Professional Documents
Culture Documents
ABSTRACT
With the increasing growth in the number of industries and the competitive run
for the trophy of perfection and profit, these industries round the globe are in
the lookout for a roof to exhibit their products in the most
convenient ,profitable and successful means. Chambers of Commerce and
Industrial Associates around the world conduct expos or large trade fairs and
exhibitions with the aim of promoting their products and companies
INTRODUCTION:
The industries which have increasing growth want to sell their products and it
consumes a lot of time to sell their products if they go to each and every
customer. And also if people want to buy any product they need to go to
different places to buy them.
So, here is an industrial exhibition where the customers can purchase as many
products they want with a single transport rate. And even the exhibitors can sell
their products to many people with less risk.
UML DIAGRAMS
Use Case Diagrams identify functionality provided by the system (use cases),
the users who interact with the system (actors), and the association between the
users and the functionality. Use Cases used in the analysis phase of software
development to articulate the high-level requirement of the system. The primary
goals of Use Case Diagrams include:
ACTIVITY DIAGRAMS:
SEQUENCE DIAGRAMS:
Notation:
In a sequence diagram, classes and actors are listed as columns, with vertical
lifelines indicating the life time of the object overtime.
.
Lifeline The lifeline identifies the .
existence of the object overtime. .
The notation for the lifeline is .
SYSTEM DESIGN
UML DIAGRAMS
DFD DIAGRAMS
DFD Diagram (Level - 0)
Billing
ary Reports
Status&Custom
Financial list
BoothAudit Trails
Reports
Summ
Submit Self info
Login
Submit No. of years contract
Exhibitor Membership Status No. of stalls Registered
Exhibitor
Exhibitor Space Size Staff working
Administrator Exhibitor Priority Points Expo Management in each stall
Product code
Allocating Mail System Sponsor Details
codes &Badges Multiple Directory Listing
Customer Information
Register
GettingProduct
GettingProduct
Purchase
Login
Details
Report
Customer
Provide
Exhibitor
Administrator Login 1
Membership
Status
Exhibitor DB Exhibitor DB
Allocating Giving
1 Exhibitor Exhibitor 2
A stall Priority
Points
Exhibitor DB Customer DB
Allocating Mail
codes Getting The
2 & Administrator
Badges
Customer
Information
Administrator DB Exhibitor DB
Exhibitor DB Exhibitor DB
Exhibitor DB
Allocating
Multiple
3 Directory Exhibitor
Listing
Register Customer
Customer 1
The Customer Login
Information
Customer DB Customer DB
Getting Getting
1 Product Product 2
Details Report
Customer DB
Purchase
2 The Product Customer
Billing DB Billing DB
Giving Giving
1 Status & Billing
Summary Custom
Reports Reports
ADMINISTRATOR
Customer Information
Exhibitor
Product code
Sponsor Details
Register
Login
Customers
Giving Product Report
Purchase
DATA DICTIONARY
ADMINISTRATOR TABLE:
Pwd - Varchar2(20)
pwd - Varchar2(50)
PRODUCT TABLE:
MID - Number(5)
PID Number(5)
PRNAME Varchar2(30)
BTHNO Number(5)
SYSTEM IMPLEMENTATION
SCREEN SHOTS
SYSTEM TESTING
This includes, but is not limited to, the process of executing a program or
application with the intent of finding errors. One definition of testing is "the
process of questioning a product in order to evaluate it", where the "questions"
are operations the tester attempts to execute with the product, and the product
answers with its behavior in reaction to the probing of the tester.
White box and black box testing are terms used to describe the point of view a
test engineer takes when designing the test cases.
Black box being an external view of the test object and white box being an
internal view. Software testing is partly intuitive, but largely systematic. Good
testing involves much more than just running the program a few times to see
whether it works.
Software Testing is the process of executing software in a controlled manner; in
•Unit Testing: in which each unit (basic component) of the software is tested to
verify that the detailed design for the unit has been correctly implemented
•System Testing: in which the software is integrated to the overall product and
tested to show that all requirements are met
CONCLUSION
FUTURE ENHANCEMENTS
It is not possible to develop a system that meets all the requirements of the user.
User requirements keep changing as the system is being used.
Some of the future enhancements that can be done to this system are:
•Based on the future security issues, security can be improved using emerging
technologies.
ACTIVITY – 02
ACTIVITY – 03
ACTIVITY – 04(A)
BIO DATA
RESUME
EMAIL FORWARD
ORDER LETTER
JOINING LETTER
BIO DATA
Qualification
RESUME
AKSHAY KUMAR
Email: hibareakshaykumar@gmail.com
Contact no: 9845650462
Carrier objectives
To take up new experiences initiatives for strategic advantages through
continuous learning
& acquiring managerial soft skill & at the same time would like to
Contribute toward the
Growth of organization.
Academic profile
Technical experiences:
Electrical wiring, Auto CAD,
Personal information
Father name : Shivaji
Date of birth : 10/08/1999
Address : Rajeshwar
Languages Know n : Kannada, Hindi, Marathi, and English
Hobbies:
Playing games
Reading book
Watching movies
Riding
RESUME PROCEDURES
First go to ms word
Click the file option
Insert the new page & setup size, letter size
First create your name or mail
Choose the resume formate
Add your name and contact information
Write a standout resume headline
Add your professional resume summary statement
Details your work experience
List relevant skills and keywords
Add your education, certificates, and other relevant information.
Save the page
0RDER LETTER
Date: 05-08-2022
From
Akshay kumar
Humnabad
To,
KPCL, Company
RTPS, Raichur
Karnataka
Hopping to receive the said order soon without any delay, also the payment for
the same would be done soon
Thanking you,
Yours truly,
Akshay kumar
JOINING LETTER
5 August 2022
The managing directors
Raichur thermal power station
Dear sir,
I am sure that I can make I can make a significant contributes to your company
This position is ideally suited to my educational background as well as interest
So I humbly requested you to accept my joining letter.
Best regards
Akshay kumar
Cell-9845650462
E-mail ID : hibareakshaykumar@gmail.com
ACTIVITY-04(B)
ACTIVITY-05
INDUSTRIAL VISIT
ABSTRACT
This thesis attempts to present the steam blowing activity of super critical boiler
at different steam circuits and it show the state of the art of cleaning technology
for life time extension of Super critical Thermal Power Plant for both the units
of 2x500MW, YTPS. Raichur, Karnataka, India. Steam blowing dedicated to
removal of all welding debris and particles, after installation and creation of
propose conditions, for introduction of stearn into the turbine without operation
risk. The purpose of each steam blowing is to protect the downstream steam
turbine, this process requires that the pertinent CFR is obtained and mechanical
team purity is steam purity proved by means of target plate. Here by calculating
it is found that actual value of CFR is 1.2 to 1.7 that show the steans blowing is
effective and the target plate results are found to be satisfactory, Keywords:
Super entical Thermal Power Plant, Steam Blowing, Clean Force Ratio (CFR)
And Target Plate
INTRODUCTION
General Introduction The world ever energy saros are getting so and
increasingly exorbitant with time has reted in connus increase in potres plaat
Installation and in their sue. So that thermal power plant the main source of
electrical energy generation in our country. Powers producers are locking for
improve the efficiency of power plant and also grow concerns about the
environmental impacts of power genetics This demonstrates technology up
gradation of coal fired subontcal power plant in the market Introduction of
supercritical/ultra SC technologies on thermal power plants can change in
improve the performance of power plant In this project we have gone through
the newly constructed supercritical thermal power plant 2x800 MW at YTPS
Raichur being develope by Raichur Power Corporation Ltd (RPCL) a joint
venture of Karnataka Power Corporation Limited (KPCL) and M/s BHEL The
plant is located at Yeranaro Village, Raichur strict, Kamataka state, India.
deterioration of turbine efficiency, the measures are provided and the blowing
weps are discussed in detail to avoid the over high thermal stress. Among the
LITERATURE SURVEY
Martin Herberg, Dr. Eng Zoran Micevic, (2014). This article shoes the state of
the art of cleaning technology for modemization and recististraction of huge al
Power The chosen combination of chemical cleaning and steam blowing url the
best poble cleaning result and an optimal time schedule to die project. Chemical
cleaning was dedostal to remove iron oxides and all mineral. Stean blowing was
dedicated to removal of all remaining after installation and creation of proper
conditions for introduction of steam isto turbine without operational risk. The
approach to project were as follows Onders integration avoids coordination
problems, short rebuilding phases between chemical clean and t blow, we of
temporary steam blow pipes for execution of chemical cleaning, use of sans
equipment for chemical cleaning and items blow, temporary steam blow pipes
are already cleaned up to the target) B. Pier and G. Goldman, (1990); Studied
shown that compressed air blows may be the most effective and economical
approach to cleaning main steam lines. Benefits are flexible scheduling because
ar-blows can be worked into the start-up schedule without affecting other major
critical path activities, except for work on the boiler and steam fine prentre
parts. Balance of plant equipment associated with the boiler andboiler auxiliary
systems must be completed and checked before steam blowing is possible,
reduce manpower, time, fuel and cost, extends boiler life by eliminating
temperature cyaley in the beiler associated with steam blows to all cases the
super-heater, re-best main steam piping were clessed with compressed air
chemical cleaning and steam blowing Failure to remove debris may result in
increased turbine erosion, blade damage and rapid deterioration of turbine
efficiency
Principle of steam blowing
Steam blowing allows power station boilers and pipelines to ensure during
normal operation no adhering material in the superheaters, re-hosters and steurs
pipelines will become dislodged, reach the turbine blades, and damage tha
Puffing and continuous methods are mainly used for steam blirwing
The blowing of steam through ping to remove debris from the pipe, cleaning
steam lines to a steam turbine, cleaning plant expansion lines, or new installs.
As the definition says, to staan blow a pipe squires steam to blow through the
pipe. This pipe can be attached to a boiler and the other end of the pipe can be
attached to a steam turbine.
Location
Background
Opposition
Project Details
5.1 References
The photo below shows the plant near Yedlapur village, Riachur district,
Karmarks, india
Background
The project enginally started as a 1600 MW plant (2x800 MW) but was
reported at one point to have been increased to a 1700 MW (2x850 MW)
project. As of April 2012 the company has cleared and constructed a wall
around the 685 acre plot. In one report there were to be two units, one at
Yermarus and one at nearby Yedlapur However, in the most recent company
reports the project is a two-urut facility being constructed at Yermarus
As of August 2014, the sponser lists the size as 2 x 800 MW and under
construction. Commissioning is planned for 2015, later pushed to December
2015 for anit 1 and April 2016 for unit 2
Unit 1 was commissioned in March 2016. Unit 2 was synchronized in huly 2016
and is planned for commercial operation in January 2017.
Opposition
Project Details
Status: Operating
Type: Supercritical
Coal Source:
Source of financing:
While 991 acres of lands are already handed over for the project in de first and
sound phase, additional 130-acres are yet to be acquired in the third phase Once
completed the two-unit station, with much unit having an installed capacity of
100 MW, is expected to orate 11.913 million units of electric power a year.
BHEL has been ajor partner of KPCL in the development of Karnataka's power
sector, BHEL has supplied and executed 4,010 MW of coal-based sets for
KPCL & its JV, accounting for 95% of their installed coal-based capacity.
BHEL had earlier commissioned the 700 MW Bellary Stage-3 supercritical
project in Karnataka:
The mpany is also presently executing KPCL's first gas-based combined cycle
power project of 370 MW capacity involving a fuel-efficient advanced-class gas
turbine at Yelahanka BHEL is the market leader in both the subcritical as well
as the supercritical segments in the country, BHEL has contracted 48
supercritical Steam Generators (Boilers) 41 supercritical Steam Turbine
Generators- the highest in the country by any power
Notably, in the fiscal 2015-16 itself, BHEL has bem entrusted with orders for
12 percritical Steam Generators and 10 supergritical Steam Turbine Generators
by vio utilities. Of the contracted sets, BHEL has already commissioned 11
supercritical Sim Genersters and 9 supercritical Steam Turbine Generators in
the country. BHEL has once again peved its prowess as a leading supercritical
The Bharat Heavy Electricals Limited (BHEL), Haridwar unit has manufactured
the country's first indigenous 800 MW turbo generator.
It has made this state-of-the-art generator for the Yeramanus Thermal Power
Project of the Karnataka Power Corporation at Raichur. This generator can
supply power to about 6 lakh homes.
General manager (electrical machines) Anil Kapoor said this is the largest
capacity groerator ever made in India, and uses steel hollow conductors in place
of copper conductors.
With the muccessful dispatch of the generator, a new benchmark has been set
by BHEL Haridwar with respect to indigenous manufacture of dennal sets with
supercritical parameters.
The facility for assembly and testing of this series of generators has been
designed and engineered in-house at BHEL's Haridwar plant. The new facility
has the capability to manufacture and test turbo generators of up to 1,000 MW
rating
Turbo generator
Turbine
800-MW unit will begin generation after getting coal linkage, completion of
other works
The first generation unit of the newly set up yermarus thermal power station
railway siding would also have to be established before the unit could begin
commercial
generation.
The readiness for commercial operation announced after the first unit generated
at a capacity of 813.2 MW for 72 hours from 10.56 p.m. on March 4 to 10.56
p.m. on March 7 as part of various tests involved in the process
The YTPS, which has come up on 1,126 acres of land on the outskirts of
Raichur, has used supercritical technology which not only increases the
operational efficiency but also reduces heat rate. G. Kumar Naik, managing
director, Karnataka Power Corporation Ltd., told reporters that this was the third
power station in the country after Gujarat and Andhra Pradesh stations that had
adopted such a technology.
Mr. Naik, while congratulating the officials who worked on the project, said the
second unit
with 800 MW capacity would also begin commercial generation at the earliest.
The high-tech machinery used at the station would increase the operational
efficiency by 9%, he said. He said the heat rate of the machines was below 8%
compared with other units. The coal consumption would automatically get
reduced if the heat rate was low, he added. As my 320 men are required to
generate 800 MW of power every day.
Mr. Naik said suitable employment was being provided to those who had lost
their land for the power station. Of the 259 land-losers, 142 had applied for
jobs. Of them, 78 applicants had been offered jobs and the remaining
applications were under verification, he added.
Supercritical Technology