You are on page 1of 5

GUIDELINE FOR PROJECT

RECORD BOOK OUTLINE


ARRANGEMENT

Strictly Private & Confidential Page 1


SPIN SIDE LABEL

1. Engineering Document 2. Vendor Document

Strictly Private & Confidential Page 2


FRONT SIDE OF THE OUTER TITLE PAGE

1. Engineering Document

2. Vendor Document

Strictly Private & Confidential Page 3


INSIDE FOLDER
When we open the folder, we will see PRB Master List in the left-hand side and Internal front Page in
the right-hand side, the next page is Index (List of Document)

3. Index (List of Documents in this folder)

2. Internal Front Page (*)


1. PRB Master List (*) Internal Front Page is shown for Engineering & Vendor
Document

Strictly Private & Confidential Page 4


INDEX OF PROJECT RECORD BOOK (PRB)
In the PRB Index, we will have Master Index List which shows list of total volumes and document detail information
for each volume.
Note :

Strictly Private & Confidential Page 5

You might also like