Professional Documents
Culture Documents
83
26
99
24 68 26 55
29
22
23 90 26 67
27
23 23
RUAS 1
26 47
24 16
25 72
40
28
25 84
27 65
0.30 0.30
25 97
67
29
A 7.66 Ha 1.50 5.09 1.50
26 43
1 1
Q 3.233 m3/s 0.34
26 83
1 1
27 53
V 0.42 m/s
Y = 530000
0.5 0.5
b 3 m 1.75 1 1
28 16
h 1.75 m 3.00 28 90
U
0.25 0.10 Urugan kembali
i 0.0000475 0.05
3.45
k 70 0.30 0.30
m 0.5 G 1.00 0.80 1.00
A.1
w 0.34 m
1.00
0.30 0.30 Situasi Bangunan Pembilas B.Bi.1a
0.25 Skala 1 : 2000
0.86 10.00 0.86 0.39
+ 30.06 0.30
0.25 0.30
0.61
+ 29.00
0.45 1.00 0.80 1.00
+ 28.75 0.50 0.50
0.30
0.30
10.00 POTONGAN
0.50 0.50
B-B S,B
A R5.0 SECTION
3
POTONGAN
45°
A-A S,B
B SECTION
TP.3 0.50 0.50
30 11
0.86
28 0.30
46
0.30
1.00
+ 30.06 0.25
2.50
1. B 0.60 0.60
1.67
00
+ 30.06 2.14
0. + 29.10
80 POTONGAN 0.30
1. D-E S,B
0.40
00 SECTION 0.40
+ 30.06
7.85
c 1.00 1.40 1.00 1.40 1.00
1.00
POTONGAN
C-C S,B
SECTION
1.50
TM
10.00
0.80
+ 28.75
1.50
+ 28.14
TP.2
TA
c 45°
D 44
.7
1
27 85
0.40
+ 30.06
0
0.0
27 83
R1
0.61
0.25
0.20
0.30
0.30
8.35
27 73
TP.A D E
DENAH
S,B
PLAN 0.20
0.20
A 0.15
0.20 0.55
5.00 0.90 1.00 10
.3
50 2
2.
0.30 27 66
1.00
+ 30.06 + 30.06
0.30
1.06
+ 29.00 + 29.10
+ 28.75
0.40
+ 28.14
2.
0.40
41
4.53 2.95 0.90
0.50 0.50
27 02
0 4 8 12 16 20 m
POTONGAN SCALE A
O-F S,B SCALE a, 1 : 200
0.24 SECTION F
0.11
0.20 SCALE B 0 2.5 5.0 7.5 10.0 m
0.90 1.00 1.00 3.95 2.00
Scale 1:100
+ 30.06
0.34 SCALE C 0 1.0 2.0 3.0 4.0 5.0 m Propinsi :
SULAWESI TENGAH
+ 29.00 + 29.10 Scale 1:50
1.75
Pekerjaan :
+ 28.75
SID. DI. BINSIL (1.200 HA)
0.30 0 0.5 1.0 1.5 2.0 m KABUPATEN BANGGAI
+ 27.95 SCALE D
0.30 Scale 1:20 Gambar : Kabupaten :
Saluran Kantong Lumpur BANGGAI
(N)
Bangunan Pembilas No Register : 1 - 01 - 01 - 22
3.95 2.00
4.86 0.50 No Lembar : 6/6
0.40
POTONGAN Tanggal Nomor Kontrak :
O-G S,B
SECTION Pelaksana Teknis : Weri Warsoma, BE
11 Maret 2013 HK.02.03/P&P/BWS.SUL.III/259/2013
Disetujui Direksi : Ariesto Krestiadi, ST.,M.Eng
No.Rev Tgl Yang Direvisi Revised Oleh Direnc Diset PPK Pernc & Prog BWS Sulawesi III : Radia Zulfikar, ST.,MT