3 PRV1 160 PVC 100 2 RAVEPP4" 100 RAFD4" 100 TYPE D4 160-100-2-RAVEPP4"-RAFD4" KNPIWSP-G-105-04-C-018
Girakaduwa
4 PRV2 90 HDPE 50 1 DirectPRV1" 25 TYPE B1 90-50-1-DirectPRV1" KNPIWSP-G-105-04-C-012
5 Udathalawinna PRV1 225 HDPE 150 1 RAFD6" 150 TYPE E1 225-150-1-RAFD6" PRV1 KNPIWSP-G-101-04-C-031
6 PRV1 160 HDPE 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" PRV1 KNPIWSP-G-106-04-C-003
Dunuwila
7 Pathadumbara PRV2 63 HDPE 50 2 RAVEPP2" 50 RAF2" 50 TYPE A4 63-50-2-RAVEPP2"-RAF2" PRV2 KNPIWSP-G-106-04-C-017
8 PRV-1 (PRV 3 in LSs) 63 HDPE 50 2 RAVEPP2" 50 DirectPRV1" 25 TYPE A3 63-50-2-RAVEPP2"-DirectPRV1" PRV 3 KNPIWSP-G-102-04-C-021
9 PRV-15 (PRV 1 in LSs) 160 HDPE 100 1 RAF4" 100 TYPE D2 160-100-1-RAF4" PRV 1 KNPIWSP-G-102-04-C-033
Doragamuwa
10 PRV-17 (PRV 4 in LSs) 63 HDPE 50 1 DirectPRV1" 25 TYPE A1 63-50-1-DirectPRV1" PRV 4 KNPIWSP-G-102-04-C-058
12 PRV 6 225 HDPE 150 2 RAVEPP6" 150 RAFD6" 150 TYPE E2 225-150-2-RAVEPP6"-RAFD6" PRV 1 KNPIWSP-G-104-04-C-018
Wattegama
13 PRV 7 160 HDPE 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" PRV 2 KNPIWSP-G-104-04-C-021
16 Rambuke Ela PRV3 63 HDPE 50 2 RAVEPP2" 50 RAF2" 50 TYPE A4 63-50-2-RAVEPP2"-RAF2" PRV3 KNPIWSP-G-201-04-C-046
19 Vilana Udagama PRV1 63 HDPE 50 2 RAVEPP2" 50 DirectPRV1" 25 TYPE A3 63-50-2-RAVEPP2"-DirectPRV1" PRV1 KNPIWSP-G-202-04-C-021
20 PRV1 160 HDPE 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" PRV1 KNPIWSP-G-203-04-C-042
32 PRV-1 90 HDPE 50 2 RAVEPP2" 50 RAF2" 50 TYPE B4 90-50-2-RAVEPP2"-RAF2" PRV1 in a existing line(no LS)
41 PRV-4 160 HDPE 100 2 RAVEPP4" 100 RAFD4" 100 TYPE D4 160-100-2-RAVEPP4"-RAFD4" PRV12 KNPIWSP-G-402-04-C-009
52 PRV1 160 HDPE 100 2 RAVEPP4" 100 RAFD4" 100 TYPE D4 160-100-2-RAVEPP4"-RAFD4" PRV2 KNPIWSP-G-404-04-C-059
53 PRV2 225 HDPE 150 1 RAFD6" 150 TYPE E1 225-150-1-RAFD6" PRV4 KNPIWSP-G-404-04-C-144
55 Godahena PRV4 160 HDPE 100 2 RAVEPP4" 100 RAFD4" 100 TYPE D4 160-100-2-RAVEPP4"-RAFD4" PRV5 KNPIWSP-G-404-04-C-022
59 PRV-1 160 HDPE 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" PRV1 KNPIWSP-G-401-04-C-035
60 Pujapitiya PRV-2 225 HDPE 150 1 RAFD6" 150 TYPE E1 225-150-1-RAFD6" PRV2 KNPIWSP-G-401-04-C-021
61 PRV-3 160 HDPE 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" PRV3 KNPIWSP-G-401-04-C-014
Annex
PRV Installation and Location Details
Material Diameter of Pressure
Diameter of SelectedPRV-Stage-01 SelectedPRV-Stage-02
of PRV Main Reduce PRV Installation PRV Location
PRV Distribution bymanufacture bymanufacture
No Division Distribution zone Main pipe Pipe Stage
Number in the model
PRV Number
(mm) (mm) stage Model DN Model DN Installation Type No LS Drawing No
in LS
62 Kurundugahamada Upper PRV 1 110 HDPE 80 2 RAVEPP3" 80 RAFD3" 80 TYPE C2 110-80-2-RAVEPP3"-RAFD3" PRV 1 KNPIWSP-G-304-04-C-032
63 PRV1 160 HDPE 100 2 RAVEPP4" 100 RAFD4" 100 TYPE D4 160-100-2-RAVEPP4"-RAFD4" KNPIWSP-G-303-04-C-004
64 Kurundugahamada lower PRV2 160 HDPE 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" KNPIWSP-G-303-04-C-005
66 Uduwawla PRV1 160 PVC 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" PRV1 in a existing line(no LS)
67 PRV1 160 HDPE 100 2 RAVEPP4" 100 RAFD4" 100 TYPE D4 160-100-2-RAVEPP4"-RAFD4" PRV1 KNPIWSP-G-301-04-C-007
Harispaththuwa
68 PRV2 90 HDPE 50 2 RAVEPP2" 50 RAF2" 50 TYPE B4 90-50-2-RAVEPP2"-RAF2" PRV2 KNPIWSP-G-301-04-C-044
69 PRV3 160 HDPE 100 1 RAFD4" 100 TYPE D3 160-100-1-RAFD4" PRV3 KNPIWSP-G-301-04-C-017
74 PRV-13 300 HDPE 150 2 RAVEPP6" 150 RAFD6" 150 TYPE F1 300-150-2-RAVEPP6"-RAFD6" in a existing line(no LS)
79 KFG Hanthana call link PRV2 63 HDPE 50 1 RAF2" 50 TYPE A2 63-50-1-RAF2" KNPIWSP-G-501-04-C-019