STERLING AND WILSON — JINDUN CONSORTIUM
ur Ro: Sw /U6/She/1223 tate -2006.2022
“The Project Director, GEC-GMRC,
Block No, Third Floor, Karmyos! Bhawan,
Behind Nirman Bhawan, Sector-0A,
‘Gandhinagar ~ 382010, Gujarat, indi
Kind Attn;- Mr Sandeep Fuller (Projet Diector-GEC)
Design, Manufacture, Supply, instalation, Testing and Commésioning of; (A)
Electrical and Mechanical (E&M)Inlaing Hydraulics, Fire Safety ystoms, UPS & OG
‘Sets (8) Environmental Control Systm (ECS) and Building Management System ~
[BMS (C.Tunnel Ventilation System (TVS) and TVS - SCADA Werks, fr Underground
‘Station, Intermediate Vent shat and Associated Tunnels of East-West Coridor of
‘Ahmedabad Metro Rall Project Phase ~1
Subject: Submision of Weekly SHE performance report pertaining to CODA.
Ret. 1, GEC Letter No-GEC-102-000-2119883-4Dated20/03/2021
2.GECLettorNo-GEC-102-0002121948-A Dated:26/04/2021
3, GECLetterNo-GEC-102.000-2122220-8 Dated30/04/2023
Dears,
In Reference to the above subject, we wish to submit our report pertaining to the COVID-19,
_actvties being carried out at our Office and working sites.
Please find attached the report no: SW/SHE/COVIO-19/50, Ost: 12/06/2022
‘We hope thisisin ine with your Requirement.
Youre’ fifty,
For String and Wilson -indun Consortia,
ive: Mr. Tarun harem
Designation: Head Projects
Project: MEGA/UG/E&M-01
(CC:GMRC- Mr Sanjeev Mehta (GM Traction Systems)
‘Me. Pushlar Sings (GM)
‘Adsress:Univrsa Maesti,Sth or, A. Lothande Marg Cher (1), Mumia 40003 Tel 02225485300srzmuncawuson<, JN DUI
Raat
Project: ‘Ahmedabad Metro Rail Project Phase ~1
| [Besign, Manufacture, Suply installation, Testing and Commisloning of (A Electrical
| and Mechanical (EBM) Including Hydraules, Fike Saety Systems, UPS & OG Ses. (8)
| Environmental Control System (ECS) and Bullding Management System ~ BMS (). Tunnel
Scope of Contract: | yeniation system (TVS) and TVS-SCADA Works, for Underground Stations, Intermediate
Vent shaft and Associated Tunnels of East - West Cortdor of Ahmedabad Metro Rail
Project Phase 1
EBM Contractor: | wis, STERUNG AND WILSON ~JNOUN CONSORTIUM
Employer ‘Gujarat Metro Rail Corporation -
Document Title: | Weekly SHE performance report pertaining to COVID-19
06/06/2022 to 12/06/2022
Reporte: —_[sw/Swe/cowo-9/50
Contract No | MEGA/UG/EBM-O1
ame | pesgnaton pate | stnature
| Prepared By (Mrs. Monika Patel betel ae
decal Manager | soles
|
Rosewedy | Mr cishtamartatel ener snemanager | gf
»
Chief Project |
Approved by 7
MrTarun sharma ee aay ee
11P age1, REPORT SUMMERY
stemucn neon
Contract: Design, Manufacture, Supply, Installation, Testing and Commissioning of;
(A) Electrical and Mechanical (E&M) Including Hydraulics, Fie Safety Systems, UPS &
06 Sets. (8). Environmental Control System (ECS) and Building Management System —
{BMS (C). Tunnel Ventilation System (TVS) and TVS - SCADA Works, for Underground
Stations, Intermediate Vent Shaft and Associated Tunnels of East ~ West Corridor of
‘Ahmedabad Metro Rail Project Phase ~
EMERGENCY CONTACT NUMBER FOR COVID-19,
sLNo Name of Designation Contact Details
I Employee
1 Me. Tarun Chiot Project s711400210
sharma Manager _
2 ‘Mr.Girsh Kumar | Chief Safety Manager s7r76s6714
| patet
3 ‘Mr. Suraj Prakash | shahpur Station | so76r75373
Manager
Joa Mr. Suresh Gheekanta station ——|-—_—8290158390
Kumar Manager
5 Mr. Rakesh Kalupur station 147050788,
Pandey Manager
6 Mr. Sidharth Kankarya tation 1000200870
shrey Manager
2 Mr. Shawal HR/Admin Manager 8128198980
Tiwari
8 IMs. Monika Patel__ | Environment Manager 9726809709
aipaa e
2. SANITY is
Dur
aH
Station
3iPasesrenumeauason
Harmonics Cancellation and Alleviation of Ripple Content From AC-DC Uncontrolled Rectifier by Pulse-Multiplication Technique Using Phase-Shifting Transformer