Sl No.

Description Status
1 Super heater metal temperature to be check
2 Control switch to be shift
3 DCS panel cleaning
4 UPS panel cleaning
W#1A
5 Furnace draft purging
Field panel cleaning
Radiation zone Inst air header installation
6 BIT temperature installation
7 Instrument air line leakage
8 Drum LT mounting
W#1B
9 IDF-1&2 discharge PT Checking
10 Furnace draft purging
11 HPH-1 Bleed FT leakage to be arrest Mechanical
12 Wheel chamber PT leakage to be arrest Mechanical
13 ACC Logic to be implement
14 TG#1B Aux. PRDS FT Isolation choking to be clear Mechanical
15 Main Steam FT Isolation choking to be cleared Mechanical
16 CST Level Gauge to be rectify
17 Gen cooling Tmp. To be check at scanner Electrical
FOC Number
FOC-1 SWITCH(YELLOW)
ULO178B20