Book 2 Section 02 Exhibit A Work Breakdown
Book 2 Section 02 Exhibit A Work Breakdown
Project Management Final Design Drainage System Removals Erosion Control Fire Suppression System Electrical System
• Codes and Standards Analysis • Pipe System • Wet standpipe piping and valves • Switchgear
Safety Management Asphalt Permitting
• Design Baseline Report • Valve System • Distribution valves, piping and nozzles • Generator
• Requirements Traceability Matrix • FFSS control and monitoring system • Uninterruptaqble power supply
• CFD Analysis Report Containment Tank • Power distribution
Barrier Wetland Mitigation
Quality Control
• Design plans and specifications Water Supply System
Tunnel Equipment
Building(s)
Design Support During • Storage tank
Construction Utilities
Quality Assurance • Water supply piping, valves and appurtenances
• Water filtration system
• Design As-Builts Landscaping • Water supply pump(s) and controls Testing and
Commissioning
• Construction • Water supply system monitoring and controls
Request for Proposals - Book 2 Section 2 Exhibit A Exhibit 2.2.A-1 January 13, 2014