Proposed installation and commissioning of Potassium Soap processing plant (20MT per

month) from palm oil fatty acids at Serenia City Industrial Park, Selangor, Malaysia.

Project duration:
2 months

Raw material: Fatty acids, Palm Oil (Distilled Palm Stearin fatty acid)
Characteristic:

Output: Soap Grease 20MT per month


Characteristic:
Figure 1: The theoretical process (you may suggest the actual process)
Figure 2: Location for installation and commissioning at Industrial park, Serenia City ,Selangor,
Malaysia.

Expected deliverable
1. Presurised kettle
2. Contra rotary Agitator
3. heating and Cooling Unit
4. Milling system
5. Pipes Valve & Instrumentation
6. Transfer Pump
7. Skid
8. Basket Filter
9. Control Panel
Figure 3 : Expected Potassium Soap Processing plant Grease 20MT per month (Taken from
Youtube Frigmaires Oct 18, 2016)