JARAK PANDANG

vr/v = 70
JARAK PANDANG MENYIAP

Dik = ti = 2.12 + ( 0.026 *


m = 15 km/jam
a = 2.051 + ( 0.0036 *
t2 = 6.56 + ( 0.048 *
vr = 70 km/jam

ti = 2.12 + ( 0.026 *
m = 15 km/jam
a = 2.051 + ( 0.0036 *
t2 = 6.56 + ( 0.048 *

JPM = D1 + D2 + D3 + D4

D1 = 0.278 * ti * ( v -

= 0.278 * 3.94 * ( 70 -

= 65.2119682612 m

D2 = 0.278 * v * t2

= 0.278 * 70 * 9.92

= 193.0432 m

D3 = 30 s/d 100 m

= 50

D4 = 2 * D2
3

= 2 * 193.0432
3

= 128.6954666667 m

JPM = 65.2119682612 + 193.0432 + 50 + 128.69547

= 436.9506 m
JARAK PANDANG HENTI

Dik = t = 2.5 detik


g = 9.8 m/dt2
f = 0.3 s/d 0.4
= 0.4 (dipakai)

JPH (D) ® D = ({ v } *
3.6

= ({ 70 } *
3.6

= 48.6111111 + 48.225309

= 96.8364198 m

RUANG BEBAS SAMPING

E = R1 * ( 1-COS * ( 90
( 3.14

R1 = RC - ( 0.5 *

= 410 - ( 0.5 *

= 408.25 m

E = 408.25 * ( 1 - COS *

= 408.25 * 1 - COS * 6.7696736

= 408.25 * 0.006972

= 2.8463
v )

v )
v )

70 ) 3.94
15
70 ) 2.303
70 ) 9.92

m + a * ti )
2

15 + 2.303 * 3.94 )
2
t ) ( v ) 2
3.6
2*g*f

2.5 ) ( 70 ) 2 19.444444 378.08642


3.6
2 * 9.8 * 0.4 48.2253086419753

* JPH )
* RC

LEBAR LAJUR )

3.5 )

( 90 * 96.83642 )
( 3.14 * 410 )
7.84

48.2253086419753
1. DATA
ELEVASI RENCANA STASIUN gak usah ditulis
1 35.0000 0+000 0
PPV 1 7.0000 0+730,01 730.01
PPV 2 23.7260 1+325,48 1325.4800 595.4700
PPV 3 4.8780 1+960,32 1960.32 634.8400
73 16.5000 2+661,02 2661.02 700.7

2. KELANDAIAN (g)
g = elv PPV - elv sebelumnya * 100
Jarak

g1 = 7.0000 - 35.0000 * 100


730.01

= -3.8356 %

g2 = 23.7260 - 7.0000 * 100


595.47

= 2.8089 %

g3 = 4.8780 - 23.7260 * 100


634.84

= -2.9689 %

g4 = 16.5000 - 4.8780 * 100


700.7

= 1.6586 %

3, DETAIL ELINYEMEN VERTIKAL


ELEVASI PPV 1 = 7.0000

STA PPV 1 = ( elv PPV - elv sblmnya )

= ( 7.0000 - 35.0000 )

= -28.0000 2 + 730.01 2

= 784.0000 + 532914.6001

= 533698.6

= 730.5468 M
D1 = [ ( g2 - g1

= [ ( 2.8089 - (

= 6.6444 %

ELEVASI PPV 2 = 23.7260

STA PPV 2 = ( elv PPV - elv sblmnya )

= ( 23.7260 - 7.0000 )

= 16.7260 2 + 595.47 2

= 279.7591 + 354584.5209

= 354864.3

= 595.7049 M

D2 = [ ( g3 - g2

= [ ( -2.9689 - (

= 5.7778 %

ELEVASI PPV 3 = 4.8780

STA PPV 3 = ( elv PPV - elv sblmnya )

= ( 4.8780 - 23.7260 )

= -18.8480 2 + 634.84 2

= 355.2471 + 403021.8256

= 403377.1

= 635.1197 M

D3 = [ ( g4 - g3

= [ ( 1.6586 - (

= 4.6276 %
4, PERHITUNGAN PANJANG LV
LVn = D 2 * DN
398

LV1 = D 2 * DN
398

= 96.8364 2 * 6.6444
398

= 9377.2922 * 0.0167

= 156.5498 M

LVn = D 2 * DN
398

LV2 = D 2 * DN
398

= 96.8364 2 * 5.7778
398

= 9377.2922 * 0.0145

= 136.1312 M

LVn = D 2 * DN
398

LV3 = D 2 * DN
398

= 96.8364 2 * 4.6276
398

= 9377.2922 * 0.0116

= 109.0302 M

PERHITUNGAN TITIK PUNCAK


Evn = DN * LVn
800

Ev1 = D1 * LV1
800
= 6.6444 * 156.5498
800

= 1.3002 M

Evn = DN * LVn
800

Ev2 = D2 * LV2
800

= 5.7778 * 136.1312
800

= 0.9832 M

Evn = DN * LVn
800

Ev3 = D3 * LV3
800

= 4.6276 * 109.0302
800

= 0.6307 M

5. PERHITUNGAN PVC & PVT


INPUT DATA
ELEVASI PPV 1 = 7.0000
STA PPV 1 = 730.01
PANJANG LV 1 = 156.5498
g1 = -3.8356 %
g2 = 2.8089 %

MAKA =

ELEVASI PVC 1 = ELV PPV 1 - ( g1 *


100

= 7.0000 - ( -3.8356 *
100
= 7.0000 - -3.0023

= 10.0023 M

STA PVC 1 = STA PPV 1 - ( 0.5 *


= 730.01 - ( 0.5 *

= 730.01 - 78.2749

= 651.7351 M

ELEVASI PVT 1 = ELV PPV 1 + ( g2 *


100

= 7.0000 + ( 2.8089 *
100

= 7.0000 + 2.1986

= 9.1986 M

STA PVT 1 = STA PPV 1 + ( 0.5 *

= 730.01 + ( 0.5 *

= 730.01 + 78.274915119151

= 808.2849 M

INPUT DATA
ELEVASI PPV 2 = 23.7260
STA PPV 2 = 1325.48
PANJANG LV 2 = 136.1312
g2 = 2.8089 %
g3 = -2.9689 %

MAKA =

ELEVASI PVC 2 = ELV PPV 2 - ( g2 *


100

= 23.7260 - ( 2.8089 *
100
= 23.7260 - 1.9118767726419

= 21.8141 M

STA PVC 2 = STA PPV 2 - ( 0.5 *

= 1325.48 - ( 0.5 *
= 1325.48 - 68.0656

= 1257.4144 M

ELEVASI PVT 2 = ELV PPV 2 + ( g3 *


100

= 23.7260 + ( -2.9689 *
100

= 23.73 + -2.0208

= 21.7052 M

STA PVT 2 = STA PPV 2 + ( 0.5 *

= 1325.48 + ( 0.5 *

= 1325.48 + 68.0656

= 1393.5456 M

INPUT DATA
ELEVASI PPV 3 = 4.8780
STA PPV 3 = 1960.32
PANJANG LV 3 = 109.0302
g3 = -2.9689 %
g4 = 1.6586 %

MAKA =

ELEVASI PVC 3 = ELV PPV 3 - ( g3 *


100

= 4.8780 - ( -2.9689 *
100
= 4.8780 - -1.618519060129

= 6.4965 M

STA PVC 3 = STA PPV 3 - ( 0.5 *

= 1960.32 - ( 0.5 *

= 1960.32 - 54.5151

= 1905.8049 M
ELEVASI PVT 3 = ELV PPV 3 + ( g4 *
100

= 4.8780 + ( 1.6586 *
100

= 4.8780 + 0.9042

= 5.7822 M

STA PVT 3 = STA PPV 3 + ( 0.5 *

= 1960.32 + ( 0.5 *

= 1960.32 + 54.5151

= 2014.8351 M
YANG INI DITULIS LANJUTAN TUBES GEOOO

2 + Jarak 2

2 + 730.01 2
) ]

-3.8356 )) ]

2 + Jarak 2

2 + 595.4700 2

) ]

2.8089 )) ]

2 + Jarak 2

2 + 634.84 2

) ]

-2.9689 )) ]
0.5 * LV 1 )
100

0.5 * 156.5498 )
100

LV1 )
156.5498 )

0.5 * LV 1 )
100

0.5 * 156.5498 )
100

LV1 )

156.5498 )

0.5 * LV 2 )
100

0.5 * 136.1312 )
100

LV1 )

136.1312 )
0.5 * LV 2 )
100

0.5 * 136.1312 )
100

LV1 )

136.1312 )

0.5 * LV 1 )
100

0.5 * 109.0302 )
100

LV1 )

109.0302 )
0.5 * LV 1 )
100

0.5 * 109.0302 )
100

LV1 )

109.0302 )
ELEVASI RENCANA STASIUN
A 121 0+162 M 162
PPV 115 0+300 M 300 138
B 119 0+506 M 506
3
1 DATA
ELEVASI RENCANA STASIUN
1 35 0+000
PPV 1 7.7564 0+316,66 316.66
PPV 2 35.2 0+815,33 815.33 498.67
PPV 3 5.2863 1+161,55 161.55 337.12
95 20.9 1+537,32 537.32 375.77

2 KELANDAIAN (g)
g1 = 115 - 121 100
*
162

= -6 * 100
162 4
= -0.037037 * 100
= -3.703704

g2 = 119 - 115 100


*
138

= 4 * 100
138 PERHITUNGAN TITK P
= 0.0289855 * 100
= 2.8985507

g3 = 5.2863 - 35.2 100


*
337.12

= -29.9137 * 100
337.12
= -0.088733 * 100
= -8.873309

g4 = 20.9 - 5.2863 100


*
375.77

= 15.6137 * 100
375.77
= 0.0415512 * 100
= 4.1551215
3 DETAIL ELINYEMEN VERTICAL
ELEVASI PPV 1 = 7.7564

= ( 7.7564 - 35 ) 2

= 101015.77
= 317.82978

D1 = g2 - g1

= 2.8985507 - -3.703704

= 6.6022544
DETAIL ELINYEMEN VERTICAL
ELEVASI PPV 1 = 115

= ( 115 - 121 ) 2

= 90036
= 300.0600

D1 = g2 - g1

= 2.89855072 - -3.703704

= 6.60225443

PERHITUNGAN PANJANG LV
LV1 = 100 2 * 6.6022544
398

= 10000 * 0.0165886

= 165.88579

PERHITUNGAN TITK PUNCAK


EV1 = 6.60225443 * 165.88579
800
= 1.36902524
+ ( 316.66 ) 2
5 PERHITUNGAN PVC & PVT
ELEVASI PPV 1 = 115
STA PPV 1 = 300
+ ( 300 ) 2 PANJANG LV 1 = 165.88579
G1 = -3.703704
G2 = 2.8985507

ELEVASI PVC 1 = 115

= 115

= 115

= 118.07196

STA PVC 1 = 300

= 300

= 217.05711
UNGAN PVC & PVT

- ( -3.703704 * 0.5 * 165.88579 )


100
- -307.1959
100
- -3.071959

- ( 0.5 * 165.88579 )

- 82.942895
ELEVASI PVT 1 = 115 + ( 2.8985507 * 0.5 *
100
= 115 + 240.41419
100
= 115 + 2.4041419

= 117.40414

STA PVT 1 = 300 + ( 0.5 * 165.88579 )

= 300 + 82.942895

= 382.94289
165.88579 )