TECHNICAL SPECIFICATION
FOR
TRANSMISSION LINE WORKS
ASSOCIATED WITH TRANSMISSION
PROJECT IN KENYA THROUGH PPP-JV
MODEL WITH AFRICA50
VOLUME-II
(This document is meant for the exclusive purpose of bidding against this
specification and shall not be transferred, reproduced or otherwise used for
purposes other than that for which it is specifically issued).
TECHNICAL SPECIFICATION
(VOLUME-II)
CONTENTS
SECTION-I A SCOPE
SECTION-I B GENERAL INFORMATION
SECTION-II GENERAL TECHNICAL CONDITIONS
SECTION-III SURVEY AND SOIL INVESTIGATION
SECTION-IV A TOWER DESIGN
SECTION-IV B TOWER TESTING
SECTION-IV C FABRICATION, ERECTION AND STRINGING
SECTION-IV D FOUNDATION (CONTRACTOR DESIGN)
Section-IV F MONOPOLE STRUCTURE, FOUNDATION AND ERECTION
SECTION-VI A HARDWARE FITTINGS & ACCESSORIES
SECTION-VII A CONDUCTOR
SECTION-VIII COMPOSITE LONGROD INSULATOR
SECTION-X OPGW
SECTION-XI DRAWINGS
SECTION-XII FAQ
SPECIFICATION OF TRANSMISSON LINE (SECTION-SCOPE)
SECTION-I A
SCOPE
SPECIFICATION OF TRANSMISSON LINE (SECTION-SCOPE)
TECHNICAL SPECIFICATIONS
SECTION-I A
SCOPE
Revision History
Revision Date Clause Ref Description
No.
Rev-0 July’2022 First Release
SPECIFICATION OF TRANSMISSON LINE (SECTION-SCOPE)
TECHNICAL SPECIFICATIONS
SECTION-I A
SCOPE
CONTENTS
1.0 Scope 1
TECHNICAL SPECIFICATIONS
SECTION- I A
SCOPE
1.0 Scope
1.1 The following transmission lines are included in the scope of the Contractor under
various packages:
Package – SS03 (TL Portion)
• 220kV D/C (ACSR Canary) Kisumu (Kibos)-Kakamega-Musaga Transmission Line
• LILO of both Circuits of Musaga (Existing) - Lessos 132kV D/c line at
Musaga(New)
1.2 This Specification covers the following scope of works:
(i) Detailed survey including route alignment, profiling, tower/ pole structure
spotting, optimization of tower/pole structure locations, soil resistivity
measurement & geotechnical investigation (including special foundation
locations viz. pile/well foundation locations, whenever applicable &
covered under BPS);
(ii) Check survey;
(iii) Right-of-Way clearing and access roads
(iv) Testing of Construction Materials and concrete mix
(v) Design and Proto type testing of transmission line towers
(vi) Design and Proto type testing of pole structures
(vii) Fabrication and supply of all type of transmission line Towers as per
Contractor’s design/drawings (including River crossing towers (wherever
applicable) as per Employer’s design/ drawings) including fasteners, step
bolts, hangers, D-shackles etc.;
(viii) Fabrication and supply of transmission line monopole structures alongwith
cross arms, earth wire peaks, base plates and anchor bolts for foundations,
as per Contractor’s design/ drawings including required fasteners i.e.
bolts, nuts, spring washers, etc., and other accessories including step
bolts/ hooks/ ladder, hangers, D-shackles/ fixtures etc. as may be required
for monopole structure
(ix) Supply of all types of tower accessories like phase plate, circuit plate
(where ever applicable), number plate, pole plate (where ever applicable),
danger plate, anti-climbing device, Bird guard, (where ever applicable);
(x) Supply of
a) Hardware Fittings and accessories for Conductor
b) ACSR Canary Conductor
(xi) Design of foundations for different soil conditions for different type of
towers
(xii) Design of foundations for different soil conditions for different type of pole
structures
(xiii) Classification of foundations for different type of towers and Casting of
Foundations for tower/ *pole structure footings as per Contractor’s
foundation design/ drawing;
(xiv) Supply & Installation of Tower/ *Pole structure Earthing.
(xv) Supply & installation of Insulated Conductor sleeve, (if required & covered
under BPS);
(xvi) Supply & installation of Bird Diverter, (if required & covered under BPS);
(xvii) For transmission lines, to promote mechanization and safe working
conditions, use of crane is being promoted. Erection of towers/ *pole
structures by using crane (wherever feasible), tack welding of bolts and
nuts including supply and application of zinc rich paint, fixing of insulator
strings, stringing of conductors and earth wires/OPGW along with all
necessary line accessories. However, where usage of crane is not possible,
erection of towers has to be carried out by conventional method i.e using
Gin pole, Derrick, Centre mast etc. through usage of Power Operated
Winch Machines. No tractor shall be allowed for tower/ *pole structure
erection.;
(xviii) Stringing of Power line crossing section under Live Line Condition (where
ever applicable & covered under BPS);
(xix) Painting of towers/ *pole structures & supply and erection of span
markers, obstruction lights (wherever applicable) for aviation
requirements (as required)
(xx) Testing and commissioning of the erected transmission lines and
(xxi) Supply of Mandatory Spares for Transmission Line at designated store.
(xxii) Supply of Tools & Plants for Operation and Maintenance of Transmission
Line including T&Ps for OPGW.
(xxiii) Supply of Emergency Restoration System (ERS) for Transmission Line
(xxiv) Other items not specifically mentioned in this Specification and/or BPS but
are required for the successful commissioning of the transmission line,
unless specifically excluded in the Specification.
(xxv) Maintenance of the line until completion of the defect liability period.
(xxvi) The installation/stringing of OPGW cable along with associated fittings &
accessories shall be carried out by the contractor. The scope of
installation/stringing shall include splicing, termination, testing,
demonstration for acceptance & commissioning as well as documentation.
Splicing is preferred to be carried out at Tension towers locations.
However, it shall be permitted at Suspension Tower locations also as
required due to site conditions. The installation/stringing and splicing shall
be carried out as per owner guidelines (provided as part of TS). The FODP
& Approach cable shall also be installed by the Contractor (where ever
applicable as per BPS).
1.4.2 The Contractor shall have to construct the transmission line portions, covered
under the tower package, completely up to dead end towers at either/substation
end. Stringing shall also be carried out from dead end tower to terminal
arrangements/terminal points.
The bidder shall have experience of its own or should engage the services of an
agency (ies) meeting the following experience, for carrying out Transmission line
works covered under the scope of the work of the package.:-
The Bidder should have carried out the following as a prime contractor+:
(a) Successfully completed$ physical construction of one (1) transmission line project of
not less than 100 kms of 220kV S/C or 220kV D/C or higher voltage class transmission
line within the last seven (07) years as on the date of NOA involving the following
scope of work:
And
(b) Designed and successfully tested/got successfully tested@ 220kV S/C or 220kV D/C or
higher voltage class transmission line tower
Note + : In case of works executed under a contract that had been awarded on a Joint
Venture, the experience of individual Joint Venture partner shall be considered limited
to the scope of that partner under the said contract.
3.1.1 The transmission towers covered under the package are of self-supporting hot dip
galvanized lattice steel type, designed to carry the line conductors with necessary
insulators, earth wire, OPGW (If applicable) and all fittings under all loading
conditions. Outline diagram of towers are enclosed with the Specification.
3.1.2 The towers shall have mild steel or/and high tensile steel sections and shall be
fully galvanized as specified in relevant clauses in section-IV. Bolts and nuts with
spring washer are to be used for connections.
3.1.3 The towers are of the following types:
A) Double Circuit
3.2.1 The towers for 220 kV Double Circuit Lines shall be of Vertical Configuration and
are classified as given below:
3.4.1.1 The Tower which is designed for normal span/ design span (considering towers at
equal RL) to get the required ground clearance shall be called as Normal Tower
(Basic Tower body + 0 m).
3.4.1.2 For spans less than or greater than normal span, the requisite clearance can be
achieved by providing leg/ body extension (-ve or +ve) attached to the Normal or
Basic tower body depending upon which alternative is most economical.
3.4.1.3 The nomenclature of these extensions shall be based on difference in level of last
leg with respect to normal tower. For example, if the length of extension (one
quadrant) is such that the last leg level is 1.5 m below with respect to normal
tower level, it will be called as +1.5 m leg extension. Similarly, if the length of
extension (one quadrant) is such that the last leg is 3.0 m above in respect to
normal tower, it will be called as -3.0 m leg extension. In case all leg extension are
of same height, the same shall be called as body extension. Indicative sketches for
leg/ body extension are enclosed in bid drawings.
3.4.1.4 In the BPS, charges for design & fabrication of Basic tower body (including
common plan at Basic Level) and leg extensions (one quadrant of tower including
parts of plan other than that at basic level, to be connected from basic body level/
or any other level) are required to be quoted. Unit charges for leg extension shall
be quoted for one quadrant (excluding common plan at Basic Level but including
parts of plan at other level or/and additional members required as per design)
beyond basic tower. For eg. Unit charges of +9 M Leg extension shall include all
parts of one quadrant of tower beyond basic tower (excluding common plan at
Basic Level and stub). Charges for the Normal/ Standard tower (i.e. Basic Body+0
m) and other extension towers shall be summation of the unit price of the Basic
Body and the total unit prices of four applicable leg extensions
Similarly, erection charges of leg extensions are required to be quoted for one
quadrant of tower.
3.4.1.5 Towers shall be designed such that the base width (C.G to C.G) at normal level (±
0 m) does not exceed 7 (seven) m.
3.4.2 Foundation
3.4.2.1 Volume batching may be allowed where weigh-batching is not practical/ feasible
due to site constraints provided accurate bulk densities of materials to be actually
used in concrete have earlier been established. Allowance for bulking shall be
considered as per relevant BS EN code. The mass volume relationship should be
checked before taking cube samples.
3.4.2.2 Minimum reinforcement in any pad/ slab of foundation including sloped pad/
haunch shall not be less than 0.12% of cross section area in each direction.
4.1 For the purpose of present scope of work, technical specification shall consist of
following parts and they should be read in conjunction with each other: -
4.2 In case of any discrepancy between Section-IA (Scope) and Section-IB (General
Information) and other technical specifications on scope of works, Section-IA
(Scope) shall prevail over all other sections.
Moderately hot and humid tropical climate conducive to rust and fungus growth.