You are on page 1of 26
STERLING & WILSON! 4INDUN SS iShRih STERLING AND WILSON — JINDUN CONSORTIUM ur Ro: Sw /U6/She/1223 tate -2006.2022 “The Project Director, GEC-GMRC, Block No, Third Floor, Karmyos! Bhawan, Behind Nirman Bhawan, Sector-0A, ‘Gandhinagar ~ 382010, Gujarat, indi Kind Attn;- Mr Sandeep Fuller (Projet Diector-GEC) Design, Manufacture, Supply, instalation, Testing and Commésioning of; (A) Electrical and Mechanical (E&M)Inlaing Hydraulics, Fire Safety ystoms, UPS & OG ‘Sets (8) Environmental Control Systm (ECS) and Building Management System ~ [BMS (C.Tunnel Ventilation System (TVS) and TVS - SCADA Werks, fr Underground ‘Station, Intermediate Vent shat and Associated Tunnels of East-West Coridor of ‘Ahmedabad Metro Rall Project Phase ~1 Subject: Submision of Weekly SHE performance report pertaining to CODA. Ret. 1, GEC Letter No-GEC-102-000-2119883-4Dated20/03/2021 2.GECLettorNo-GEC-102-0002121948-A Dated:26/04/2021 3, GECLetterNo-GEC-102.000-2122220-8 Dated30/04/2023 Dears, In Reference to the above subject, we wish to submit our report pertaining to the COVID-19, _actvties being carried out at our Office and working sites. Please find attached the report no: SW/SHE/COVIO-19/50, Ost: 12/06/2022 ‘We hope thisisin ine with your Requirement. Youre’ fifty, For String and Wilson -indun Consortia, ive: Mr. Tarun harem Designation: Head Projects Project: MEGA/UG/E&M-01 (CC:GMRC- Mr Sanjeev Mehta (GM Traction Systems) ‘Me. Pushlar Sings (GM) ‘Adsress:Univrsa Maesti,Sth or, A. Lothande Marg Cher (1), Mumia 40003 Tel 02225485300 srzmuncawuson<, JN DUI Raat Project: ‘Ahmedabad Metro Rail Project Phase ~1 | [Besign, Manufacture, Suply installation, Testing and Commisloning of (A Electrical | and Mechanical (EBM) Including Hydraules, Fike Saety Systems, UPS & OG Ses. (8) | Environmental Control System (ECS) and Bullding Management System ~ BMS (). Tunnel Scope of Contract: | yeniation system (TVS) and TVS-SCADA Works, for Underground Stations, Intermediate Vent shaft and Associated Tunnels of East - West Cortdor of Ahmedabad Metro Rail Project Phase 1 EBM Contractor: | wis, STERUNG AND WILSON ~JNOUN CONSORTIUM Employer ‘Gujarat Metro Rail Corporation - Document Title: | Weekly SHE performance report pertaining to COVID-19 06/06/2022 to 12/06/2022 Reporte: —_[sw/Swe/cowo-9/50 Contract No | MEGA/UG/EBM-O1 ame | pesgnaton pate | stnature | Prepared By (Mrs. Monika Patel betel ae decal Manager | soles | Rosewedy | Mr cishtamartatel ener snemanager | gf » Chief Project | Approved by 7 MrTarun sharma ee aay ee 11P age 1, REPORT SUMMERY stemucn neon Contract: Design, Manufacture, Supply, Installation, Testing and Commissioning of; (A) Electrical and Mechanical (E&M) Including Hydraulics, Fie Safety Systems, UPS & 06 Sets. (8). Environmental Control System (ECS) and Building Management System — {BMS (C). Tunnel Ventilation System (TVS) and TVS - SCADA Works, for Underground Stations, Intermediate Vent Shaft and Associated Tunnels of East ~ West Corridor of ‘Ahmedabad Metro Rail Project Phase ~ EMERGENCY CONTACT NUMBER FOR COVID-19, sLNo Name of Designation Contact Details I Employee 1 Me. Tarun Chiot Project s711400210 sharma Manager _ 2 ‘Mr.Girsh Kumar | Chief Safety Manager s7r76s6714 | patet 3 ‘Mr. Suraj Prakash | shahpur Station | so76r75373 Manager Joa Mr. Suresh Gheekanta station ——|-—_—8290158390 Kumar Manager 5 Mr. Rakesh Kalupur station 147050788, Pandey Manager 6 Mr. Sidharth Kankarya tation 1000200870 shrey Manager 2 Mr. Shawal HR/Admin Manager 8128198980 Tiwari 8 IMs. Monika Patel__ | Environment Manager 9726809709 aipa a e 2. SANITY is Dur aH Station 3iPase srenumeauason

You might also like