You are on page 1of 1

BONGGALO ROUGHT MATERIALS AND LABOR ESTIMATION

Materials Quantity Price/Item Total


Cement 370 300 111,000
Gravel G2 15 loads 1000 15,000
Sand 3 loads 1000 3,000
4”halloblocks 2,800 pcs 1,400 39,000
10mm steelbar 380 pcs 175 65,000
12 mm steelbar 150 pcs 245 36,750
Tiewire #16 barut 50 kils 100 5,000
2x3x12 ft wood 70 pcs 250 17,500
1/2x4x8ft penollic 10 pcs 900 9,000
flywood
2,3,4 assorted nail 25 kilos 100 2,500
2.0mm stranded wire 3 box 2,500 7,500
3.5mm stranded wire 3 box 3,500 10,500
Utility box 2x4 30 pcs 55 1,650
Junction box 4” 12 pcs 55 660
Electrical tape big 3 pcs 120 360
Breaker box 6 hole 1 pc 950 950
Breaker switch 15 ampir 1 pc 450 900
Breaker switch 20ampir 2 pcs 580 1,160
Breaker switch 40 ampir 1 pc 670 670
½ mouldiflex 1 roll 1,100 2,220
¾ Conduent pipe 2 pcs 195 390
2” pvc orange 6 pcs 250 1,500
3” pvc orange 8 pcs 350 2,800
Php. 335,490 Total Materials
Php. 117,421 35% labor
Php. 452,911.5 Grand total