You are on page 1of 2
Ref. Date Project Contract No. thyssenkrupp es Cae, Gaye 1089-thyssenkrupp-KA-21-003 06/05/2021 Villette Project — Neighborhood F (Multi-Family) 301-004-CC-P33 To : Khatib & Alami Consultants S.A.E Attention : Eng. Sherbiny Ibrahim cc SOREAL for Real Estate investment S.A.E Attention : Eng. Mohamed El Fateh (Project Executive Director) Subject Elevator works readiness _ Dear Sir, Regarding to A/M subject , herein comments which need to be considered for elevator installation. 1) Phase 1 (Mechanical stage): 2). Phase 2 (Testing & Commission); Adjust elevator core walls from remain steel rods and concrete remnants. Clean core pit and adjust to be 1200 mm from finish floor level (Fig-1)- Suitable power source to be available near to elevator core, Scaffold erection with safety requirement (attached). Elevators door fixation (Top and bottom 300 mm Of Concrete or steel beam) as shown (Fig.2).. Proper lighting for elevator core. Proper safety precaution for opening area in building. Reachable Finish floor level, axis points for door fixation. ‘Complete Closing around elevator doors, rime: RECENED Finalize all required electric or interfacing work which not tkeescope. Shaft Lighting with it’s Power cable and Isolated switch. Permanent power terminated in disconnector for elevator control unit. Permanent power (380V) With power cable (3 Phase + Neutral + Earth). Proper ventilation opening at top of elevator core (Fig.3) & (Fig.4). Opening for elevator calls push buttons and fire switch -main floor- (fig.5) Open in side wall for control panel at top of elevator core ‘hsringp de Et SAE cpl nanitaidinah, Sats lon Ser Shon gs Cn, ot mA laa uo SS ae ET @ Srocaiene est Ftocacz ease ON RES ET Roy Saat © eq loin corn, ave hysserkrugp-

You might also like