You are on page 1of 2

Using Form No.1.

4, convert the Training Gaps into a Training Needs/


Requirements. Refer to the CBC in identifying the Module Title or Unit of
Competency of the training needs identified.

Form No. 1.4: Training Needs

Training Needs Module Title/Module of


Instruction
(Learning Outcomes)
Install electrical metallic /non-metallic
(PVC conduit) PERFORMING ROUGHING-
Install wire ways and cable tray IN ACTIVITIES, WIRING
AND CABLING WORKS FOR
Install auxiliary terminal cabinet and
SINGLE-PHASE
distribution panel
DISTRIBUTION, POWER,
Prepare for cable pulling and LIGHTING AND AUXILIARY
installation SYSTEMS
Perform wiring and cabling lay out
Notify completion of work

Electrical Installation and Date Developed: Document No. – CVS - 01


Maintenance NC II Issued by:
Page 1 of
Developed by:
Training needs Concepcion 1
Vocational School
PLAN TRAINING Revision # 00
SESSION
Electrical Installation and Date Developed: Document No. – CVS - 01
Maintenance NC II Issued by:
Page 2 of
Developed by:
Training needs Concepcion 1
Vocational School
PLAN TRAINING Revision # 00
SESSION

You might also like