You are on page 1of 8

PROBLEM: PROBLEM:

THE SIDES OF RHOMBUS IS 100cm LONG AND THE THE DIAGONALS OF PARALLELOGRAM ARE 18cm &
LENGTH OF THE LONGER DIAGONAL IS 160cm. 28cm RESPECTIVELY. ONE OF THE SIDES OF THE
PARALLELOGRAM IS 10cm.
1. FIND THE SMALLER ANGLE BETWEEN THE
SIDES OF THE RHOMBUS. 1. COMPUTE THE SMALLEST ANGLE OF
a. 36.87 INTERSECTION OF THE TWO DIAGONALS.
b. 45 a. 45.38
c. 73.74 b. 36.87
d. 90 c. 53.13
d. 134.62
2. FIND THE LENGTH OF THE SMALLER DIAGONAL.
a. 60 2. COMPUTE THE AREA OF PARALLELOGRAM
b. 80 a. 179. 37
c. 120 b. 200.78
d. 160 c. 134.62
d. 120
3. FIND THE AREA OF RHOMBUS
a. 8 000 3. COMPUTE THE OTHER SIDE OF THE
b. 9 600 PARALLELOGRAM
c. 12 000 a. 31.21
d. 15 000 b. 11.21
c. 23.11
d. 21.31
PROBLEM:

TWO PERPENDICULAR CHORD 5cm


FROM THE CENTER OF A CIRCLE
DIVIDES THE CIRCLE INTO 4 PARTS. IF
THE RADIUS OF THE CIRCLE IS 13cm,

1. COMPUTE THE CENTRAL ANGLE


SUBTENDED BY THE ARC OF THE
SMALLEST PART.
a. 22.62
b. 44.76
c. 48.34
d. 43.24

2. COMPUTE THE AREA OF THE


SECTOR CONTAINING THE SMALLEST
PART.
a. 33
b. 44
c. 55
d. 66

3. COMPUTE THE AREA OF THE


SMALLEST PART.
a. 11
b. 21
c. 33
d. 31
PROBLEM: PROBLEM:

AT 11:00AM THE WATER IN A A 3m CURVED STRIP AROUND AND ABOVE THE


SPHERICAL TANK WAS 1.8M DEEP. AT BASE OF A HEMISPHERICAL DOME IS TO BE
1:00PM THE WATER LEVEL DROPPED BY COVERED WITH ONE COAT OF WATER
1,5M. HOW MUCH WATER WAS USED. PROOFING COMPOUND WHICH CAN BE SPREAD
DIAMETER OF TANK IS 4m. AT THE RATE OF 120 sq ft PER GALLON. HOW
MANY GALLONS OF COMPOUND WILL BE USED.
a. 13.7 DIAMETER OF DOME IS 15M.
b. 14.7
c. 15.7 a. 22.92
d. 12.7 b. 137.64
c. 1480.80
d. 12.34
PROBLEM:
A DULY LICENSED ENGINEER COLOR REPRESENTATION
A PERSON OR ENTITY WHO IS HIRED BY THE
PROJECT OWNER TO ACT IN THE OWNER’S BEHALF WHO SHALL BE TASKED TO BE
PRESENT AT THE CONSUMER 1. FIRE PROTECTION, TO CALL ATTENTION
CONCERNING SUPERVISION AND MONITORING OF TO FIRE PROTECTION EQUIPMENT
ALL MATTERS RELATED TO THE OVERALL SITE AT ALL TIMES, WHENEVER
WORK IS BEING UNDERTAKEN APPARATUS AND FACILITIES.
EXECUTION OF A CONSTRUCTION PROJECT.
AND SHALL HAVE THE
a. RESIDENT ENGINEER RESPONSIBILITY OF ASSURING a. YELLOW
b. CONSULTANT THE TECHNICAL CONFORMANCE b. RED
c. SAFETY PERSONNEL OF ALL DESIGNS, MATERIALS, c. GREEN
d. FOREMAN PROCESSES, WORK d. ORANGE
PROCEDURES RENDERED FOR
THE EXECUTION OF THE
IS THE RIGHT TO CORRECT, COMMAND, AND 2. SAFETY, DESIGNATING SAFETY
CONSTRUCTION PROJECT
DETERMINE THE COURSES OF ACTION
INCLUDING SAFETY AND HEALTH
OF ALL PEOPLE WITHIN THE a. WHITE
a. RESPONSIBILITY b. RED
b. AUTHORITY CONSTRUCTION SITE.
c. GREEN
c. DELEGATION
a. RESIDENT ENGINEER d. BLUE
d. ACCOUNTABILITY
b. PROJECT MANAGER
c. SAFETY PERSONNEL
IS SHARING THE AUTHORITY AND RESPONSIBILITY d. SAFETY AND HEALTH 3. ALERT TO DESIGNATE DANGEROUS
WITH OTHERS, EVEN THOUGH WE DELEGATE COMMITTEE PARTS OF MACHINES ENERGISED
RESPONSIBILITY, WE CANNOT BE COMPLETELY EQUIPMENT ELECTRICAL HAZARD.
RELIEVED FROM IT.
REFERS TO ANY PERSON a. RED
a. RESPONSIBILITY b. ORANGE
b. AUTHORITY ENGAGED BY ANY
CONSTRUCTOR TRAINED, c. BLUE
c. DELEGATION d. YELLOW
d. ACCOUNTABILITY ACCREDITED BY DOLE AND
TASKED TO PROVIDE
OCCUPATIONAL SAFETY AND
IS AN ACTIVE MEASUREMENT TAKEN BY HELATH SERVICES FOR THE 4. PRECAUTION, TO DESIGNATE CAUTION,
MANAGEMENT TO ENSURE COMPLIANCE WITH WORKERS/EMPLOYEES IN ANY LIMITED TO WARNING AGAINST STARTING
STANDARDS. CONSTRUCTION PROJECT. USE OR THE MOVEMENT OF EQUIPMENT
WHICH IS UNDER REPAIR.
a. RESPONSIBILITY a. CERTIFIED FIRST-AIDER
b. AUTHORITY b. SAFETY AND HEALTH a. PURPLE
c. DELEGATION
COMMITTEE b. BLUE
d. ACCOUNTABILITY c. RED
c. SAFETY PERSONNEL
d. SENATOR d. ORANGE
PROBLEM PROBLEM:

A PENDULUM SWINGS A THE 70 HIGHEST DAMS IN THE WORLD HAVE


LENGTH OF 40cm ON ITS FIRST AN AVERAGE HEIGHT OF 206m. WITH A
SWING, EACH SUCCESSIVE STANDARD DEVIATION OF 35m. THE HOOVER
SWING IS 4/5 THE PRECEDING AND GRAND COULEE DAMS HAVE HEIGHTS
SWING. OF 221 AND 168m RESPECTIVELY. THE
RUSSIANS’ DAMS, TEH NUREK AND
1. FIND THE LENGTH OF THE CHARVAK HAVE HEIGHTS WITH Z-SCORES
FIFTH SWING. OF +2.69 AND -1.13 RESPECTIVELY. LIST THE
a. 16.4 cm DAMS IN ORDER OF ASCENDING SIZE.
b. 13.1
c. 25.6 a. CHARVAK, HOOVER, NUREK, GRAND
d. 20.5 COULEE
b. CHARVAK, NUREK, GRAND COULEE,
2. FIND THE TOTAL DISTANCE HOOVER
TRAVELED BY THE PENDULUM c. CHARVAK, HOOVER, GRAND COULEE,
BEFORE IT COMES TO REST. NUREK
a. 220 cm d. CHARVAK, GRAND COULEE, HOOVER,
b. 200 NUREK
c. 180
d. 240
PROBLEM: CE BOARD NOV 2021 PROBLEM: PROBLEM

A NORMALLY DISTRIBUTED RANDOM GIVEN IS THE AVERAGE MEAN TIME OF A LARGE BATCH OF ELECTRIC LIGHT BULBS HAVE A
VARIABLE HAS A MEAN VALUE OF 50 A LIGHT BULB OF A A CERTAIN BRAND MEAN TIME TO FAILURE OF 2400 HRS AND THE
AND A STANDARD DEVIATION OF 4. WHICH IS 2400 hps WITH A STANDARD STANDARD DEVIATION OF 60 HRS FOR A BATCH OF
FIND THE PROBABILITY THAT IT IS DEVIATION OF 320. DETERMINE THE 4200 BULBS.
MORE THAN 57. PROBABILITY THAT THE MEAN TIME OF
a. 0.04006 FAILURE WILL BE BETWEEN 2300 and 1. HOW MANY LIGHT BULBS WILL LIKELY LAST MORE
b. 0.01111 2500 HRS. IF A RANDOM SAMPLE OF 20 THAN 2500 HRS?
c. 0.0999 LIGHT BULBS IS DRAWN FROM A a. 201
d. 0.0714 BATCH. b. 256
c. 183
a. 24.534 d. 154
b. 25.286
c. 22.481 2. WHAT PERCENTAGE OF THE TOTAL NUMBER OF
d. 23.364 BULBS WILL LIKELY LAST BETWEEN 2200 HRS TO
2500 HRS.
a. 92.74%
b. 90.28
c. 95.18
d. 96.35

3. WHAT IS THE PROBABILITY THAT ANY LIGHT BULB


WILL LAST FOR 2450 HRS?
a. 0.0054
b. 0.0063
c. 0.0031
d. 0.0047
PROBLEM:

A FUNCTION IS NORMALLY
DISTRIBUTED WITH MEAN VALUE OF
8 AND STANDARD DEVIATION OF 2.

1. WHAT PERCENTAGE OF THE


OBSERVATION WILL BE GREATER
THAN 5?
a. 93.32%
b. 85.64%
c. 56.32%
d. 75.41%

2. WHAT PERCENTAGE OF THE


OBSERVATION WILL BE GREATER
THAN 10?
a. 13.26
b. 12.89
c. 15.87
d. 18.75

3. WHAT PERCENTAGE OF THE


OBSERVATION WILL HAVE A VALUE
LESS THAN 3?
a. 2.387
b. 0.968
c. 1.256
d. 0.621

You might also like