4, convert the Training Gaps into a Training Needs/
Requirements. Refer to the CBC in identifying the Module Title or Unit of Competency of the training needs identified.
Form No. 1.4: Training Needs
Training Needs Module Title/Module of
Instruction (Learning Outcomes) Install electrical metallic /non-metallic (PVC conduit) PERFORMING ROUGHING- Install wire ways and cable tray IN ACTIVITIES, WIRING AND CABLING WORKS FOR Install auxiliary terminal cabinet and SINGLE-PHASE distribution panel DISTRIBUTION, POWER, Prepare for cable pulling and LIGHTING AND AUXILIARY installation SYSTEMS Perform wiring and cabling lay out Notify completion of work
Electrical Installation and Date Developed: Document No. – CVS - 01
Maintenance NC II Issued by: Page 1 of Developed by: Training needs Concepcion 1 Vocational School PLAN TRAINING Revision # 00 SESSION Electrical Installation and Date Developed: Document No. – CVS - 01 Maintenance NC II Issued by: Page 2 of Developed by: Training needs Concepcion 1 Vocational School PLAN TRAINING Revision # 00 SESSION