Subject: Single Line Key Diagram of 220/132 Grid Station D.I.Khan New..
Enclosed please find herewith "final single line key diagram" of the subject Grid Station. Drawing has
. been finalized as per information provided/verified vide above referred letter. Kindly ensure that the
designated operational code numbers have been properly marked on the respective equipment in Control
room, Relay room and Switch yard. Any discrepancy observed in final drawing, be conveyed to the •
undersigned at the earliest.
PURPOSE: Allocation of code No. to the remote ends of line bays No.2&3 (E5Q1, E3Q1) as
D1K-1 132 kV D.I. Khan. & KCH-2 Kulachi respectively.
NOTE This verified updated drawing of the station(s) will be implemented after completion
of modification work during the shutdown at the station(s). The ISOLATION and
RESTORATION switching for the shutdown will be carried out according to
EXISTING and VERIFIED UPDATED NEW drawing respectively.
CCVT-
CCVT-
22E10
D1010
Di D2
/02011
/01011 D2Q10
D1Q10 X D2Q1
X D1 Q1
32400.12001620.1
24001 200:600/
.
1/D1012
CVT CVT 6A i /02012
D1Q31 /D2031
3 24001220:500M
a 2400:1200:0001l
220 KV X Dl Q3 X D2Q3
2400:1204 600/1
3 2400:1200/60211
(1)1Q32 /1)2C132
' CVT-6
CVTA.
D1021 /02021
2420:1200:60011
a 2100:1200'60011
X D2Q2
X D102
/02022
01022
II 1Q20 02020
T-1 2000'1200/1 -F-2
220
250 MVA
01200" T-2 250 MVA
220/132 KV
220/132 KV
SHANDONG DACHI
5410 P.13
SHANDONG DACHI
SPAS P.T CHINA
0140 C CHINA
SIAS C.T TAPS-27
1000'1300:40141 TAPS-27
I600.400'400M
E801
E4Q1
E7 ES E9 El0
El E2 E3 E4 L E5 E6
/ E6Q11 0
/F2 /
o a 1000000:40011
in
XE6Q1
44 N V 1622.0001400/1
/g
a g . u, -
/ E6012 LU
II ,
E9Q1 E10Q1
xE3Q1 xE5Q1 E7Q1
E101 E2Q1 1600,500:400/1 600,800:400/1
3 1600:S0,400/1 160148001400/1
200100/1 43 1602:800A0011 91600100:400/1
E9Q10 _El 0(310
/ E2Q10 E3010 /E5Q10 III 69610 EIDE1
1026,-L0 III E7519 E7C11°
loSIL
I) V26.9L ii
.-
0 — I '
PT-2 V PZUIA
I - - -FUTURE FUtURE
\._.) DIK-1 KCH-2 PZU-3
T-3 D.I.KHAN KULACHI PEZU
PEZU
10/13 MVA
132/11.5 KV
DRAWN BY. NATIONAL POWER CONTROL CENTRE (NTDC)
PEL
A.D.M
TAPS-23 220/132 KV GRID STATION
CHECKED BY.
A.D (Drawing)
APROVED BY.
DY.DIR (RCCN)
D.I.KflAN NEW
APROVED BY.
DATE:26.07.2019 NTDC REV: 03
Addl:C.E(RCCN)