VELAMMAL ENGINEERING COLLEGE

19IT204T - OBJECT ORIENTED


SOFTWARE ENGINEERING
DR.P.VISU
PROFESSOR
DEPT OF CSE
Objectives
▪To understand the phases in a software project
▪To understand fundamental concepts of
requirements engineering and Analysis
Modeling.
▪To understand the basics of object oriented
concept
▪To understand the major considerations for
enterprise integration and deployment.
▪To learn various testing and project
management techniques
COURSE OUTCOMES
BLOOMS
CO. NO. COURSE OUTCOME
LEVEL
At the end of the course students will be able to
CO 1 Compare different process models. C4
Formulate Concepts of requirements engineering and
CO 2 C4
Analysis Modeling.
To understand the fundamentals of object oriented
CO 3 C3
concept
CO 4 Apply systematic procedure for software design C4
CO 5 Find errors with various testing techniques C4
CO6 Evaluate project schedule, estimate project cost and
C5
effort required
Syllabus
UNIT-I Software Process and Agile Development 9
Introduction to Software Engineering, Software Process, Perspective and
Specialized Process Models – Introduction to Agility – Agile process – Extreme
programming – XP process - Estimation-FP,LOC and COCOMO I and II, Risk
Management, Project Scheduling.
.
UNIT-II Requirements Analysis and Specification 9
Software Requirements: Functional and Non-Functional, User requirements,
Software Requirements Document – Requirement Engineering Process:
Feasibility Studies, Requirements elicitation and analysis, requirements
validation, requirements management-Classical analysis: Structured system
Analysis, Petri Nets
UNIT III- Object Oriented Concepts 9
Introduction to OO concepts, UML Use case Diagram,Class Diagram-Object
Diagram-Component Diagram-Sequence and
Collaboration-Deployment-Activity Diagram-Package Diagram
Syllabus
UNIT-IV Software Design 9
Design Concepts- Design Heuristic – Architectural Design –Architectural
styles, Architectural Design, Architectural Mapping using Data Flow- User
Interface Design: Interface analysis, Interface Design –Component level
Design: Designing Class based components.
UNIT-VTesting and Management 9
Software testing fundamentals- white box testing- basis path testing-control
structure testing-black box testing- Regression Testing – Unit Testing –
Integration Testing – Validation Testing – System Testing And Debugging
–Reengineering process model – Reverse and Forward Engineering.
Total: 45 Periods
Syllabus
LEARNING RESOURCES:
TEXT BOOKS
1.Roger S. Pressman, “Software Engineering – A Practitioner’s Approach”, Eighth
Edition, McGraw-Hill International Edition, 2019.(Unit I,II,IV,V)
2. Ian Sommerville, “Software Engineering”, Global Edition, Pearson Education Asia,
2015.(Unit I,II,III)
3.Bernd Bruegge& Allen H. Dutoit Object-oriented software engineering using UML,
patterns, and Java ,Prentice hall ,3rd Edition 2010.(Unit III)

REFERENCES
1.Titus Winters,Tom Manshreck& Hyrum Wright, Software Engineering at
Google,lessons learned from programming over time, O’ REILLY publications,2020.
(Unit I,II,IV,V)
2.Rajib Mall, “Fundamentals of Software Engineering”, Third Edition, PHI Learning
Private Limited, 2009. (Unit I,II,IV,V)
3.PankajJalote, “Software Engineering, A Precise Approach”, Wiley India, 2010 (Unit
I,II,IV,V)

ONLINE LINKS
1.http://www.nptelvideos.in/2012/11/software-engineering.html
2. https://nptel.ac.in/courses/106/101/106101061/
UNIT - 5
Software Testing Strategies

8
Software
Testing
Testing is the process of exercising a
program with the specific intent of finding
errors prior to delivery to the end user.

9
What Testing Shows

errors
requirements conformance

performance

an indication
of quality

10
Who Tests the Software?

developer independent tester


Understands the system Must learn about the system,
but, will test "gently" but, will attempt to break it
and, is driven by "delivery" and, is driven by quality

11
Testing Strategy
unit test integration
test

system validation
test test

12
Testing Strategy
• We begin by ‘testing-in-the-small’ and move
toward ‘testing-in-the-large’
• For conventional software
– The module (component) is our initial focus
– Integration of modules follows
• For OO software
– our focus when “testing in the small” changes from an
individual module (the conventional view) to an OO
class that encompasses attributes and operations and
implies communication and collaboration

13
Strategic Issues
• State testing objectives explicitly.
• Understand the users of the software and develop a profile for each user category.
• Develop a testing plan that emphasizes “rapid cycle testing.”
• Build “robust” software that is designed to test itself
• Use effective formal technical reviews as a filter prior to testing
• Conduct formal technical reviews to assess the test strategy and test cases
themselves.
• Develop a continuous improvement approach for the testing process.

14
Unit Testing

module
to be
tested
results
software
engineer test cases

15
Unit Testing
module
to be
tested
interface
local data structures
boundary conditions
independent paths
error handling paths

test cases

16
Unit Test Environment
driver
interface
local data structures
Module boundary conditions
independent paths
error handling paths
stub stub

test cases
RESULTS
17
Integration Testing Strategies
Options:
• the “big bang” approach
• an incremental construction strategy

18
Top Down Integration
A
top module is tested with
stubs

B F G

stubs are replaced one at


a time, "depth first"
C
as new modules are integrated,
some subset of tests is re-run
D E

19
Bottom-Up Integration
A

B F G

drivers are replaced one at a


time, "depth first"
C

worker modules are grouped into


builds and integrated
D E

cluster

20
Sandwich Testing
A
Top modules are
tested with stubs

B F G

Worker modules are grouped into


builds and integrated
D E

cluster

21
Object-Oriented
• begins by
Testing
evaluating the correctness and
consistency of the OOA and OOD models
• testing strategy changes
– the concept of the ‘unit’ broadens due to
encapsulation
– integration focuses on classes and their execution
across a ‘thread’ or in the context of a usage scenario
– validation uses conventional black box methods
• test case design draws on conventional methods,
but also encompasses special features

22
Broadening the View of “Testing”
It can be argued that the review of OO analysis and
design models is especially useful because the same
semantic constructs (e.g., classes, attributes, operations,
messages) appear at the analysis, design, and code level.
Therefore, a problem in the definition of class attributes
that is uncovered during analysis will circumvent side
effects that might occur if the problem were not
discovered until design or code (or even the next
iteration of analysis).

23
High Order Testing
• Validation testing
– Focus is on software requirements
• System testing
– Focus is on system integration
• Alpha/Beta testing
– Focus is on customer usage
• Recovery testing
– forces the software to fail in a variety of ways and verifies that recovery is properly
performed
• Security testing
– verifies that protection mechanisms built into a system will, in fact, protect it from
improper penetration
• Stress testing
– executes a system in a manner that demands resources in abnormal quantity,
frequency, or volume
• Performance Testing
– test the run-time performance of software within the context of an integrated
system

24
Debugging:
A Diagnostic Process

25
The Debugging Process
test cases

new test results


regression cases
tests suspected
causes
corrections Debugging
identified
causes

26
Debugging Effort
time required
to diagnose the
time required symptom and
to correct the error determine the
and conduct cause
regression tests

27
Testabilit
• y operates cleanly
Operability—it
• Observability—the results of each test case are readily
observed
• Controllability—the degree to which testing can be automated
and optimized
• Decomposability—testing can be targeted
• Simplicity—reduce complex architecture and logic to simplify
tests
• Stability—few changes are requested during testing
• Understandability—of the design
28
What is a “Good” Test?
• A good test has a high probability of finding an
error
• A good test is not redundant.
• A good test should be “best of breed”
• A good test should be neither too simple nor
too complex

29
Internal and External Views
• Any engineered product (and most other things) can be
tested in one of two ways:
– Knowing the specified function that a product has been
designed to perform, tests can be conducted that
demonstrate each function is fully operational while at the
same time searching for errors in each function;
– Knowing the internal workings of a product, tests can be
conducted to ensure that "all gears mesh," that is, internal
operations are performed according to specifications and all
internal components have been adequately exercised.

30
Test Case
Design
"Bugs lurk in corners
and congregate at
boundaries ..."

Boris Beizer

OBJECTIVE to uncover errors

CRITERIA in a complete manner

CONSTRAINT with a minimum of effort and time

31
Exhaustive Testing

loop < 20 X

14
There are 10 possible paths! If we execute one test per millisecond,
it would take 3,170 years to test this program!!
32
Selective Testing
Selected path

loop < 20 X

33
Software Testing

white-box black-box
methods methods

Methods

Strategies

34
White-Box
Testing

... our goal is to ensure that all


statements and conditions have
been executed at least once ...

35
Why Cover?
logic errors and incorrect assumptions
are inversely proportional to a path's
execution probability

we often believe that a path is not


likely to be executed; in fact, reality is
often counter intuitive

typographical errors are random; it's


likely that untested paths will contain
some

36
Basis Path Testing
First, we compute the cyclomatic
complexity:

number of simple decisions + 1

or

number of enclosed areas + 1

In this case, V(G) = 4

37
Basis Path
Testing
1
Next, we derive the
independent paths:

2 Since V(G) = 4,
there are four paths
3 Path 1: 1,2,3,6,7,8
4
5 6 Path 2: 1,2,3,5,7,8
Path 3: 1,2,4,7,8
Path 4: 1,2,4,7,2,4,...7,8
Finally, we derive test
7 cases to exercise these
paths.
8

38
Control Structure Testing
• Condition testing — a test case design method
that exercises the logical conditions contained
in a program module
• Data flow testing — selects test paths of a
program according to the locations of
definitions and uses of variables in the
program

39
Loop Testing

Simple
loop
Nested
Loops
Concatenated
Loops Unstructured
Loops
40
Loop Testing: Simple Loops
Minimum conditions—Simple Loops
1. skip the loop entirely
2. only one pass through the loop
3. two passes through the loop
4. m passes through the loop m < n
5. (n-1), n, and (n+1) passes through
the loop
where n is the maximum number
of allowable passes

41
Loop Testing: Nested Loops
Nested Loops
Start at the innermost loop. Set all outer loops to their
minimum iteration parameter values.
Test the min+1, typical, max-1 and max for the
innermost loop, while holding the outer loops at their
minimum values.
Move out one loop and set it up as in step 2, holding all
other loops at typical values. Continue this step until
the outermost loop has been tested.
Concatenated Loops
If the loops are independent of one another
then treat each as a simple loop
else* treat as nested loops
endif*
for example, the final loop counter value of loop 1 is
used to initialize loop 2.
42
Black-Box Testing
requirements

output

input events

43
Black-Box Testing
• How is functional validity tested?
• How is system behavior and performance tested?
• What classes of input will make good test cases?
• Is the system particularly sensitive to certain input values?
• How are the boundaries of a data class isolated?
• What data rates and data volume can the system tolerate?
• What effect will specific combinations of data have on system
operation?

44
Graph-Based Methods
To understand the
objects that are
modeled in software
and the relationships
that connect these
objects
In this context, we consider
the term “objects” in the
broadest possible context. It
encompasses data objects,
traditional components
(modules), and
object-oriented elements of
computer software.

45
Equivalence Partitioning

user output FK
queries formats input
mouse
picks data
prompts

46
Sample Equivalence Classes
Valid data
user supplied commands
responses to system prompts
file names
computational data
physical parameters
bounding values
initiation values
output data formatting
responses to error messages
graphical data (e.g., mouse picks)
Invalid data
data outside bounds of the program
physically impossible data
proper value supplied in wrong place
47
Boundary Value Analysis

user output FK
queries formats input
mouse
picks data
prompts

output
input domain domain
48
Comparison Testing
• Used only in situations in which the reliability of
software is absolutely critical (e.g., human-rated
systems)
– Separate software engineering teams develop
independent versions of an application using the
same specification
– Each version can be tested with the same test data to
ensure that all provide identical output
– Then all versions are executed in parallel with
real-time comparison of results to ensure consistency

49
Orthogonal Array Testing
• Used when the number of input parameters is small
and the values that each of the parameters may take
are clearly bounded

50
Reengineering

Business
processes

IT
systems Software
Reengineering
applications

51
Business Process Reengineering
• Business definition. Business goals are identified within the context of four key
drivers: cost reduction, time reduction, quality improvement, and personnel
development and empowerment.
• Process identification. Processes that are critical to achieving the goals defined
in the business definition are identified.
• Process evaluation. The existing process is thoroughly analyzed and measured.
• Process specification and design. Based on information obtained during the
first three BPR activities, use-cases are prepared for each process that is to be
redesigned.
• Prototyping. A redesigned business process must be prototyped before it is
fully integrated into the business.
• Refinement and instantiation. Based on feedback from the prototype, the
business process is refined and then instantiated within a business system.

52
Business Process Reengineering

53
BPR Principles
• Organize around outcomes, not tasks.
• Have those who use the output of the process perform the process.
• Incorporate information processing work into the real work that
produces the raw information.
• Treat geographically dispersed resources as though they were
centralized.
• Link parallel activities instead of integrated their results. When
different
• Put the decision point where the work is performed, and build
control into the process.
• Capture data once, at its source.

54
Software Reengineering
Forward inventory
engineering analysis

Data document
restructuring restructuring

code reverse
restructuring engineering

55
Inventory Analysis
• build a table that contains all applications
• establish a list of criteria, e.g.,
– name of the application
– year it was originally created
– number of substantive changes made to it
– total effort applied to make these changes
– date of last substantive change
– effort applied to make the last change
– system(s) in which it resides
– applications to which it interfaces, ...
• analyze and prioritize to select candidates for
reengineering

56
Document Restructuring
• Weak documentation is the trademark of many legacy systems.
• But what do we do about it? What are our options?
• Options …
– Creating documentation is far too time consuming. If the system works, we’ll
live with what we have. In some cases, this is the correct approach.
– Documentation must be updated, but we have limited resources. We’ll use a
“document when touched” approach. It may not be necessary to fully redocument
an application.
– The system is business critical and must be fully redocumented. Even in this case,
an intelligent approach is to pare documentation to an essential minimum.

57
Reverse Engineering

58
Code Restructuring
• Source code is analyzed using a restructuring tool.
• Poorly design code segments are redesigned
• Violations of structured programming constructs are
noted and code is then restructured (this can be done
automatically)
• The resultant restructured code is reviewed and tested
to ensure that no anomalies have been introduced
• Internal code documentation is updated.

59
Data Restructuring
• Unlike code restructuring, which occurs at a relatively low level of
abstraction, data structuring is a full-scale reengineering activity
• In most cases, data restructuring begins with a reverse engineering activity.
– Current data architecture is dissected and necessary data models are defined
(Chapter 9).
– Data objects and attributes are identified, and existing data structures are reviewed
for quality.
– When data structure is weak (e.g., flat files are currently implemented, when a
relational approach would greatly simplify processing), the data are reengineered.
• Because data architecture has a strong influence on program architecture and
the algorithms that populate it, changes to the data will invariably result in
either architectural or code-level changes.

60
Forward Engineering
1. The cost to maintain one line of source code may be 20 to 40 times the cost of
initial development of that line.
2. Redesign of the software architecture (program and/or data structure), using
modern design concepts, can greatly facilitate future maintenance.
3. Because a prototype of the software already exists, development productivity
should be much higher than average.
4. The user now has experience with the software. Therefore, new requirements
and the direction of change can be ascertained with greater ease.
5. CASE tools for reengineering will automate some parts of the job.
6. A complete software configuration (documents, programs and data) will exist
upon completion of preventive maintenance.

61
Economics of Reengineering-I
• A cost/benefit analysis model for reengineering has
been proposed by Sneed [Sne95]. Nine parameters are
defined:
• P1 = current annual maintenance cost for an application.
• P2 = current annual operation cost for an application.
• P3 = current annual business value of an application.
• P4 = predicted annual maintenance cost after reengineering.
• P5 = predicted annual operations cost after reengineering.
• P6 = predicted annual business value after reengineering.
• P7 = estimated reengineering costs.
• P8 = estimated reengineering calendar time.
• P9 = reengineering risk factor (P9 = 1.0 is nominal).
• L = expected life of the system.

62
Economics of Reengineering-II
• The cost associated with continuing maintenance of a candidate application
(i.e., reengineering is not performed) can be defined as
Cmaint = [P3 - (P1 + P2)] x L
• The costs associated with reengineering are defined using the following
relationship:
Creeng = [P6 - (P4 + P5) x (L - P8) - (P7 x P9)] `
• Using the costs presented in equations above, the overall benefit of
reengineering can be computed as
cost benefit = Creeng - Cmaint

63