Proposed Requirement of Installation and Commissioning of Soap Grease Processing Plant
Proposed Requirement of Installation and Commissioning of Soap Grease Processing Plant
month) from palm oil fatty acids at Serenia City Industrial Park, Selangor, Malaysia.
Project duration:
2 months
Raw material: Fatty acids, Palm Oil (Distilled Palm Stearin fatty acid)
Characteristic:
Expected deliverable
1. Presurised kettle
2. Contra rotary Agitator
3. heating and Cooling Unit
4. Milling system
5. Pipes Valve & Instrumentation
6. Transfer Pump
7. Skid
8. Basket Filter
9. Control Panel
Figure 3 : Expected Potassium Soap Processing plant Grease 20MT per month (Taken from
Youtube Frigmaires Oct 18, 2016)