Patrol Edit
Patrol Edit
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
Daftar Isi
1. Highlight Project
5. Risiko Proyek
7. Karya Inovasi
8. Digitalisasi
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
1. Highlight Project
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
Kota Kupang
Bandara El-Tari
± 16 km
Oelnasi
Kuaklalo Bokong
Nusa Tenggara Timur
Oeletsala Soba
Lokasi Proyek
Sungai : Sungai Manikin
Desa : Kuaklalo
Secara umum rencana Bendungan Tefmo/Manikin
berada di Desa Kuaklalo berbatasan dengan Desa Kecamatan : Taebenu
Bokong Kecamatan Taebenu Kabupaten Kupang Kabupaten : Kupang
Propinsi : Nusa Tenggara Timur (±16 km / 35 menit dari kota Kupang)
Masa Pelaksanaan 1440 hari kalender (15/01/2019 – 25/12/2022) Ra vs Ri s.d 14 Agustus 2022:
Rencana perpanjangan s/d 2024 (proses
pengajuan addendum) Ra : 30,460 %
Ri : 30,610 %
Dev : 0,150 %
Waduk Cofferdam
Daerah tangkapan : 49,31 km2 Tipe cofferdam : rip rap (batu gamping)
Debit rata-rata tahunan : 1,20 m3/detik El. Puncak cofferdam : +136 m
El.MA banjir PMF : +152.13 m Lebar puncak : 20 m
Luas tampungan Normal : 148,75 ha Kemiringan : 1 : 40 (u/s) dan 1 : 1.0 (d/s)
Kap. tampungan total : 20,45 x 106 m3 Bendungan
Pengambil Tipe : random (batu fragmental & gamping koralin inti tegak)
Tipe : drop intake El. Puncak bendungan : +153 m
Diameter : 3,0 m Tinggi dari dasar galian : 50 m
Debit banjir rencana (Q25) : 404.33 m3/detik Lebar puncak : 12 m
Elevasi : +132.20 (hulu); +126.37(hilir) Kemiringan : 1 : 3.5 (u/s), dan 1 : 2.0 (d/s)
Bentuk : tapal kuda Volume timbunan : 2.237.832,07 m3
1 INTI LEMPUNG
2 FILTER HALUS
3 FILTER KASAR
4 RANDOM (BATU GAMPING
FRAGMENTAL)
5 RANDOM (BATU GAMPING
KORALIN)
6 RIP RAP (BATU
GAMPING)
STRUKTUR ORGANISASI
Manajer Proyek
KOKO HERU SATMOKO, ST
HSE Officer Safety Officer
WIKA ANDREAN DIKI PP, SKM YANSON MANU, S.Kep
HABIB P.,S.T IN NGAM
ADHI Perawat
A.A DEA, S.Kep
Deputy MP
JAKON SUHADI WIYONO, ST
Kasie Engineering Pelaksana Utama Kasie Keuangan Kasie Komersial dan Pengadaan
ALBOIN F TAMBUNAN, ST AGUS WAHYUDI, ST AGUNG TRI R, SE A. MUHROJI, ST
Methode
MELDA M ,ST Planing dan Pelaporan Pelaksana Kasir Cost Control
NANDO R, ST SUNARDJO WIENDRA SARAGIH, SE ANANG PRASETYO, ST
Ahli Geologi
QS
NANI KURNIAWATI,ST
TOTOK SUSANTO, ST. SAPUTRO Pajak Staff Komersial
SIDIK WASKITO, ST RIYAN R PUTRI PERTIWI, SE.
BIMO, Amd BENNY S,
Modelling YONARDI, Amd Akutansi
NADIA AMIRA Staff Pengadaan
JACOBIS JN, ST YAN BENU, SE
GATOT WIYATMOKO
Dokumentasi Gudang DODIK TRIAWAN
Suerveyor
ISHAK IWAN
RIYANTO
SUWANDI
QC
JERRY, FEKI, LOPU Ass. Pelaksana Penerima Bahan
DANIEL, HENDRIK BLASTISIUS, ST
TIUS
* Sisi Kiri
Panjang : 1200 m
Realisasi : 1080 m
Sisa : 120 m
ROAD MAP (STA 0+000 - 0+375)
ROAD MAP (STA 0+400 - 0+775) ROAD MAP (STA 0+800 - 1+165)
PEKERJAAN BRONJONG
Meddium
0.00
1.00
Medd. - Stiff
2.00
D - CL
3.00
Medd. - Stiff
4.00
sisi outlet
5.00
sisi inlet
Medd. - Stiff
6.00
7.00
CL
Medd. - Stiff
0.00 8.00
Medd. - Stiff
2.00 10.00 1.00
Very Stiff
4.00 12.00 3.00
5.00
6.00
7.00 D - CL
13.00
14.00
15.00
Very Stiff
0.00
EL.153.000 4.00
5.00
6.00
0.00
1.00
1.00
9.00 17.00 2.00 8.00 3.00 0.00
AREA TERDAMPAK
12.00 20.00 5.00 11.00 6.00 1.00 3.00
0.00
5.00
13.00 21.00 6.00 12.00 7.00 2.00 4.00
1.00 Hard Very Stiff
Hard 6.00
14.00 22.00 7.00 13.00 8.00 3.00 5.00
45
2.00
7.00
15.00 23.00 8.00 14.00 9.00 4.00 6.00
49.00 CL
3.00 Very Stiff
Hard 8.00
Hard 0.00
16.00 24.00 9.00 15.00 10.00 D - CL 5.00 7.00
53
4.00 1.00
9.00
17.00 25.00 10.00 16.00 11.00 6.00 8.00
53.50 Very Stiff
D - CL 5.00 Hard
Hard 10.00
2.00
18.00 26.00 11.00 17.00 12.00 7.00 9.00
54
6.00 3.00
11.00
19.00 27.00 12.00 18.00 13.00 8.00 10.00
Hard
KEMBANG SUSUT
7.00
55.50 Hard 13
Hard 12.00
Hard 4.00
20.00 28.00 13.00 19.00 14.00 9.00 11.00
57
8.00 13.50
5.00
13.00
21.00 29.00 14.00 20.00 15.00 10.00 12.00
9.00 Hard 41
Hard 14.00
Hard 6.00
22.00 30.00 15.00 21.00 16.00 11.00 13.00
10.00
58.50 36.00
EL.135,000
7.00
15.00
23.00 31.00 16.00 22.00 17.00 12.00 14.00
11.00 Hard 31
Hard 16.00
Hard CL - CM 8.00
24.00 32.00 17.00 23.00 18.00 13.00 15.00
>60
12.00 CL -CM 9.00
17.00
33.00 14.00
EL.132,200
25.00 18.00 24.00 19.00 16.00
Un Predictable
Hard 28.00
EL.132.00
13.00 Hard
Hard 18.00
10.00
26.00 34.00 19.00 25.00 20.00 15.00 17.00
>60
14.00 CL
11.00
19.00
27.00 35.00 20.00 26.00 21.00 16.00 Un Predictable 18.00
15.00 Hard 25
Hard CL - CM 20.00
Hard 12.00
28.00 36.00 21.00 27.00 22.00 17.00 19.00
>60 36.00
EL.129.00
16.00 13.00
21.00
29.00 37.00 22.00 28.00 23.00 18.00 Hard 20.00
17.00 Hard 47
Hard 22.00
Hard 14.00
CL - CM 30.00 38.00 23.00 29.00 24.00 19.00 21.00
>60
18.00 15.00
53.50
23.00
31.00 39.00 24.00 30.00 25.00 20.00 22.00
EL.126,37
19.00 Hard >60
Hard 24.00
Hard 16.00
32.00 40.00 25.00 31.00 26.00 21.00 23.00
20.00 17.00
25.00
33.00 41.00 26.00 32.00 27.00 22.00 24.00
21.00 Hard >60
Hard 26.00
Hard 18.00
34.00 42.00 27.00 33.00 28.00 23.00 25.00
22.00 19.00
27.00 CL
35.00 43.00 28.00 34.00 29.00 CL - CM 24.00 26.00
23.00
Hard Hard Hard 20.00
56.00
28.00
36.00 44.00 29.00 35.00 30.00 25.00 27.00
24.00 21.00
29.00
37.00 45.00 30.00 36.00 31.00 26.00 28.00
End Boring
Hard 52
25.00 Hard
End Boring Hard 30.00 End Boring 22.00
38.00 31.00 End Boring 32.00 27.00 29.00
End Boring End Boring End Boring
End Boring
33.00 30.00
34.00 31.00
35.00 32.00
36.00 33.00
37.00 34.00
38.00 35.00
End Boring
36.00
End Boring
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
PROSEDUR DAN STANDAR
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
KALIBRASI ALAT UJI
SLOPE
PROTECTION Pemasangan klip pada mesh rapat
(VEGETASI) Media templok terekat glu dengan baik
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
METODE KERJA GALIAN TEROWONGAN
Ventilasi Udara Keluar Ventilasi Udara Masuk
Sump
Papan Info
Channel
Papan info Kotak P3K Sump
Tandon air
Water Pump
1 2 3 4
Surveying + Excav. Upper
Half Primary Erection Steel
Geological
Shotcrete Rib
Mapping + Muck Out
Excav. Bottom
Half Secondary Rockbolting Wiremesh
(Depend on
Shotcrete Geological Condition)
Installation
+ Muck Out
8 7 6 5
Placing Lean Concrete K-100 Install Invert Rebar, Dowel, Waterstop, and Formwork
Check Check
Check
Placing Invert Concrete K-225 Install Crown Rebar, Dowel, Waterstop, and Sliding Form Placing Crown Concrete K-225
Check
Check
Check
Check Slump and
Temperature
Check
Curing
Check
Curing
Install Trashrack
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
RISIKO (SESUAI METODE PEKERJAAN)
NO METODE KERJA IDENTIFIKASI BAHAYA RISIKO DAMPAK
1 Galian Terowongan 1. Terowongan Runtuh 1. Fatality Kerugian terhadap:
2. Steel Ribs terlepas/ jatuh 2. Cedera akibat terkena alat/ material 1. Biaya
3. Pecahan batu beton terlempar 2. Waktu
4. Terlanggar alat berat 3. Citra perusahaan
2 Proteksi Tebing 1. Pekerja tidak memakai APD 1. Fatality Kerugian terhadap:
2. Tebing Longsor 2. Pekerja jatuh dari tebing 1. Biaya
3. Tersambar petir 3. Pekerja cedera akibat tertimbun dan 2. Waktu
tersambar petir 3. Citra perusahaan
3 Lining Concrete 1. Terkena material beton 1. Cedera akibat terkena alat Kerugian terhadap:
2. Terlanggar alat berat 2. Terluka akibat terkena material 1. Biaya
2. Waktu
3. Citra perusahaan
4 Timbunan 1. Longsor 1. Fatality Kerugian terhadap:
2. Terlanggar alat berat 2. Cedera akibat tertabrak alat/ DT 1. Biaya
3. Tertabrak Dump Truck 3. Alat terperosok 2. Waktu
4. Terperosok 4. Cedera mata akibat debu 3. Citra perusahaan
5. Paparan Debu 5. Jarak pandang berkurang akibat debu
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
HSE PLAN (HIRARC)
KOORDINATOR
UMUM TANGGAP
DARURAT
Deskripsi Realisasi
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
KARYA INOVASI PROYEK
Desain awal pekerjaan proteksi tebing / slope galian adalah dengan melakukan shotcrete tebal 100
mm dengan perkuatan wiremesh dan rockbolt.
Pada perkembangannya desain proteksi tebing dengan shotcrete mengalami evaluasi dengan
mempertimbangankan faktor litologi dan geologi massa tanah pada Jalan Akses. Dari berbagai
pertimbangan berbagai macam tipe proteksi tebing ditetapkan penggunaan tipe proteksi dengan
metode vegetasi yang secara kontraktual dinamakan Slope Protection – Erosion Control (Vegetasi)
sebagai pengganti Shotcrete, tebal 100 mm.
Leader in Sustainable
PT WIJAYA KARYA (Persero) Tbk
Investments & EPC for Better @ptwijayakarya
www.wika.co.id
Quality of lIfe
WEBPAGE INFORMASI PROYEK
SCAN KODE QR
Sites.google.com/view/
engineeringmanikinpaket-1/
informasi-proyek
SCAN KODE QR
Sites.google.com/view/
hse-team-webage/home
Otomatis Update Otomatis Update Publikasi Online Publikasi Online
Statistik K3 Google Kalender HSE Campaign Kegiatan HSE
dari Database Excel PTW yang diizinkan
Hasil PDF
Dapat dilihat
Melalui HP
Dimana saja Notifikasi inspeksi dan
Kapan saja File PDF
dapat di print Link file PDF dikirimkan
ke Grup Telegram Update otomatis
secara otomatis di WEB HSE
Mengisi form Automasi data Export data ke Link file PDF yang dicetak dan Update Izin
Izin Kerja Online di GOOGLE dalam bentuk tersimpan dikirim-kan divalidasi Kerja yang telah
Online dengan SPREADSHEET Dokumen PDF ke Grup Telegram disetujui
GOOGLE FORMS (sesuai format) secara otomatis ke Register PTW
Otomatis
Update
Di Google
Calendar yang
terintegrasi ke
WEB HSE
Otomatis
Update
Register
Buku Tamu
Mengisi form Automasi data Mengirim PDF Online
Buku Tamu Online di GOOGLE ID Pass ke Email
GOOGLE FORMS SPREADSHEET Tamu
Register Tamu
Hari Ini
ID PASS
Berupa File PDF
Yang berisi
1. Nama Tamu
2. No. Telp Tamu
3. Tanggal Masuk
4. Masa Berlaku ID Pass
5. Nomor ID Card
6. Kode QR yag berisi data
Nama & Tanggal MAsuk
https://bit.ly/tamumanikin