Mazhar District Nahr-e-Shahi Scale A3-Shown Sheet Title Back View
PROGRAM DEPARTMENT Village
WASH UNIT
Review and Approved by: Eng. Mohammad Yasir Shahrak Afghania Unit Centimeters Sheet # ----------

You might also like