You are on page 1of 206
INDUSTRIAL WASTEWATER PERMIT APPLICATION (TPDES/TLAP) TO THE ‘TEXAS COMMISSION ON ENVIRONMENTAL QUALITY FOR GAPPED BASS LLC Original Submittal: July 2022 Updated Submital: August 2022 Prepared for: Gapped Bass LLC 130 Walker-Watson Road Bastrop, Texas 78602 Prepared By: CONSULTING 100 Nautical Circle Round Rock, Texas 78681 Gapped Bass LLC Industrial Wastewater Permit Application July 2022 INTRODUCTION Gapped Bass LLC operates the FM 1209 Wastewater Treatment Facility located at 130 Walker-Watson Road in Bastrop, Bastrop County, Texas 78602. The site will treat and discharge wastewater from industrial operations related to tunnel boring equipment manufacturing/testing, an on-site bistro, and sanitary wastewater related to restroom/ washroom facilities and on-site employee housing. This industrial wastewater permit application is being submitted to the Texas Commission on Environmental Quality (TCEQ) to obtain both a Texas Pollutant Discharge Elimination System (TPDES) Permit and Texas Land Application Permit (TLAP) in three (3) phases. Phase 1 will authorize the land application or discharge to the Colorado River of up to 22,500 gallons pet day (GPD) of treated industrial and domestic wastewater. Phase 2 and 3 will each authorize an additional optional 60,000 (GPD) of water for discharge to the Colorado River. One G) original and two (2) copies of this completed application, including the Core Dal Form, Administrative Report, Technical Report, and all requited worksheets, is being submitted to the TCEQ, Water Quality Division, in accordance with 30 TAC §305.48. Additionally, an electronic copy of this application is being submitted via the TCEQ's file transfer protocol server. Gapped Bass LLC Industrial Wastewater Permit Application duly 2022 ATTACHMENT 1: CORE DATA FORM. TCEQ Core Data Form ese Fer dete instrctons earn xoebonct his fom plas rex he Cor Ota For stuctns ra 512238578 SECTION I: General Information Reason for Submision (Yas hale pene Geib pice raed) [New Poi Reisraton or Aorzatn (Cae Data Frm sous be ebited we the pro apaton) TH Renewal (Care Ota For out be subtedwiherereval tes) | Cer 7 asione Reference Number S06) raw tian | 3. Reale Eni Reference Nun wed] | cN Cima | RN SECTION Ii: Customer Information [A.General Customer information | 5. Effective Date for Customer Information Updates (me/dclyyyy) [Bnew cme TivpisteteCstneiomaton —___] Change Regd Ely Ooretip | Dichange in Legal Name (Verfisble with the Texas Sacretary of State or Texas Comptroter of Public Accounts) The Customer Name submited here may be updated automaticaly based on whats eurent and active with the Texas Secretary of State (SOS) or Texas Comptroller of Public Accounts (CPA). Catone age Nane fan rl itd ane fat Oe er) new Cus lea uae Gapped Bass LLC 7. TKSOSICPA Filg Number | 0 TXSbteTax WD wraam) 3 Federal Tox O waviey | 10. OUNS Number jaan 804016572 32078692897 86-3213663, 11.Typo of Customer: | 62 Coporaton Dini, Parnership: Gani} Unies Goverment Dey cary CFeariCiswe Core | CsdlePronrtostio | Cloner: “2, Number of Employees ‘Independently Owned and Operated? Goze Be2i-100 Cror.200 Chaststo Chsotandhigher | Daves ‘No “4 Customer Role (Propcse ex Aca) roles oto Roptd Et sed cn Ps frm Pease cack ne fe ong Bower operator Towrer’ Operator loscupatoraicensee Ci) Responsible Paty C]VoluntaryCrarup Appicant Clothier 130 Walker-Watson Road 45.Maling Address: iy _| Bastrop sate [Tx [ar [78602 zee4 [3170 16. Country Wang information fuse US) AEWA Address oases) TH. Telephone Nambor 78, Evension oF Code 7a Fx Number (appleabe) (737 ) 252.9559 (ieee SECTION II: Regulated Entity Information [21 General Regulated Entity Inormaton (fw Reguted Ets sled Below ts fom sould be accomparied bya peat applicator) | EaNewRequoted Enity (DUpdat to Regulated Enty Maro Unda to Regulated Ent ration The Regulated Entty Name submitted may be updated in order to meet TCEQ Agency Data Standards (removal | of organizational endings such as inc, LP, or LLC). | 22 Regulated Entity Name (tre ob wr pl cn sings) | FM 1209 Wastewater Treatment Facility | | ‘reEa-10400 (0221) Page tot? 23, Street Address of | 130 Walker-Watson Road the Regulsted Entity: Same cty | Bastrop [sate [tx [ze | 78602 z+ [3170 7 County er Phyl location Osscripion in stat adress is proved 25, Description to | Physical Location: He Nearest Gy Sat Nearest 2P Code Bastrop [x 78602 2. Latitude in Desa: 2 Longe (W) Indesit Sa Ta Ta Sars = a 30 9 0927 7 24 1807 72 Pinar SH Code wep) 98 Secon SIC Code ms PNY AICS Code 3 Second HAE Code 1622 3499) 237990 332999 "B.What sth Primary Business of sen? (Dera asst a Sa RAGS econ) ‘Wastewater treatment for tunnel boring equipment manufacturing and testing and domestic wastewater. 130 Waker Watson Re tt “9 |= see ae | ‘Address: city | Bastrop | state | ™ | a | racer [area] sir 35. EMail Address: Tegal@benngcompany com 136. Telaphone Number ‘37. Extension or Code {3 Fax Number (oppicabie) (737 2529559 ee 138, TCE Programs and ID Numbers Check 3 Proyans ard wa in ta paitegsatonnanbes at willbe ace by tho unde submited on hs term See tha Coe Data Fern insstns te atonal gudance. Coan sety Cosas Cards Rar Crisis tern Ar | Uinta Pazar Waste iret Sia Wate | Tew Soute Revew Ae | BOSSE Ciarceun Serge Tax _| Cavs Cisne isms Deva Ges Thvetor | Tiverton Gearon | Cl Waie Water TivesavateApianire | CWater Pits Donen SECTION IV: Preparer Information Mane: | Raiiv Patel, PE 44.Tite: | Principal Engineer 42.Telephone Number 42 Et/Gode 44 Fax Number EE Ma Ades | (512) 596-7929 (512)900.1911 _ | rajiv@greenthinkconsulting com SECTION V: Authorized Signature 46. By my signatre below, l ceri, to thebestof my knowledge, Sut the information proved inthis form is tue and complete, abd tat have ‘Mesure autor wo subya is form on behalf fe eatiy specified in Section Hi, Field 6 andra reuied forthe updates to the ID aubers ‘enti a ld 39 area epee! mame oueeaey = =] Ta ay [ eta asl cna Tow : saree =. ee 130 Walker-Watson Road city [Bastrop [state [Tx [ze [78602 [zea [3170 Enter Physical Location Description ino see address is provided. 25.Deseripton to Physial Location i. Nearest Cy Sate Nearest P Code Bastrop TX, [73602 7. Late Ain Decimak | 28 Longiade (hn Deca epee ngs sents apes ine secs 30 09 09.27 97 m4 1807 22, rimary SIC Code ses) 30.Secondary SIC Code ears) {LMA MACS Gode 32 Seconda WHICS Code 1622 [3499 237990 332999) ‘31 What isthe Primary Business of Wis erty? (orcteae da Se ANS don] ‘Wastewater treatment for tunnel boring equipment manufacturing and testing and domestic wastewater. 130 Walker Wateon Road 24. taliog Address | ote [ee] oa) we lan] on 35.Eqal Address: | Jegal@bornecompany com 36, Telephone Number 37. Extension or Code 38. Fax Number (if applicable) | (731) 2529589 I (eRe 38. TCEG Programs and 0 Numbers Check a regan a rene perisegston numbers hat wil be alee by fuels subite an tis ier See the Cee Osa For nsucns ean gudsnce Coen sey Tres Cesta | Chester ray tr | CT rai Wat ep Wi | Cites Ses even | ORS Cian Sorgen CORN Cis CiSeniier Orava Hie Ciueiar Ciera Gesap | Saas ae Cw iicae | Waar Coir SECTION 1V: Preparer Information Nine: | Raiiv Patel, PE 41.Tie: | Principal Engineer o.Toashins Noise is Bobs = "OL RSLNinae 2 an ea Adie al (512) 596-7929 (512)900-1911 | rajiv@greenthinkconsulting com SECTION V: Authorized Signature ‘46. By ny signature below ceri, to thebestof my knowledge, that he information provided thi form i te and complete, and that Thane ‘sgnanr author to submits frm on behalf ofthe enty apie in Section I, Fed 6 anor a teqred forthe update 1D mbes ‘eid ntl. Conca: | Gappaibas Lo ‘eo [Ch Preval Oar ] Name a Pri | Ann Prakash Phone: _| (737)250-9550 ‘Signature: WL Powe: Trai | ‘ToEO-t0400 (2721) Gapped Bass LLC Industrial Wastewater Permit Application uly 2022 ATTACHMENT 2: ADMINISTRATIVE REPORT. TEXAS COMMISSION ON ENVIRONMENTAL QUALITY ‘TCEQ INDUSTRIAL WASTEWATER PERMIT APPLICATION INDUSTRIAL ADMINISTRATIVE REPORT 1.0 “This report is required for all applications for TPDES permits and TLAPs. Contact the Applications Review and Processing Team at 512-239-4671 with any questions about completing this report a. Complete each field withthe requested information, lf applicable. ‘Applicant Name: Gapped Bass LLC EPAID No: TXON/A Permit No: WOOOON/A Expiration Date: N/A bb. Check the box next to the appropriate authorization type. Bi industrial Wastewater (wastewater and stormwater) i industrial Stormwater (stormwater only) (c. Check the box next to the appropriate facility status. active GBiinactive 4. Check the box next tothe appropriate permit type Hi TPpES Permit BT? e. Check the box next to the appropriate application type, Bixew Eienewal with changes Bi Renewal without changes Ei Major amendment with renewal [Major amendment without renewal [Minor amendment without renewal {Bi Minor modification without renewal £, applying for an amendment or modification, describe the request: N/A, & Application Fee Tas Seg] Sa eee Eee ec * | eee | eee en oe ne asx | 2 Cegoria effluent ldelines 3350) Bsss0 5 15 Goer ronssoof7n | Ls Bas Biss Minor facity subject 10 BPA | Categoria ever gutehnes | 51,250 sia! 5 (GOCE parts 400471) i Bnzs0 Baas Bsiso Najor fey NAY Beas Baas Biss0 "All facilities are designated as minors until formally classified as a major by EPA. “TCEO-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 1 of 19 h. Payment Information Mailed Check or money order No: CIGRTSERIEETER) © Check or money order amt. ClERTSEieEES Named printed on check or money ordei Epay Voucher number: SSSTABBRGISSSI47 Copy of voucher attachment: AiGSCHSeNN a. Customer Number, if applicant is an existing customer: CNTBD. Note: Locate the customer number using the TCEO's Central Registry Customer Search’ b. Legal name of the entity (applicant) applying for this permit: Gapped Bass LLC Note: The owner of the facility must apply for the permit. The legal name must be spelled exactly as filed with the TX SOS, Texas Comptroller of Public Accounts, County, or in the legal documents forming the entity Name and title of the person signing the application. (Note: The person must be an executive official that meets signatory requirements in 30 TAC § 305.44) Mr. Eos. First/Last Name: Arun Prakash ‘Title: Chief Financial Officer Credential: CREKTOGHRGERESE 4, Will the applicant have overall financial responsibilty or the facility? Hives EiNo Note: The entity with overall financial responsibility f6F the facility must apply asa co-applicant, if not the facility owner Bi Check this box if there is no co-applicant otherwise, complete the below questions. 4. Legal name of the entity (co-appiéait) applying for this perm: CHER TSEREETER Note: The legal name must be spelled exactly as filed with the TX SOS, Texas Comptroller of Public ‘Accounts, County, or inthe legal documents forming the entity ». Customer Number (if applicant is an existing customer): CNCHEESTENTER TER Note: Locate the customer number using the TCEQ's Central Registry Customer Search. Name and title of the person signing the application. (Note: The person must be an executive offical that meets signatory requirements in 30 TAC § 305.44) Mr. GiMs. First/Last Name: CHERTSEREER TERE Tite: CRORE Credential: CHGTOTERTSE TERE, 4. Will the co-applicant have overall financial responsibility for the facihty? Dives EIN Note: The entity with overall financial responsibility for the facility must apply as a co-applicant, if not the facility owner. * hitps://seww/ 5.tcen.Lexas.gov/erpub /index.cfmi?fuseaction=cust,CustSeatch ‘Fer: 10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 2 0f 19 Complete one Core Data Form (TCEQ Form 10400) for each customer (applicant and co- applicant(s)) and inchude as an attachment. If the customer type selected on the Core Data Form is Individual, complete Attachment | of the Administrative Report, Attachment: CORE DATA FORM Provide names of two individuals who can be contact for additional information about this application. Indicate if the individual can be contact about administrative or technical information, or both, a. HAdministratve Contact {Technical Contact EMs, GMs. Pull Name (First and Last): Hunter Brauer Title: Lead Civil Engineer Credential: BE, (Organization Name: THC - The Boring Company, Mailing Address: 130 Walker-Watson Road, ity: Bastrop State: Texas Zip Code: 78602 Phone No: 737-252-0559 Fax No: N/A Email: hunter@boringcompany.com b, BAdministrative Contact {fH Technical Contact, ims, EEMs, Full Name First and Last): Rajiv Patel ‘Title: Principal Engineer Credential BE Organization Name: Greenthink Consulting, LLC Mailing Address: 100 Nautical Circle City: Round Rock State: Texas Zip Code: 78681. Phone No: 512:596-7929 Fax No: 512:90041911 Email: rlu@ereenthinkconsulung.com Attachment: CGET@enterteRE Provide two names of individuals that can be contacted throughout the permit term, a. Bir, EJMs. Full Name (First and Last): Hunter Brauer Title: Lead Civil Engineer’) Credential BE ‘Organization Name: TRC= The Boring Company ‘Mailing Address: 130 Walker-Watson Road City: Bastrop ‘State: Texas: Zip Code: 78602 Phone No: 737-252-9559 Fax No: N/A small: hunter®boringcompany.com b, BiMr. EIMs, Full Name (First and Last: Rajiv Patel Title: Principal Engineer Credential: BE. Organization Name: Greenthink Consulting, LLC Mailing Address: 100 Nautical Circle City: Round Rock State: Texas Zip Code: 78681 Phone No: 512-596-7929 Fax No: 512-900-1911 Email: aiiv@areenthinkconsulting.com Attachment: CHERTSentertext TCEQ10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 3 of 19 The permittee is responsible for paying the annual fee. The annual fee wil be assessed for permits in effect on September 1 of each year. The TCEQ will send abil to the address provided inthis section. ‘The permittee is responsible for terminating the permit when it's no longer needed (form TCEO- 20028). Provide the complete mailing address where the annual fee invoice should be mailed and the name and phone number of the permittees representative responsible for payment of the invoice. HEM. ELMs, Full Name (First and Last: Arun Prakash ‘Tile: Chief Eancial Officer Credential: CHEKITEMIePTERE Organization Name: TEC = The Boring Company Mailing Address: 130 Walker-Watson Road State: Texas Zip Code: 78602 Phone No: Fax No: N/A Email: invoices@boringcompany.com Provide the name and mailing address of the person delegated to receive and submit DMRs or MERs. Note: DMR data must be submitted through the NetDMR system. An electronic reporting account can be established once the facility has obtained the permit number. Bir. E1Ms. Full Name (First and Last: Hunter Brauer Title: Lead Civil Engineer Credential: LE, Organization Name: TBC - The Boring Company Mailing Address: 130 Walker-Watson Road City: Bastrop State: Texas ‘ip Code: 78602 Phone No: 737.252.9559 Fax No: N/A, Email: hunter@boringcompany.com, 4, Individual Publishing the Notices Bir. ELMs, Full Name (First and Last: Rajiv Patel Tile: Principal Engineer Credential: BE, Organization Name: Greenthink Consulting Mailing Address: 100 Nautical Circle City: Round Rock State: Texas Zip Code: 78681 Phone No: 512-596-7929 Fax No: 512-900-1911 Email: rajiv@greenthinkconsulting.com b. Method for Receiving Notice of Receipt and Intent to Obtain a Water Quality Permit Package (only for NORI, NAPD will be sent via regular mail) E-mail: rajiv@greenthinkconsulting,com Di Fax: Click'to enter text, i Regular Mail (USPS) Mailing Address: CHERTOIERTCENGR, City; CHERTORATER TE State: CHCKTOTNTEFTER! Zip Code: CHEKTOTENTERTEN CE0-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 40f 19 Contact in the Notice LEM. BMs Full Name Girst and Last): Ashlev Steinberg ‘Title: Head of Legal Affairs Credential: CIERIROTEnRE TE Organization Name: TRC - The Boring Company Phone No: 725-209-2486 Fax No: N/A Email: legal@boringcompany.com 4d. Public Viewing Location Information Note: If the facility or outfall is located in more than one county, provide a public viewing place for each county. Public building name: Bastrop Public Library Location within the building: PublicNotices Physical Address of Building: 1100 Church Street City: Bastrop County: Bastrop ‘Bilingual Notice Requirements ‘This information is required for new, major amendment, and renewal applications. It is not required for minor amendment or minor modification applications. “This section of the application is only used to determine if alternative language notices will be needed, Complete instructions on publishing the alternative language notices will be in your public notice package. Please call the bilingual/ESL coordinator at the nearest elementary anid middle schools and obtain the following information to determine whether an alternative language notices are required. 1, Isa bilingual education program required by the Texas Education Code at the elementary or middle school nearest to the facility or proposed facility? [yes ENo E{N/A (tinor amendment or modification) If no, publication of an alternative language notice Is not required; skip to Item 8 (Regulated Entity and Permitted Site Information.) ‘Are the students who attend either the elementary school or the middle school enrolled in a bilingual education program at that school? B Yes E)No EIN/A Olinor aiendment or modification) 4, Do the students at these schools attend a bilingual education program at another locaton? ies Bi No EIN/A Qtinor amendment or modification) 4, Would the school be required to provide a bilingual education program, but the school has waived out of this requirement under 19 TAC §89.1205(8)? Elves Hi No [N/A (inor amendment or modification) 5. Ifthe answer is yes to question 1, 2,3, or 4, public notices in an alternative language are required, Which language is required by the biingval program? Spanish a. TCEQ issued Regulated Entity Number (RN), if available: RNTED Note: If your business site is part of a larger business site, a Regulated Entity Number (RN) may already be assigned for the larger site. Use the RN assigned for the larger site. Search the TCEQ's Central Registry to determine the RN or to see ifthe larger site may already be registered as @ Regulated Entity. Ifthe site is found, provide the assigned RN. | >. Name of project or site (the name known by the community where located): EM 1209 Wastewater ‘Treatment Facility TCEO-LOAL (04/15/203 industrial Wastewater Application Administrative Report Page 5 of 19 Is the location address of the facility in the existing permit the same? ives EINo BLN/A (new permi Note: If the facility is located in Bexar, Comal, Hays, Kinney, Medina, Travis, Uvalde, or Williamson County, additional information concerning protection of the Edwards Aquifer may be required. . Owner of treatment facility: Git. Gi Ms. Full Name (First and Last): or (Organization Name: Gapped Bass LLC Mailing Address: 15709 Impact Way, #200 City: Pflugerville State: Texas Zip Code: 78660 Phone No: 737:252:9559 Fax No: UGERSEHIGETE! emai legal@boringcompans.com Ownership of faci: EL Publ BPrvate Both O Feder f. Owner of land where treatment facility is or will be: Gapped Bass LLC EEMr. EIMs. Full Name (First and Last) ‘or Organization Name: Gapped Hass LLC ‘Mailing Address: 15709 Impact Way, #200 City: Pflugerville State: Texas Zip Code: 78650 Phone No: 737.252.9559 FaxNo:Glidetoententea: —_ Ematl:legal@lboringcompany.com Note: If not the same as the facility owner, attach a long-term Tease agreement in effect for at least six years (in some cases, a lease may not suffice - see instructions) Attachment: N/A Owner of effluent TLAP disposal site (if applicable Ganped Bass LLC [DMr. GMs. Full Name (First and Last cor Organization Name: Gapped Bass LLC Mailing Address: 15709 Impact Way, #200 City: Pflugerville State: Texas: Lip Code: 78660 Phone No: 737-252-9559 _ Fax No: lickstoententext; Email: legal@horingcompany.com Note: If not the same as the facility owner, attach a long-term lease agreement in effect for at least six years. Attachment: N/A hh. Owner of sewage sludge disposal site (if applicable): Eins. GMs. Full Name (Furst and Last): N/A or Organization Name: NA Malling Address: N/A, uty: ZA state: SZA Zip Code: NA Phone No: N/A —-FaxNo: N/A mail: N/A Note: If not the same as the facility owner, attach a long-term lease agreement in effect for at least six years, Attachment: N/A “TCEC-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 6 of 19| z Se ‘a. Is the facility located on or does the treated effluent cross Native American Land? ives HINo bb. Attach an original full size USGS Topographic Map (or an 8.5°x11" reproduced portion for renewal for amendrnent applications) with all required information. Check the box next to each item below to confirm it has been included on the map. Bone mile radius Bi Three-miles downstream information B Applicant's property boundaries Bi Treatment facility boundaries Bi Labeled point(s) of discharge Bi ightighted discharge routes) Bi effluent disposal site boundaries Au wastewater ponds Hi sewage shudge disposal site Hi New and future construction Attachment: ATTACHMENT 4: USGS MAPS Is the location of the sewage sludge disposal site in the existing permit accurate? iYes Bi No or New Permit If no, of a new application, provide an accurate location description: Sewage sludge is not disposed fon the site 4. Are the point(s) of discharge in the existing permit correct? ElYes Bi No or New Permit If no, or a new application, provide an accurate location description: Wastewater willbe land Spblfed for the Interim on land adjacent to the treatment equipment. Contingency flow and furure, final discharge will be routed northwest to the Colorado River across Gapped Bass LLC property and under EM 1209. ce. Are the discharge route(s) in the existing permit correct? Yes Bi No or New Permit no, or a new permit, provide an ateurate description of the discharge route: Wastewater will be Tand applied for the interim on landadjacent to the treatment equipment. Contingency flow and future final discharge will be routed northwest tot de as property and under EM.1209. £ City nearest the outfall(s) Bastrop ‘& County in which the outfals(s) is/are located: Bastrop b. Is or will the treated wastewater discharge to a city, county, or state highway right-of-way, or a flood control district drainage ditch? Lives BiNo I yes, indicate by a check mark if: E] Authorization granted Ej Authorization pending For new and amendment applications, attach copies of letters that show proof of contact and provide the approval letter upon receipt. Attachment: Click fol e@ntGe text, For all applications involving an average daily discharge of 5 MGD or more, provide the names of iI counties located within 100 statute miles downstream of the point(s) of discharge: Cliek to ent@e Text {. For TLAPs, is the location of the effluent disposal site in the existing permit accurate? ‘TCEO-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 7 of 19 Ei ves HH No or New Permit Ifno, or a new application, provide an accurate location description: The spray field is located northe tment Is locat id 126, 97.4026) J. City nearest the disposal site: Bastrop k. County in which the disposal site is located: Bastron_ 1 Disposal Site Latitude: 30.154426 Longitude: .97.402672 im, For TLAPs, describe how effluent is/willbe routed from the treatment facility to the disposal site: rh. For TLAPs, identify the nearest watercourse to the disposal site to which rainfall runoff might flow if not contained: Colorado River ‘a. Did any person formerly employed by the TCEQ represent your company and get paid for service regarding this application? ives BNo If yes, list each person: CCE RTECS b. Do you owe any fees to the TCEQ? Hives HINo I yes, provide the account no.: CRS ERIEEtEME and total amount due: CHEKTO RAREST Do you owe any penalties to the TCEQ? Bes BNo If yes, provide the enforcement order no: GHGRTOEAtGE TEM! and amount due: CHCREGSHTETTERE Permit No: WO000TRD Applicant Name: Gapped Bass LLC Certification: I, Anan Prakash, certify under penalty of law that this document and all attachments ‘were prepared under my direction or supervision in accordance with a system designed to assure that ‘qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, tue, accurate, and Complete. 1 am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. | further certify that Iam authorized under 30 Texas Administrative Code §305.44 to sign and submit this document and can provide documentation in proof of such authorization upon request. signatory name (typed or printed): Arun Prakash Signatory ttle: Chief Financial Officer Signature: Date: (Use blue inky ‘subseribed and Sworn to before me by the said con this _ Ss cay, 20 “TCEO-10411 (04/15/2022) industrial Wastewater Application Administrative Report Page 8 of 19 ‘My commission expires on the _day of poe Notary Public {seat} County, Texas Note: if co-applicants are necessary, each entity must submit an original, separate signature page. “TCEQ-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 9 of 19 C1 Yes No or New Permit If no, or a new application, provide an accurate location description: The spray field is located, northeast of the treatment plant and {s located around 30154426, -97.402672 J. City nearest the disposal site: Bastrop County in which the disposal site is located: Bastrop, L._Disposal site Latitude: 30.154426 Longitude: 97.402672 1m. For TLAPs, describe how effluent is/will be routed from the treatment facility to the disposal site: ‘Treatment facility is ph n. For TLAPs, identify the nearest watercourse to the disposal site to which rainfall runoff might flow if not contained: Colorado River ‘Item 12; MISCELLANEOUS INFORMATION (Instructions, Page 29) 5 ‘a, Did any person formerly employed by the TCEQ represent your company and get paid for service regarding this application? Yes BNo yes, list each person: Click to enter text. b. Do you owe any fees to the TCEQ? Yes BNo I yes, provide the account no. Click to enter text, and total amount due: Click to enter text, ¢. Do you owe any penalties to the TCEQ? Yes & No If yes, provide the enforcement order no. Click enter Item 13, SIGNATURE PAGE (Iiistructions, Pages 29-30) Permit No: WOO00TBD Applicant Name: Gapped Bass LLC Certification: I, Arun Prakash, certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that Qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted i, to the best of my laowledge and belief, rue, accurate, and complete, lam aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. J further certify that Iam authorized under 30 Texas Administrative Code §305.44 to sign and submit this document and can provide documentation in proof of such authorization upon request. Signatory name (typed or printed): Arun Prakash Signatory ttle: Chief Financial Officer 1d amount due: Click to enter text, simature: MACE —— ate __afy 2 (Use blue ink) Subscribed and Sworn to before me by the said_Atuy PRmenert on this suey se day ot 1 20.a% ‘TCEO- 10411 (04/15/2022) Industeal Wastewater Application Administrative Report Page 8 of 19 My commission expires on the___Auaust day of__llo%® 20.45. as fettuie Yreeti Notary Public (sean) “Beavis County, Texas Note: If co-applicants are necessary, each entity must submit an original, separate signature page. ‘TCEQ-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 9 of 19) INDUSTRIAL ADMINISTRATIVE REPORT 1.1 ‘The following information is required for new and amendment applications. ET AOE ‘a. Attach a landowner map or drawing, with scale, as applicable. Check the box next to each iter to confirm it has been provided. The applicant's property boundaries. i The facility ite boundaries within the applicant's property boundaries. Bi The distance the buffer zone falls into adjacent properties and the property boundaries of the landowners located within the buffer zone. Bi The property boundaries ofall landowners surrounding the applicant's property. (Note: if the pplication 1s a major amendment for lignite mine, the map must include the property Doundaries ofall landowners adjacent to the new facility (ponds) Hi the points of discharge and highlighted discharge route(s clearly shown for one mile downstream. i The property boundaries ofthe landowners located on both sides ofthe discharge route for one full stream mile downstream of the point of discharge. {The property boundaries ofthe landowners along the watercourse for a one-half mile radius Irom the point of discharge ifthe point of discharge is into alake, bay, estuary, or affected by tides Ey The boundaries ofthe effluent disposal site (e.g. rigation area or subsurface drainfield site) dnd all evaporation /holding ponds within the applicant's property. Hi The property boundaries of all landowners surrounding the applicant's property boundaries where the effluent disposal site is locate. [i The boundaries ofthe sludge land application site (or land application of sewage sludge for Donehcial use) and the property boundaries of landowners within one-quarter mile ofthe peniicant’s property boundaries where the sewage sludge land application site is located. the property boundaries of landowners within one-half mile inal rections from the [pplicant’s property boundaries where the sewage sludge disposal ste (eg. shudge surface disposal site or sludge monofil) is locate. Attachment: ATTACHMENT 5: AFFECTED LANDOWNER INFORMATION b. Check the box next to the format of the landowners list: EiReadable/Wrteable CD HI Four sets of labels “Attachment: ATTACHMENT 5: AFFECTED LANDOWNER INFORMATION 4d. Provide the source of the landowmers’ names and mailing addresses: Bastrop Central Appraisal District ce, Asrequired by Texas Water Code § 5.115, is any permanent school fund land affected by this application? Bives No wide the location and foreseeable impacts and effects this application has on the lands: TCEO-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 10 of 19 ——S| Provide original ground level photographs. Check the box next to each of the following items {0 indicate tis included Bf Atleast one original photograph ofthe new or expanded treatment unit location. Bt least two photographs of the existing/proposed point of discharge and as much area downstream ‘duoto 1) and upstream (photo 2) as can be captured, I the discharge isto an open water body (¢f {hove 1) Aine polnt of discharge should be tn the right or left edge of each photograph showing the rae edter and with as much area on each respective side of the discharge as can be captured. HAC leat one photograph ofthe exsting/proposed effluent disposal site. BEA plot plan or map showing the location and direction ofeach photosrap “Attachment: ATTACHMENT 6: PHOTOGRAPHS ‘TCEO-10411 (04/15/2022) Industial Wastewater Application Administrative Report Page 11 0f 19 TEXAS COMMISSION ON ENVIRONMENTAL QUALITY: SUPPLEMENTAL PERMIT INFORMATION FORM (SPIE) FOR AGENCIES REVIEWING INDUSTRIAL ‘TPDES WASTEWATER PERMIT APPLICATIONS: ‘TCEQ USE ONLY: Application type: __Renewal__Major Amendment __Minor Amendment _New County: Segment Number: Admin Complete Date: ‘Agency Receiving SPIF: ___ Texas Historical Commission ____.US. Fish and Wildlife “Texas Parks and Wildlife Department ____US. Army Corps of Engineers ‘This form apnlies to TPDES permit applications only, (Instructions, Page 34), “The SPIF must be completed as a separate document. The TCEQ will mail a copy of the SPIF to each ‘agency as required by the TCEQ agreement with EPA. if any of the items are not completely addressed oe further Information is needed, you will be contacted to provide the information before the permit is issued. Each item must be completely addressed. Do not refer to a response of any item in the permit application form. Each attachment must be provided with this form separately from the administrative report of the application. The application Fill not be declared administratively complete without this form being completed in its entirety induding all attachments. “The following applies to all applications: 1, Permittee Name: Gapped Bass LLG 2, Permit No: WQOOOTBD EPA ID No.: TXOTRD 43, Address of the project (location description that includes street/highway, city/vicinity, and county): (130 Walker-Watson Road, Hastrop, Bastrop County, Texas 78602 4. Provide the name, address, phone and fax number, and email address of an individual that can be contacted to answer specific questions about the property. Pull Name (First and Last): Hunter Brawer Organization Name: TBC = The Boring Company Mailing Address: 130 Walker-Watson Road City: Bastrop ‘State: Texas: ‘Zip Code: 78602, Phone No: 737-252-0359 Fax No: N/A. Email: hunter@boringcompany.com. 5. List the county in which the facility 1s located Bastrop 6. If the property is publicly owned and the owner is different than the permittee/applicant, please list the owner of the property: The property is owned by Gapped Bass LLC TCEO-10411 (04/15/2022) industnal Wastewater Application Administrative Report Page 12 of 19 7. Provide a description of the effluent discharge route. The discharge route must follow the flow of elfluent from the point of discharge tothe nearest major watercourse (from the point of discharge toa classified segment as defined in 30 TAC Chapter 307) I known, please identify the classified segment number: Wastewater will either be land applied on land adjacent to the treatment ‘equipment or routed northwest to the Colorado River (Segment Number 1428) across Gapped Bass TLC property and under EM 1209, 8. Please provide a separate 7.5-minute USGS quadrangle map with the project boundaries plotted and a general location map showing the project area. Please highlight the discharge route from the point of discharge for a distance of one mile downstream. (This map is required in addition to the ‘map in the administrative report.) Attachment: USGS TOPO MAP 9. Provide original photographs of any structures 50 years or older on the property. Attachment: N/A 10. Does your project involve aay of the following? Check all that apply. Bi rroposed access roads, utility lines, construction easements Bi Visual effects that could damage or detract from a historic property's integrity Bi vibration effects during construction or asa result of project design [Bi Additional phases of development that are planned for the future B sealing caves, fractures, sinkholes, other karst features Hi Disturbance of vegetation or wetlands 11 List proposed construction impact (surface acres to be impacted depth of excavation, sealing of caves, of other karst features): Plann: tion of on-si yee hous nit ‘café with associated parking on approximately G8 acres of land northeast ofthe existing site development, Plann ‘tion of underground paping for wastewater discharge di roximatel linear feet northwest of exis “lopment, to the ver. 12, Describe existing disturbances, vegetation, and land use: Site is currently developed with several war an lings, fifteen on m recreational court, ated th sisting dey "THE FOLLOWING ITEMS APPLY ONLY TO APPLICATIONS FOR NEW TPDES PERMITS AND MAJOR AMENDMENTS TO TPDES PERMITS 13, List construction dates of all buildings and structures on the property: Construction dates of existing buildings range from mid 2021-present 114, Provide a brief history of the property, and name of the architect/builder, if known: Land previously was an agricultural site, It was acquired by Gapped Bass LLC in earlv 2021, first erations begin in mid 2021, Various bull tors were used for structures on site. “TCEO-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 13 of 19 WATER QUALITY PERMIT PAYMENT SUBMITTAL FORM. Use this form to submit the Application Fee, if mailing the payment. (Instructions, Page 34) ‘© Complete items 1 through 5 below. + Staple the check or money order in the space provided at the bottom of this document. ‘+ Do not mail this form with the application form, + Donot mail this form to the same address as the application. ‘© Do not submit a copy of the application with this form as it could cause duplicate permit entries. Mail this form and the check or money order to: BY REGULAR US. MAIL BY OVERNIGHT/EXPRESS MAIL ‘Texas Commission on Environmental Quality _‘Texas Commission on Environmental Quality Financial Administration Division Financial Administration Division Cashier's Office, MC-214 Cashier's Office, MC214 P.O. Box 13088 12100 Park 35 Circle ‘Austin, Texas 78711-3088 ‘Austin, Texas 78753 Fee Code: WOP Permit No: WOOOCCHGERSTERRERTER, 1. Check or Money Order Number: CHER RSTERSTE® 2. Check or Money Order Amount: CHEESES, 3. Date of Check or Money Order: CETOEHEENER 4. Name on Check oF Money Order: 5, APPLICATION INFORMATION Name of Projector Site Physical Address of Project or Site: CHERTST@ATeE TERE If the check is for more than one application, attach a list which includes the name of each Project or Site (RE) and Physical Address, exactly as provided on the application. Attachment: ClieWto entet it Staple Check or Money Order in This Space “TCEQ-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 14 0f 19 Checklist of Common Deficiencies Below is a Ust of common deficiencies found during the administrative review of industrial wastewater permit applications. To ensure the timely processing of this application, please review the items below and indicate each item is complete and in accordance applicable rules at 30 TAC Chapters 21, 281, and 305 by checking the box next to the item. If an item is not required this application, indicate by checking N/A where appropriate, lease do not submit the application untl all items below are esse Bi Core Data Form (TCEQ Form No. 10400) Required for all applications types. Must be completed in tts entirety and signed. Note: Form may be signed by applicant representative.) B correct and Current industrial Wastewater Permit Application Forms (TCEQ Form Nos. 10055 and 10411 Version dated 3/10/2019 or later) Hi Water Quality Permit Payment Submittal Form (Page 14) (Original payment sent 19 TCEQ Revenue Section. See instntctions for mailing address.) 7.5 Minute USGS Quadrangle Topographic Map Attached Gullsize map if seeking “New” perm 8 45x 11 acceptable or Renewals and Amendments) HEN/A Ei Current/Non Expired, Executed Lease Agreement or Easement Attached EEN/A BiLandowners Map (Gee instructions for landowner requirements.) ‘Things to Know: ‘+ All the items shown on the map must be labeled. + The applicant's complete property boundaries must be delineated which includes boundaries of contiguous property owned by the applicant. +The applicant cannot be its own adjacent landowner. You must identify the Jandowners immediately adjacent to their property, regardless of how far they are from the actual facility. «Ifthe applicant's property is adjacent to a road, creck, or stream, the landowners on. the opposite side must be identified. Although the properties are not adjacent to applicant's property boundary, they are considered potentially affected landowners. If the adjacent road is a divided highway as identified on the USGS topographic map, the applicant does not have to identify the landowners on the opposite side of the highway. EIN/A BiLandowners Cross Reference List (See instructions for landowner requirements.) IN/A Bi Landowners Labels or CD-RW attached (See instructions for landowner requirements.) 1B original signature per 30 TAC § 305.44 ~ Blue Ink Preferred df signature page is not signed by an elected official or principle executive officer, arcooy of signature authorty/delegation letter must be attached) Plain Language Summary ‘TCEO-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 15 of 19 Plain Language Summary Template and Instructions for Texas Pollutant Discharge Elimination System (TPDES) and Texas Land Application (TLAP) Permit Applications ‘This template is a guide to assist applicant’ in developing a plain language summary as required by 30 Texas Administrative Code Chapter 39 Subchapter H. Applicant's may modify the template as necessary to accurately describe their facility as long as the summary includes the following information: (1) the function of the proposed plant or facility; (2) the expected output of the proposed plant or facility; (3) the expected pollutants that may be emitted or discharged by the proposed plant or facility, and (4) how the applicant will control those pollutants, so that the proposed plant will not have an adverse impact on human health or the environment. Fill in the highlighted areas below to describe your facility and application in plain language. Instructions and examples are provided below. Make any other edits necessary to improve readability or grammar and to comply with the rule requirements. If you are subject to the alternative language notice requirements in 30 Texas Administrative Code §39.426, you rovide a translat of leted plait in the riate tive as application . For your convenience, a Spanish template has been provided below. [ENGLISH TEMPLATE FOR TPDES or TLAP NEW/RENEWAL/AMENDMENT APPLICATIONS INDUSTRIAL WASTEWATER/STORMWATER The following summary is provided for this pending water quality permit application being reviewed by the Texas Commission on Environmental Quality as required by 30 Texas ‘Administrative Code Chapter 39. The information provided in this summary may change during the technical review of the application and are not federal enforceable representations of the permit application. Gapped Bass LLC operates the FM 1209 Wastewater Treatment Facility, which will reat and discharge ‘nastewater from industrial and domestic operations related to tunnel boring equipment Manufacturiag/‘testing, an on-site bistro, and sanitary wastewater related to restroom facilities and housing, The facility is located at 130 Walker-Watson Road, in Bastrop, Bastrop County, Texas 78602. Gapped Bass LLC requests authorization to either land apply or discharge to the Colorado River up to $3300 gallons per day of treated industrial and domestic wastewater With and additonal 60,000 gallons per day each for two optional phases. Discharges from the facility are expected to contain compounds typically found in treated wastewater including Chloride, Nitrate, Nitrite, Sulfate, Nitrogen, Turbidity, Total Alkalinity, Bicarbonate ‘Alkalinity, Total Dissolved Solids, Total Suspended Solids, pH, Dissolved Oxygen, and Total Nitrogen. Wastewater will be initially treated through septic tanks and sent fo secondary treatment by one of three Orenco AdvanTex AX-Max Treatment Systems prior to land application or discharge to the river. PLANTILLA EN ESPANOL PARA SOLICITUDES NUEVAS/RENOVACIONES/ENMIENDAS DE ‘TPDES 0 TLAP "AGUAS RESIDUALES INDUSTRIALES/AGUAS PLUVIALES Fl siguiente resumen se proporciona para esta solicitud de permiso de calidad del aqua ypendiente que esta siendo revisada por la Comistén de Calidad Ambiental de Texas segtin to requerido por el Capitulo 39 del Cédigo Administrative de Texas 30. La informacién “TcEQ-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 16 of 19 proporcionada en este resumen puede cambiar durante la revisién técnica de la solicitud y no son representaciones federales exigibles de la solicitud de permiso. Gapped Bass LLC opera la instalacién de tratamiento de aguas residuales, que trata y descarga aguas residuales de operaciones industriales y domesticas relacionadas con la fabricacién/prueba de equipos de perforacién de tineles, un restaurante en el lugar y aguas residuales sanitarias relacionadas con bafios y viviendas. La instalacidn esta ubicada en 130 Walker-Watson Road, en Bastrop, Condado de Bastrop, Texas 78602. Gapped Bass LLC solicita autorizacién para aplicar en tierra o descargar al rio Colorado hasta 22,500 galones por dia de aguas residuales industriales y domésticas tratadas con y adicionales 60,000 galones por dia cada uno para dos fases opcionales Se espera que las descargas de la instalacion contengan compuestos que normalmente se | encuentran en las aguas residuales tratadas, inchuidos cloruro, nitrato, nitrito, sulfato, nitrégeno, turbidez, alcalinidad total, alcalinidad de bicarbonato, solidos disueltos totales, sélidos suspendidos totales, pH, oxigeno disuelto y nitrégeno total. Las aguas residuales serdn tratadas inicialmente a través de fosas sépticas y enviadas a tratamiento secundario por uno de los tres sistemas de Orenco AdvanTex AX-Max Treatment Systems antes de la aplicacién al suelo o la descarga al ri. INSTRUCTIONS 1, Enter the name of applicant in this section. The applicant name should match the name associated with the customer number. 2, Enter the Customer Number in this section. Each Individual or Organization is issued a unique 11-digit identification number called a CN (e.g. CN123456789).. 3. Choose “operates” in this section for existing facility applications or choose “proposes to operate” for new facility applications. 4, Enter the name of the facility in this section. The facility name should match the name associated with the regulated entity number. 5, Enter the Regulated Entity number in this section. Each site location is issued a unique 1-digit identification number called an RN (e.g. RN123456789). 6. Choose the appropriate article (a or an) to complete the sentence, 7. Enter a description of the facility in this section. For example: steam electric generating facility, nitrogenous fertilizer manufacturing facility, etc ‘8. Choose *is” for an existing facility or “will be" for a new facility. 9. Enter the location of the facility in this section. 10.Enter the City nearest the facility in this section. iter the County nearest the facility in this section. ter the zip code for the facility address in this section, 13.Enter a summary of the application request in this section. For example: renewal to discharge 25,000 gallons per day of treated domestic wastewater, new application to discharge process wastewater and stormwater on an intermittent and flow-variable basis, or major amendment to reduce monitoring frequency for pH, ete. If more than one outfall is included in the application, provide applicable information for each individual outfall, 2022) Industrial Wastewater Application Administrative Report Page 17 of 19 TCEO-10411 (04/1 14.List all pollutants expected in the discharge from this facility in this section. If applicable, refer to the pollutants from any federal numeric effluent limitations that apply to your facility. 15.Enter the discharge types from your facility in this section (e.g. stormwater, process ‘wastewater, once through cooling water, etc.) 16.Choose the appropriate verb tense to complete the sentence. 17.Enter a description of the wastewater treatment used at your facility. Include a description of each process, starting with initial treatment and finishing with the outfall/point of disposal. Use additional lines for individual discharge types if necessary. ‘TCEO-10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 18 of 19 Example Individual Industrial Wastewater Application The following summary is provided for this pending water quality permit application being reviewed by the Texas Commission on Environmental Quality as required by 30 Texas ‘Administrative Code Chapter 39. The information provided in this summary may change ‘during the technical review of the application and are not federal enforceable representations of the permit application. ABC Corporation (CN600000000) operates the Starr Power Station (RN10000000000), a two- ‘unit gas fired electric generating facility. Unit 1 has a generating capacity of 393 megawatts (QWs) and Unit 2 has a generating capacity of 528 MWs. The facility is located at 1356 Starr Street, near the City of Austin, Travis County, Texas 78753. ‘This application is for a renewal to discharge 870,000,000 gallons per day of once through cooling water, auxiliary cooling water, and also authorizes the following waste streams monitored inside the facility (internal outfalls) before it is mixed with the other wastewaters authorized for discharge via main Outfall 001, referred as “previously monitored effluents” (ow volume wastewater, metal cleaning waste, and stormwater (from diked oil storage area yards, and storm drains) via Outfall 001. Low volume waste sources, metal cleaning waste, and stormwater drains on a continuous and flow-variable basis via internal Outfall 101. ‘The discharge of once through cooling water via Outfall 001 and low yolume waste and metal leaning waste via Outiall 101 from this facility is subject to federal effluent limitation guidelines at 40 CER Part 423. The pollutants expected from these discharges based on 40 CrR Part 423 are: free available chlorine, total residual chlorine, total suspended solids, oil and grease, total iron, total copper, and pH. Temperature fs also expected from these discharges. Additional potential pollutants are included in the Industrial Wastewater Application Technical Report, Worksheet 2.0. Cooling water and boiler make-up water are supplied by Lake Starr Reservoir, The City of ‘Austin municipal water plant (CN600000000, PWS 00000) supplies the facility's potable water and serves as an alternate source of boiler make-up water. Water from the Lake Starr Reservoir is withdrawn at the intake structure and treated with sodium hypochlorite to prevent biofouling and sodium bromide a a chlorine enhancer to improve efficacy and then passed through condensers and auxiliary equipment on a once-through basis to cool equipment and condense exhaust steam. Low volume wastewater from blowdown of boiler Units 1 and 2 and metal cleaning wastes receive no treatment prior to discharge via Outfall 101. Plant floor and equipment drains and stormwater runoff from diked oil storage areas, yards, and storm drains are routed through an oil and water separator prior to discharge via Outfall 101. Domestic wastewater, blowdown, and backwash water from the service water filter, clarifier, and sand filter are routed to the Starr Creek Domestic Sewage Treatment Plant, ‘TPDES Permit No, WQ0010000001, for treatment and disposal. Metal cleaning waste from equipment cleaning is generally disposed of off-site TCEQ 10411 (04/15/2022) Industrial Wastewater Application Administrative Report Page 19 of 19 Gapped Bass LLC July 2022 ATTACHMENT Industrial Wastewater Permit Application ‘TECHNICAL REPORT TECHNICAL REPORT 1.0 INDUSTRIAL “The following information is required for all applications for a TLAP or an individual TPDES discharge permit. For additional information or clarification on the requested information, refer to the Instructions for ‘mpleting the Industrial Wastewater Permit Application’ available on the TCEQ website. If more than one outfall is included in the application, provide applicable information for each individual outfall. fan item does not apply to the facility, enter N/A to indicate that the item has been Considered. Include separate reports or additional sheets as clearly cross-referenced attachments and provide the attachment number in the space provided for the item the attachment addresses. NOTE: This application is for an industrial wastewater permit only. Additional authorizations from the "TCEQ Waste Permits Division or the TCEQ Air Permits Division may be needed. 1a. Describe the general nature of the business and type(s) of industrial and commercial activities, Include all applicable SIC codes (up to 4). Gapped Bass LLC operates the FM 1209 Wastewater Treatment Facility, which treats and discharges wastewater from industrial operations related to tunnel boring equipment | nanufacturing (SIC 3499) and testing (S1C1622), an on-site bistro (SIC 5812), and sanitary wastewater related to restroom/ washroom facilities and housing (1521). , _Deseribe all wastewater-generating processes at the facility [Wastewater generating processes atthe facility include water used during industrial processes, specifically, a metal cutting process which utilizes water jets to cut metal. Domestic wastewater is generated fom on-site restrooms breakrooms/sinks and 15 single family employee housing units. ‘tn on-site bistro and 10 additional housing units are planned to be built, with eapacity to build ledditional units. Up to 100 on-site employees work atthe facility per day. The industrial and \domestic wastewater are intermingled during the treatment process and are initially treated through septic tanks and sent to secondary treatment by one of three Orenco AdvanTex AX-Max Treatment ‘Systems prior to land application or discharge to the river. Should significant housing be added, ‘standard package plant may be used in lieu of additional Orenco AdvanTex AX-Max Treatment Systems. "bntps://wnww.t00q texas gov /permitting/ wastewater industrial TPDES_industral_wastewater_steps.html ‘TCEQ 10055 (01/01/2021) vdustil Wastewater Application Technical Report Page of 53 ¢. Provide a list of raw materials, major intermediates, and final products handled at the facility. Materials List ‘Raw Materials Intermediate Products Final Products Cement, aggregate None. Concrete ‘Manufactured metal parts None ‘Machined metal parts Attachment: [NTN 4. Attach a facility map (drawn to scale) with the following information: «Production areas, maintenance areas, materials-handling areas, waste-disposal areas, and water intake structures. «+ The location of each unit of the WWTP including the location of wastewater collection sumps, impoundments, outfall, and sampling points, if significantly diferent from outfall locations. “Attachment: ATTACHMENT 4: MAPS ‘e. Isthis a new permit application for an existing facility? Hi ves No Ifyes, provide background discussion: as f. Is/will the treatment facility /disposal site be located above the 10-year frequency flood level. B vs % List source(s) used to determine 100-year frequency flood plain: FEMA Flood Map 48021Co195E, dated 1/19/2006 Ifo, provide the elevation ofthe 100-year frequency flood plain and describe what protective roueires are used /proposed to prevent flooding (including tail water and rainfall run-on controls) of the treatment facility and disposal area: [9 oe “Attachment: ATTACHMENT 4: MAPS g. Fornew or major amendment permit applications, wll any construction operations result ina discharge of fill material into a water in the state? BG ves $B No G _ N/A(renewal only) be. Ifyesto Item 1g, has the aplicant applied fora USACE CWA Chapter 404 Dredge and Fill permit? B vs 6 No Ifyes, provide the permit number: [IIE | If no, provide an approximate date of application submittal to the USA E -7£9-10055 (01/01/2021) Industrial Wastewater Application Technical Report age 25 a. List any physical, chemical, or biological treatment process(es) used proposed to treat wastewater at this facility: Include a description of each treatment process, starting with intial treatment and finishing with the outfall/point of disposal [ Wastewater atthe facility is generated through industrial processes, on-site water use by employees, and ‘Gomestic sewage. The wastewater Is intially treated in underground septic tanks and then pumped to an ‘Orenco Advanex AX-Max Treatment Systems prior toland application or discharge to the river. The treatment system consists of a three (3) tank system which utilizes two (2) primary holding tanks equipped With textile media filters, and one (1) three (3) eompartment Ax-Max treatment tank which consists of a Flow/ EQ Tank, Discharge Tank, and a Reciprocating Tank. Treated wastewater is then discharged to a spray field ‘which utilizes thirty (30) spray heads or discharged to the Colorado River. The system will treat the wastewater | Suen to <20/20 mg/l HOD &°TSS with chlorination prior to discharge, Curreatly, one (1) Ax Max unit is 00 ‘Site, however, upon expansion of operations, as described in part 10), the facility will add two (2) additional | [GeMax treatment systems and appropriate number of auxiliary tanks. Spray field capabilities will be ‘apanded for use during periods when allowed. Generated wastewater in excess of allowable limits and during, faoaths when discharge tothe spray feld isnot allowed will be discharged tothe Colorado River via tnderground plumbing. Ultimately, discharge to the Colorado River willbe the final primary of release. 1f ditional housing is aided during subsequent phases, a standard package plant may be used for treatment. b. Attach a flow schematie with a water balance showing all sources of water and wastewater flow into the facility, wastewater flow into and from each treatment unit, and wastewater flow to each outfall/point of disposal. Attachment: ATTACI UINARY, a ORT Does the facility use or plan to use any wastewater impoundments (e. B vs BB No If no, proceed to Item 4. Ifyes, complete Item 3. for existing impoundments and Items 3.a - 3.¢ for new or proposed impoundments. NOTE: See instructions, Pages 35-37, for additional information on the attachments required by Items 3.a - 3.e, lagoons or ponds?) ‘a, Complete the table with the following information for each existing, new, or proposed impoundment: ‘Use Designation: Indicate the use designation for each impoundment as Treatment (T), Disposal (D), Containment (C), or Evaporation (E). Associated Outfall Number: Provide an outfall number ifa discharge occurs or will occur. Liner Type: Indicate the liner type as Compacted clay liner (C), In-situ day liner (1), Synthetie/plastie/rubber liner (8), or Alternate liner (A). NOTE: See instructions for further detail on liner specifications If an alternate liner (A) is selected, include an attachment that provides a description of the alternate liner and any additional technical information necessary for an evaluation. Leak Detection System: If any leak detection systems are in place/planned, enter ¥ for yes. Otherwise, enter N for no. Groundwater Monitoring Wells and Data: If groundwater monitoring wells are in place/planned, enter ¥ for yes. Otherwise, enter N for no. Attach any existing groundwater monitoring data, Dimensions: Provide the dimensions, freeboard, surface area, storage capacity of the impoundments, and the maximum depth (not including freeboard). For impoundments with irregular shapes, submit surface area instead of length and width. Compliance with 40 CFR Part 257, Subpart Dé If the impoundment is required to be in compliance with 40 CFR Part 257, Subpart D, enter ¥ for yes. Otherwise, enter N for no. TC¥Q-10055 (1/01/2021) Industrial Wastewater Application Technical Report Page aot sa Date of Construction Enter the date construction of the impoundment commenced (mm/dd/yy)- Impoundment Information Parameter Pond # Pond # Pond # Pond # Use Designation: (7)(D) (©) or &) ‘Associated Outiall Number Liner Type (©) (0 (8) oF (A) All, Liner Attachment Reference Leak Detection System, Y/N (Groundwater Monitoring Wells, ¥/N ‘Groundwater Monitoring Data Attachment ‘Pond Bottom Located Above The Seasonal High-Water Table, Y/N Length Width (®) ‘Max Depth From Water Surface (R), Not Including Freeboard Freeboard (A) ‘Surface Area (acres) ‘Storage Capacity (gallons) {40.CFR Part 257, Subpart D, Y/N Date of Construction Impoundment Information Parameter Ronde Pond # Pond # Pond # ‘Use Designation: (1) (D) (©) oF ©) ‘Associated Outill Number Liner Type (© (IS) or) ‘Ak, Liner Attachment Reference ‘Leak Deteston System, ¥/N, Groundwater Monitoring Wells, Y/N ‘Groundwater Monitoring Data Attachment Pond Bottom Located Above The Seasonal High-Water Table, Y/N “Length (@) ‘Width (8) ‘Max Depth From Water Surface (8), not Including freeboard Freeboard (A) ‘Surface Area (acres) ‘Storage Capacity (gallon 40.GFR Part 257, Subpart D,¥/N. Date of Construction ‘TCHO-10055 (01/01/2021) Industrial Wastewater Application Technical Report Pasngofes Attachment: [I ‘The fallowing information (Items 3. ~ 3.¢)is required only for new or proposed impoundments. b._ For new or proposed impoundments tach any avilable information on the following items. It Bo eens in te appropriate box. Otherwise, check no or not yet designed. Liner data Bi oYes Gl No Bi Notyetdesigned fi. Leak detection system or groundwater monitoring data Gives Bl No Bi Notyetdesigned iii, Groundwater impacts Ei ves Bl No Bi Notyetdesined [NOTES Item b iis required ifthe bottom ofthe pond is not above the seasonal high-water table in the shallowest water-bearing zone. Attachment: [inn For TLAP applications: Items 3.¢ ~ 3.¢ are not required, continue to Item 4 «._Atach a USGS map or acolor copy of original quality and scale which accurately Jocates ‘and identifies, Atach water upply wes and monitor wells within Y-mile of the impoundments, Attachment: [SES 4k._Attach copies of State Water Well Reports (eg, dle’slogs, completion data ete.) and deta. on depths asunder for all known water supply wells inclading deserption of how the ‘depths to igroundwater were obtained. “Attachment: [linn «attach information pertaining to the groundwater, sil, geology, pond liner, et. use to asess the ‘ett for migration of waste fromthe impoundments or the potential for contamination of jgroundwater or surface water. Attachment: [7 Complete the following tables to deseribe the location and wastewater discharge ot disposal operations for oo fall for discharge operations, and for each point of disposal for TLAP operations. if there are more outfls/poins of disposal at the facility than the spaces provided, copies of pages arayfoe numbered accordingly (Le, page 62, 6, et.) maybe used to provide information on the additional outfalls. For TLAP applications: Indicate the disposal method and each individual irrigation area [evaporation pond E or subsurtice drainage system § by providing the appropriate etter designation for the disposal ond Fi fllowed by numerical designation foreach disposal ares in the space provided for Outfall ractnber (e.g, Ea for evaporation pond 1, 12 for irrigation area No. 2, ete) -TcEQ-10055 (01/01/2021) Industrial Wastewater Application Techical Report Page sof 33 Wastestream Contributions Outfall Nox Loon Phase 1 Phase2 | __Phase3 Contributing Wastestream wen) |__| (wan) |_| tan) |) Industrial 0.00326 | 14.40% [0.00326 | 3.93% [0.00324 | 2.27% Domestic (Restrooms/washrooms/housing) —_|0.018756| 83.36% [0.078756] 95.06% [0.138755] 97.37% Domestic (Bistro) 0.000504) 2.24% fo.co0sos| o.6ix [o.000s04| 0.35% Total 0.0225 | 100x | 0.0825 | 100% | 0.1425 | 100% Note: An additional 0.06 MGO of Domestic (Restrooms/washrooms/housting) will be added in Phase 2 and 3. Outfall No: CROs Phased Phase 2 Phase 3 Contributing Wastestream (moo) |) | man) | (%) | (mon) | (x) industrial 0.00324 | 14.40% [0.00326 | 3.93% [0.00324 | 2.27% ‘Domestic (Restrooms/washrooms/housing) —_|0.018756| 83.36% [0.078756| 95.46% 97.37% ‘Domestic (Bistro) o.000508| 2.24% [0.000504] 0.61% 0.35% Total [00225 | 100% | 0.0825 |” 100% 100% Note: An additional 0.06 MGD of Domestic (Restrooms/washrooms/housting) will be added in Phase 2 and 3. CEQ-10055 (01/01/2021) Industral Wastewater Applicaton Technical Report Page 70 53, Pages of 3 ‘TCEO-10085 (1/ot/2021) Industral Wastewater Application Technical Report ‘a, Does the facility use/propose to use any cooling towers which discharge blowdown or other ‘wastestreams to the outtall(s)? B vs B No NOTE If the facility uses or plans to use cooling towers, Item 12 is required. b. Does the facility use or plan to use any boilers that discharge blowdown or other wastestreams to the outfall(s)? B ye fH No c. Does or will the facility discharge once-through cooling water to the outfall(s)? H ves & No NOTE: Ifthe facility uses or plans to use once-through cooling water, Item 12 is required, 4. Ifyes to items 5.2, 5b, oF 5. attach the SDS with the following information for each chemical additive + Manufacturers Product Identification Number + Product use (eg, biocide, fungicide, corrosion inhibitor, ete.) ‘+ Chemical composition including CASRN for each ingredient + Classify product as non-persistent, persistent, or bioaecumulative + Product or active ingredient halflife «Frequency of product use (e.g, 2 hours/day onee every two weeks) «Product toxicity data specific to fish and aquatic invertebrate organisms «Concentration of whole product or active ingredient, as appropriate, in wastestream. ‘Attach a summary of this information in addition to the submittal ofthe SDS for each specific ‘wastestream and the associated chemical additives and specify which outflls are affected. Attachment: [IIIT e, Cooling Towers and Boilers Ifyes to either Item 5.8 or 5.b, complete the following table. Cooling Towers and Boilers a ie DiyAvgBlowdown | Diy Max Blowdown fre ctUnte wea (gallons/day) (Gallons/day) Cooling Towers Boilers Are there any existing/proposed outialls which discharge stormwater associated with industrial activities, ‘as defined at 4o CFR § 122.26(b)(14), commingled with any other wastestream? BH ves ff No Ifyes, briefly describe the industrial processes and activities that occur outdoors or in some manner which may result in exposure of the activities or materials to stormwater: “TEQ-10055 (01/01/2021) Indutrial Wastewater Application Technical Report Page oof 53 Domestic Sewage - Waste and wastewater from humans or household operations that is discharged to a ‘wastewater collection system or otherwise enters a treatment works. 1. Check the box next to the appropriate method of domestic sewage and domestic sewage sludge treatment or disposal. Complete Worksheet 5.0 or Item 7. if directed to do so Gi Domestic sewage is routed (i.e, connected to or transported to) to a WWTP permitted to receive “domestic sewage for treatment, disposal, or both. Complete Item 7.b. Bi Domestic sewage disposed of by an on-site septic tank and drainfield system. Complete Item 7.b. ‘Bl Domestic and industrial treatment sludge ARE commingled prior to use or disposal. Gi industrial wastewater and domestic sewage are treated separately, and the respective sludge IS NOT ‘commingled prior to sludge use or disposal. Complete Worksheet 5.0. Bi Facility is a POTW. Complete Worksheet 5.0. Gi Domestic sewage is not generated on-site. Bi Other (e.g,, portable toilets), specify and Complete Item 7-b: On-site treatment and disposal through spra e tually to the Color . Provide the name and TCEQ, NPDES, or TPDES Permit No. of the waste-disposal facility which receives the domestie sewage /septage. If hauled by motorized vehicle, provide the name and TCEQ Registration No. ofthe hauler. Domestic Sewage Plant/Hauler Name Plant/Hlauler Name Permit/Registration No. rie Simpson TCEQ #25384 Is the permittee currently required to meet any implementation schedule for compliance or enforcement? Bovs Hf vo b. Has the permittee completed or planned for any improvements or construction projects? B ve ff No either 8.2 or 8b, providea brief summary ofthe requirements and a status update: Have any biological tests for acute or chronic toxicity been made on any of the discharges or on a receiving, ‘water in relation to the discharge within the last three years? BG Ys & No If yes, identify the tests and describe their purposes; [NTE Additionally attach a copy ofall tests performed which have not been submitted to the TCEQ or EPA. “1EQ-10055 (01/01/2021) Industeial Wastewater Application Technical Report Page 10.0853 Attachment: [IT a, Does or will the facility receive wastes from off-site sources for treatment at the facility, disposal on-site via land application, or discharge via a permitted outfall? B ys 6 No Ifyes, provide responses to Items 10.b through 10.4 below. Ifno, proceed to Item 11. b. Attach the following information to the application: + List of wastes received (including volumes, characterization, and capability with on-site wastes). + Identify the sources of wastes received (including the legal name and addresses of the generators). + Description of the relationship of waste source(s) with the facility's activities Attachment: ¢._ Iso will wastewater from another TCEQ, NPDES, or TPDES permitted facility commingled with this facility's wastewater after final treatment and prior to discharge via the final outfall/point of disposal? B vs HH No Ifyes, provide the name, address, and TCEQ, NPDES, or TPDES permit number ofthe contributing facility and a copy of any agreements or contracts relating to this activity. Attachment: [I=IN 6. Is this facility a POTW that accepts/will accept procéss wastewater from any SIU and has/is required to have an approved pretreatment program under the NPDES/TPDES program? B Ys 6 No Ifyes, Worksheet 6.0 ofthis application is required. ‘a. Are/will radioactive materials be mined, used, stored, or processed at this facility? B ye B No Ifyes, use the following table to provide the results of one analysis of the effluent for all radioactive materials that may be present, Provide results in pCi/L. Radioactive Materials Mined, Used, Stored, or Processed Radioactive Material ‘Concentration (pCi/L) TCEQ-10055 (01/01/2023) Industral Wastewater Application Technical Report Page a of53 \b. Does the applicant or anyone at the facility have any knowledge or reason to believe that radioactive ‘materials may be present in the discharge, including naturally occurring radioactive materials in the ‘source waters or on the facility property? Yes fi No If yes, use the following table to provide the results of one analysis of the eftluent forall radioactive ‘materials that may be present. Provide results in pCi/L. Do not include information provided in response to Item 11.2, Radioactive Materials Present in the Discharge Radioactive Material Concentration (pCi/L) ‘a. Does the facility use or propose to use water for cooling purposes? H ves Bi No Ifno, stop here. Ifyes, complete Items 12.b thru 12.f, b. Cooling water is/will be obtained from a groundwater source (e.g., on-site well). B ves 6 No Ifyes, stop here. If mo, continue. c. Cooling Water Supplier i. Provide the name of the owner(s) and operator(s) for the CWIS that supplies or will supply water for cooling purposes to the facility. Cooling Water Intake Structure(s) Owner(s) and Operator(s) cwis1D ‘Owner Operator fi, Cooling water is/will be obtained from a Public Water Supplier (PWS) B ves 6 No If no, continue. If yes, provide the PWS Registration No. and stop here: PWS No.l ili, Cooling water is/will be obtained from a reclaimed water source? B Ys No Ifno, continue. Ifyes, provide the Reuse Authorization No. and stop here: ‘TCHO-10055 (01/01/2021) Industrial Wastewater Application Teena! Report Page x2 033) iv. Cooling water is/will be obtained from an Independent Supplier BG ves B No fyes, provide the actual intake flow of the Independent Supplier’ provide water for cooling purposes tothe facility and proceed: Ifno, proceed to Item 12.4. WIS that is 4. 316(b) General Criteria ‘The CWIS(s) used to provide water for cooling purposes tothe facility has or will have a cumulative design intake flow of 2 MGD or greater. B ves H No fi, Atleast 25% of the total water withdrawn by the CWIS is/will be used at the facility exchusively for cooling purposes on an annual average basis. B Ys 6 No |. The CWIS(s) withdraw(s)/propose(s) to withdraw water for cooling purposes from surface waters that meet the definition of Waters ofthe United States in 40 CFR § 122.2, H vs 6 No 1 mo, provide an explanation of how the waterbody does not meet the definition of Waters of the United States in 40 CFR § 122.2: tyes toall three questions in Item 12.4, the facility meets the minimum criteria to be subject to the full requirements of Section 316(b) of the CWA. Proceed to Item 12+ no to any of the questions in Item 12.4, the facility does not meet the minimum criteria to be subject to the full requirements of Section 316(b) of the CWA; however, a determination is required based upon BP. Proceed to Item 12.€. €. The facility does not meet the minimum requirements to be subject tothe fil requirements of Section 4316(b) and uses/proposes to use cooling tower: GB Yes G No tyes, stop here. Ifno, complete Worksheet 11.0, tems 1(a), 1(b)(ii) and (vi), 2(6)(0, and 3(@) to allow fora determination based upon BPJ. f. Oil and Gas Exploration and Production i. The facility is subject to requirements at 40 CFR Part 435, Subparts A or D. H vs 6 No If yes, continue. If no, skip to Item 12.g. fi, The facility isan existing facility as defined at 4o CFR § 125.92(4) or a new unit at an existing facility as defined at 40 CFR § 125.92(u). B ves 6 No yes, complete Worksheet 11.0, tems 1(a), 1(b)ii) and (vi), 2(63(), and 3(a) to allow fora determination based upon BPJ. If no, skip to Item 12.g,iii. "TCEQ. 10055 (01/01/2021) Industrial Wastewater Application Technical Report Page 13 of 3 8, Compliance Phase and Track Selection i. Phase I—-New facility subject to 40 CFR Part 125, Subpart I Boys B No Ifyes, check the box next to the facility's compliance track selection, attach the requested information, and complete Worksheet 11.0, Items 2 and 3, and Worksheet 11.2 track 1— AIF greater than 2 MGD, but less than 10 MGD + Attach information required by 40 CFR §§ 125.86(6)(2)-(4). Track I— AIF greater than 10 MGD ‘+ Attach information required by 40 CFR § 125.86(0). ‘Track It + Attach information required by 40 CFR §125.86(c). Attachment: Phase Il ~ Existing facility subject to 40 CFR Part 125, Subpart J B ves GB No Ifyes, complete Worksheets 11.0 through 11.3, as applicable. iii, Phase [II - New facility subject to 4o CFR Part 125, Subpart N. G ves 6 No Ifyes, check the box next to the fecilty’s compliance track Selection and provide the requested information. Bi track rined facility ‘+ Attach information required by 4o CFR § 125,136(b) and complete Worksheet 11.0, Items 2 and 3, and Worksheet 11.2. B Track 1 - Nota fixed facility + Attach information required by 40 CFR § 125.136(b) and complete Worksheet 11.0, Item 2 (except the CWIS latitude and longitude under Item 2.2). Track 11- Fixed facility ‘© Attach information required by 40 CFR § 125.136(c) and complete Worksheet 11.0, Items 2 and a. Attachment: (a TCEQ-10055 (01/01/2021) Industrial Wastewater Application Technical Report Page a4 of 53 ‘NOTE: Item 13 is required only for existing permitted facilities. a. Is the facility requesting a major amendment of an existing permit? B Ys BH No yes, list each request individually and provide the following information: 1) detailed information regarding the scape af each request and 2) a justification for each request. Attach any supplemental information or additional data to support each request. b. Is the facility requesting any minor amendments tothe permit? B vs Bf vo If yes, list and discuss the requested changes. c. Isthe facility requesting any minor modifications to the permit? H ves fH No Ifyes, list and discuss the requested changes, EEE “TCRO-10085 (01/01/2021) Industrial Wastewater Application Technical Report Page 13 of WORKSHEET 1.0 EPA CATEGORICAL EFFLUENT GUIDELINES This worksheet is required for all applications for TPDES permits for discharges of wastewaters subject to EPA categorical effluent imitation guidelines (ELGs). Is this facility subject to any of the 40 CFR categorical ELGs outlined on page 52 of the instructions? H vs wo Ifo, this worksheet is not required. If yes, provide the appropriate information in the table below. 40 CFREMuent Guidelines Tadustey qoOrR Pat Metal Produce and Machine 18 NOTE: For all TPDES permit applications requesting individual permit coverage for discharges of oil and gas exploration and production wastewater (discharges into or adjacent to water in the state, falling under the Oil and Gas Extraction Effluent Guidelines ~ 40 CFR Part 435), see Worksheet 12.0, Item 2 instead. a, Production Data Provide the appropriate data for effluent guidelines with production-based effluent limitations. Production Data Subcategory | Actual Quantity/Day | Design Quantity/Day Units 1 (Metal cuting and ‘machining utilizing 450 450 pm water jets) "TCEQ-10055 (01/03/2021) Industeal Wastewater Applicaton Technleal Report Page 160653 Subcategory | Actual Quantity/Day | Design Quantity/Day ‘Units b. Organic Chemicals, Plastics, and Synthetic Fibers Manufacturing Data (40 CFR Part 414) Provide each applicable subpart and the percent of total production. Provide data for metal-bearing and ‘eyanide-bearing wastestreams, as required by 40 CFR Part 414, Appendices A and B. Percentages of Total Production sie Percent of Total Appendix and B- | appendix A Cyanide ¢. Refineries (40 CFR Part 419) Provide the applicable subeategory anda bref justification | oe process wastewater flows). Specify which wastewater flows are to be authorized for discharge under this permit and the disposal practices for wastewater flows, excluding domestic, which are not to be authorized Provide a breakdown of wastewater flow(s) generated by the facility, including both process and non- for discharge under this permit. TCEQ-10055 (01/01/2021) Industrial Wastewater Application Technical Report Page 170f33 ‘Wastewater at the facility is generated through process cutting water and domestic sewage. The wastewater is held in underground storage tanks, then pumped to an Orenco Systems AdvanTex ‘Treatment Systems Ax-Max Decentralized Wastewater Treatment Plant. The treatment plant consists of a three (3) tank system which utilizes two (2) primary holding tanks equipped with textile media filters, and one (2) three (3) compartment Ax-Max treatment tank which consists of a Flow/EQ Tank, Discharge Tank, and a Reciprocating Tank. Treated wastewater is then discharged to a spray field which utilizes | thirty (g0) spray heads. The system will treat the wastewater effluent to <20/20 mg/L BOD & TSS with chlorination. Upon expansion of operations, as described in part 1(b), the facility will add two (2) additional Ax-Max treatment plants and appropriate number of auxiliary tanks, and discharge to spray. field, which utilizes one-hundred and thirty-five (135) spray heads, during periods when allowed. Generated wastewater in excess of allowable limits and during months when discharge to the spray field is not allowed will be discharged to the Colorado River via underground plumbing. Provide a list ofall wastewater-generating processes subject to EPA categorical ELGs, identify the appropriate guideline Part and Subpart, and provide the date the process construction commenced. Wastewater-generating Processes Subject to Effluent Guidelines ae Date Proce! Process wracuideline:rart | PPAGuideline: Construction See ucGletiogeal | See Tacos rac auog ter | 408 Maal rods and x m0 ets TCEQ-10055 (01/01/2021) Industrial Wastewater Application Technical Report Page 18 of 53, ‘WORKSHEET 2.0 POLLUTANT ANALYSES REQUIREMENTS ‘Worksheet 2.0 is required for all applications submitted for a TPDES permit. Worksheet 2.0 is not required for applications for a permit to dispose of all wastewater by land disposal or for discharges solely ‘of stormwater associated with industrial activities. Effective July 1, 2008, all laboratory tests performed must meet the requirements of 30 TAC Chapter 25, a Testing Laboratory Accreditation and Certification with the following general a. The laboratory isan in-house laboratory and is: i. periodically inspected by the TCEQ; or located in another state and is accredited or inspected by that state; or performing work for another company with a unit located in the same site: iv. performing pro bono work for a governmental agency or charitable organization. b. The laboratory is aceredited under federal law. The data are needed for emergency-response activities, and a laboratory accredited under the Texas Laboratory Accreditation Program is not available. . ‘The laboratory supplies data for which the TCEQ does not offer accreditation. Review go TAC Chapter 25 for specific requirements. The following certification statement shall be signed and submitted with every application. See Instructions, Page 32, fora list of approved signatories. 1, EEA, certify that al laboratory tests submitted with this application meet the requirements of go TAC Chapter 25, Environmental Testing Laboratory Accreditation and Certification. Gignatarey 1. Provide the date range ofall sampling events conducted to obtain the analytical data submitted with this application (e.g, 05/01/2018-05/30/2018): Applicant requests that special permit conditi ided in which samy lected and b. EE Check the box to confirm all samples were collected no more than 12 months prior tothe date of aplication submittal Read the general testing requirements in the instructions for important information about sampling, test methods, and MALS. If contact laboratory was used, attach alist which includes the name, contact information, and pollutants analyzed for each laboratory/firm. Attachment: [inn Attach correspondence from TCEQ approving submittal of less than the required number of samples, if applicable, Attachment: a 11CEQ-10055 (01/01/2024) lndustrial Wastewater Application Techniesl Report Page 19 of 53 ‘Table 1 for Outfall No. yr CRoot -eatment rs Samples are (check one): Composite Hl Grab “Samples Sample2 | Samples ong) (ng/) (mg/l) Pollutant BoD Gada) (C80 (ay) 908 78 7 ‘Chemical angen demand “oalonanic carbon Disa ons “Sonia itor Total suspended sls Nite irogen Teal ong ioe “etal phosphors Oilandwrease Total sidan clone Toul dished sabis| alate here Flere Tot alain (mg/L. as GCO3) “Tesperture CP a6 me it standard wits) za 7s ‘Table 2 for Outfall No.: 1001 or CRoot (Prior To Treatment) Samples are(cheekone): [1 Composites Grabs a en a Ss ae s =a mr =e ae a a ‘TABLE 3 (Instructions, Page 58) Completion of Table 3 is required for all external outfall which discharge process wastewater. Partial completion of Table 3 is required for all external outfalls which discharge non-process ‘wastewater and stormwater associated with industrial activities commingled with other wastestreams (see instructions for additional guidance). Table3 for Outfall No.: FIGHEECRGG Samplesare(checkone): LE] Composites fi Grabs Pollutant Sample: | Sample2 | Sample3 | Sample4 | MAL warty | aww | ower | wer | wer =

You might also like