You are on page 1of 37
Item No] Office of the Project Director, MPPWD(PIU) NIRMAN BHAWAN, BHOPAL SCHEDULE OF RATES FOR BUILDING WORKS (We.f. 01.08.2014) fERRATA/AMMENDDMENT/ADDENDUM No.3) ‘Slowins tem is here by added in Bullaing SOR wes 182014 na ates shall be date of issue of this order ie. .a6.042018, CHAPTER NO, 14 HH Repairs to Building Work Tear Beseription ‘Oy ‘applicable with effect fom the iat wcting a ear ete Big ont wal penctating rar goer nce Sing ona bars ring driting for insaing Pets ee. cone ee 5 nevis GTi Ma pas and ComcRae WOR DF ae ipa ner bcskar ibout damaging dhe stuctue av tmameey engine in aR Taga (orcement Wit wire rolary wife brash ‘making the surfaces fro al dis. ex complete. applying two coats of shale vel te rancor nfemingw ASTMA. 117, 0n the rb icang cleaning} oe fimloremen, wicbrushing to renaw nse nit cpl wine ‘nerve ot one Rou btwesn the oats as rsa y engineer choos aa ToD or acuCae eens io witoremecatng SGP Nor RB ‘application ede wa {PNET RB (CORI Know hos) on eapne rast so} sta ey eng me nina fir Rous etveen each oa, en stl be by brush ony san Ban | Ty a Teor] [Duildi-y up the profile of sractnal members ‘9 using latex 132 moditied air cura Pach 1O 09, mae SE Comet pr ara leaned pe ea eka ee tex morar by weiht cement stare reey pt 30 min thickness clung leveling profiting ee. empl, a rel j fron io machine wo recive out of grating pe Tf inside the bois by Sete, Sine &ping oF easaely BORG WORSE wie nine} Jonerete at all evs wit siteted including tomer Je eae ine & miving ying esting, an ng ‘ncading ewring Ie. complete sel rainforcamoni shall be pad seen ia 8 Fee Teton svaks in RC members age ‘dking Bol av emt; 8 100m dep hols in rata! nace ee imservals oF 00 e| ren in Sepeeed manner or a> dnccisd by ne eee RC siructurall na kang of bles: by air er wort nine ee fixing of ruzster Pare mi ln aries inetd Iie, eres oy zctes to be Iain RP SONS ay to ser cones sahara system J rinimum 12 hours Cuting of mzates Cats Dovales by chisel alter completion [Grouting Tjecing Tow vscoas Monopot hy. presse ig Miter coments pa ‘8 sastretion by weigh bactinl sinain desinad pressure inthe gu Pit compreNor mins the pressure at exit (3 ay ke’em) by monitoring hemes ca ae io the mati dou eed Rese sy, structs lelemens st its refusal, [Monitor tekages thresh requirement & ow Tie (Wem No] “Tem Description — Unt | Oy | Rateio | Bs | [Sina RR ing ny ee eg in is) 00 of HF Ven enovny ah one ser runing sh df! wma 28m Jadu ete. complet. Profiling: Appiving compatibe primer on prepared sutra Filling the holes and uneven surface with taixouopie pty etc. complete (Moe o lmcasurement: Application of ier area not srface sa), THY irsaihening stctund’ arent wilt on metallic compost ber wrapping pst comprise of fst sit and compatible satan, by dry wet layup sen elaine. seeping the tee sheet to several clement at desir ovcntation using} amping eller to avoid any air Voids ete. cepeat the smme proxcdre For multiple leyersiifeny) with she icra of & hrs. sand pasting: applying second ena of Jssturant fer einimum 12 hous, retfy air voids fay pate the river sand oni io make surface rough to tke any further Finishes (Mode of measurement: surface] larva of fibor consumed) ' TT POTN Cater =o sea 2 400 GSM Carhon UD i a0 1345.00, BOGEN Carbon OD om 06 4 [960 GSM Carbon UD iz ‘sain 7200.00, 1200 GSM Curdon UD sq $500.00 ji GRRE Carbon Angle yap Te Tisha Providing applying procured laminate wih compaubie structural adhesive! rt Fnctaing Stic preparation: grinding coerde borat, cleaning wi wi sh removing i nance if presents. comps Pring: pling serpatn rnb pepe subs ling Hales noose uae With | etna ome Ago fk: Mn aay fw stuust clement, eating the plate to ree se, sping comasic | | structural adhesive on plate in parabolic manner. paste the plate un desive area by eg tmnpingrikr to ved ony ar olds ee. comple Sand posing: Apia Sond cot of satan ater 12 rei ar ois anypasts he vr Sn | Saito cake surfccough oak any futher ses (Mods measurement a | Jeong meter of plate piel) (CT sm wi an cco aE ND a ~— HIE722 [Teta wide an ri ick con laaate NPE it i006 TA [im wil an wm ik aon aa NPS me init TEE [tn wide and 42 in Wik cas ate NFS = co TEATS Prion sappgne dain Sea pak Wh wad) Hckding wings Gey wear || RO ete_complet.(10Qeum wide & 6 mr th.) TALE [Providing & appising structural eposy ouhewNe poly for leveling of surges und) Kae lesmectng alumina plate whi ever regu 74.75 [Providing & fixing mechanical preswess anchor aluminum plate (high wrade)| ~ each Hiv | Isysem for fixing of eathon laminates at specify location st he ent of carbo laminate as per vesign. ( Pha size 20027012 mun with 6 nos M12 & M6) lanchors each) Providing and placing i postin procuncd Tiber bars wih compatibe srostarl lahesive including, groove making, Surface preparation, cleaniny it with wits ish removing oi, lavance af presen, ele complete. Profiles: Applsing| [compatible primer on prepared substrate, Filtig the ales and uneven swace with lisotronic pty ts. complete. Application ops: cutting the bers to require size. applying compatible structural adbasve on ars, place the bars in desire lemces ele. complee. eesiy ale voids i ay paste the river sand on it wo mak| Surface rough 1 tke my further nishes (Mode of measinemvent: Per ann lof bar anplied) [TR7RT Pn ia cxrbon eek ‘neice 150800 cm Description ait Tate in em Nol Tem Deseripi a Oy | [Providing and fiaing in position over fiber “parfice Tiber anchors having 100 mml each | se iad wth minima # fiber elon ber wrapped surfs in staggered ane [fitting dingo, te copie Cho ie anshor | [AE [Providing an paying cot o resist FO Contig fared side ove] am 3.00 ber applied sure inching reparation, application of sale priming eo L = é Ap AK 6-4-8) Project ffirector 1th WD PIY Bhopal Endt No, F-64-10/2018/Common SOR/Building/W/PD!& 5 Bhopal,Date 06 04/2017 e Copy is forwarded to:- 1. PAto Hon'ble Minister. M.P P.W.D. Bhopal 2. The Principal Secretary to Govt, of M.P.P.W.D.Bhopat 3. The Secretary to Govt. of M.P.P.W.D, Bhopal 4, The Enginees-in ~Chief, M.P.P.W.D. Bhopal 5. The Chief Technical Exeminer, M.P. Bhopal 6 ‘The Principal Secretary to Govt. OF MLP. Housing & Environment Bhopal. The Accountant General, M.P, Gwalior/Bhopal. 8. The Secretary to Hon'ble Lokayukta, M.P, Bhopal 9. The Chief Engineer, P.W.D MP. The Additional Project Director P.W.D. (PIU) MP, ‘The Chief Engineer, M.P. R.D.C. Bhopal, 12, “The Chief Engineer, Rural Engineering Services, MP. Bhopal 13, ‘The Divisional Project Engineer M.P. PWD 14, ‘The Executive Engineer, MP P.W.D, Division 15, Chai man, Contractor Association, MP Bhopal An c 6 H-22lh Projecf\Director ee Bhopal QEFICE OF THE PROJECT DIRECTOR MPPWD(PIU) NIRMAN BHAWAN, BHOPAL SEHEDULE OF RATES FOR BUILDING WORKS (w.e.f. 01.08.2014) (ADDENDUM No.2 ) The following items are added as under in Building SOR wet 1/8/2014 and rate shall be applicable with sffest from the date of issue ofthis order ic, 07 O42018 i $42 [Providing and fh ing sheet [sores os per design. i | Newasbestos cement bonded particle Board Gram Thick as por 1S 114276 _ a e = t | covering over expansion joitits with ron [SNe Teme Bovapion = + —__ Chapter § (Reinforced Consrete Cement na | 1 150 mm w a ___| metre | 96.00 200 mm wide | metre | 130.00 | Chapter 9 (Wood Work and PVE Works | Providing and fixing partition upto ceiling height consisting of G.1, | frame and required boatd, including providing and fixing of frame mmm and 0.50 mm thick, fixed to the floor and ceiling at the spacing | | oF 610 mm centre to centre with dash fastener of 12.5 mm din meter | | 30 mm Iength or suitable anchor fastener or metal screws with i nylon plugs and the studs 48 mm wide having one flange of 34 man i other Hange 36 mm and 0.50 min thick fixed vertically within j | Manges of floor and ceiling channel and placed at a spacing of 610 ! | mm centre to centre by 6 min dia bolts and nuts including fixing of | | studs along both ends of partion fixed Tush to wall with suitable | | anchor fustener or metal screws with nylon plugs at spacing of 450 i mm centre to centre, and fixing of boards to both side of frame i | work by 25 mm long dry wall screws on studs, floor and ceiling vey | Channels atthe spacing of 300 mm centre to centre, The boards are to be Fixed to the frame work with joints stagpered t0 avoid through i / Sracks, G.I Jixing channel of 99 mm width (0.9 mm thick having | 8X0 flanges of 9.5 mm each) to be provided at the horizontal joints | of wo boards, fixed to the studs using metal to metal flat head i i Screws, including jointing and finishing to a flush finish with | ‘scommended jointing compound, jointing tape, angle beads at i | Corners (25 mm x 25 mm x 0.5 mm), joint finisher and tWo coats of | Primer suitable for board as per’ manufacture’s specification | | complete as per direction of engineer in charg See 66 am overall thickness paniion using & mam thick doubl eee nowrasbestos muliipurpose termite proof, highly fire & moisiwe resistance cement bonded particle board as per IS: 14276 with Suitable cement bonded board screws a | | 9141670 mm overall thickness Partition using 10 mm thick double skin | sqm’) 1359.00 Ron-asbestos multipurpose termite, fire & moisture resistance | / (cpustic 30db) cement bonded particle board as per IS: 143Ve L with suitable cement bonded_board screws, we a) _ Paget ora 9.142 Providing and fixing, in postion concealed Gl. section for wall 7 1 j Paneling using board of required thickness fixed on the ‘W" profile | | (255 mm thick) having a knurled web of 51.55 mm and two flanges of | 26 mim each with lips of 10.35 mm placed @ 610 mm C/C in perimeter i channel having one flange of 20 mini and another flange of 30 mm with thickness of 0.55 mm and web of length 27 mm. Perimeter channel is _ lixed on the floor and the ceiling with the nylon sleeves @ 610 mm C/C | | Nith fully threaded self tupping dry wall serews, Board is fixed to the; | | | AV. profile with 25 mm countersunk ribbed head serews @ 200 mu vi ee it tt ; a 1 |the lolnts of the boards are finished with specially formulated jointing | compound and 48 mm side jointing tape to provi i a oe | 8 mm thick Non-asbestos multipurpose, termite. | | 674.00 recistance cement bonded particle hoard as per IS: 14276 with suitable 2958595 mm in true horizontal level suspended on inter locking metal food | brid of hot dipped galvanized steel sections (galvanized @ 120 grams! ij | \ Sam oth side inchusive) consisting of main "I runner with sultably | spaced joints to get required length and of size 24x38 mm made from | | '0.30 mm thick (minimum) sheet Spaced at 1200 mm center to center { | _ and cross °T” of size 2425 mm made of 0.30 mm thick (minimums) | _ Sheet. 1200 mm long spaced between main “F" at 600 mm center to t i | fener to form a grid of 1200x600 mm and secondary cross "T" of | Hl length 600 mm and size 24x25 mm made of 0.30 mm thick (minimum) | | " sheet to be interlocked at middle of the 1200x600 mm panel to form | | | i urids of 600x600 mm and wall angle of size 24x24x0.3 ram and laying | [fale exiting tiles of approved texture in the grid including, requied | i Cuting/making, opening tor services like diffusers, grills, light fittings, | | stares, smoke detectors ete, Main "I" runners to be suspended from | | ceiling using Gi slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to 1 j | | ceiling with 12.5 min dia and $0 mm long dash fasteners. 4 man Gt) | qiustable rods with galvanised batty level clips of size 85. ¢ 40. | \ | O80 mmm spaced at [200 mm center to genter along main T. bottom | [exposed width of 24 men of all T-scetions shall be pre-painved with | i Rolvester paint, all complete for all heights as. per specifications, | ~_ drawings and as directed by Engincer-in-charge a +18 mm thick non- asbestos -m ipurpose,termite, fire & “Histare | ; |Tesistance cement bonded. particle board as per 1$-14276, white primed | 5958595 mm. i ick “non- asbestos multipar pose.termite, woisture | | Tesistance cement bonded particle board as per IS:14276, white primed | { color tiles of size 595x395 mm, i i 510.00 Page 2 of 4 i | Supply and ins of termite prook, moisturelfite resitant a \ 5 | bonded particle board confirming to 18:14276: 1995 in wall panels of | ‘ exivttial faces of galvanized cold formed light gauge steel frame | structure to form wall/partition wall on extemal face of the frame fixed | with the self drilling’tapping screws/fusterners of appraved make. The | hollow wall space between two cement particle board provided with | | Somm thick resin bonded glass wool insulation confirming to 15:8183 | and of density not less than 48Ky/eum (glass wool insulation shall be aid separetly). AMl exterior faces of the wall/trame shall essentially be | Bay provided with breathable vapour barrier underneath of the cement boanded particle board. The installation of the vapour barrier should | confirm to the provisions of the international building code 2009 and as er the design. The joints of the cement boards must be sealed with i polymer modified thin set mortar confirming to ANSI A. 118.4 | Standards and self adhesive alkalai resistant dry wall fiber mesh tape of | minimum 100 mm width. All exterior wall comers of cement bonded particle board wall panels must be reinforced with galavanized metal i angles of 100x100x1.09 mm thickness and fixed on both adjoining ' Walls with self drilling/tapping fastners of approved make as per design _ineluding providing selicon gel caulking complete in all respects. | Cement Bonded particle board as per IS = 14276 10 mim Thiek cement Bonded particle board as per IS: 14276 Supply and installation of termite prook moisture/fire resitant cement? i | bonded particle board confirming to 1S 14276: 1995 in wall panels on | both faces of galvanized cold formed light gauge steel frame structure “to form wall/partition wail on internal face of the frame, fixed with the a self drillingitapping serews/fastemers of approved make. The hollow wall space between two cement particle board provided with 50mm. thick resin bonded giass woo! insulation confirming to IS 8183 and of i | density not less than 48Kp/cum (glass wool insulation shall be paid i | separetly). The joints of the cement boards must be sealed with polymer i ) modified thin set mortar confirming to ANSI A 118.4 standards and | | | self adhesive alkalai resistant dry wall fiber mesh tape of minimum 100 j mm width, AIl interior wall comers of cement bonded particle board | Nall panels must be reinforced with galavanized ungular metal steips of 28x25x0,50 min thickness and fixed on both adjoining walls with self’ j | drilling/tapping fastners of approved make and provided with 100 mm | wide ber mesh tape covering inall respects, cement bonded particle board as per bonded particle board ¢ re fabricated Bulking) ____—_,—~ \ 487.00, F4-TAY Proj Director jpwo PIU Bhopal Page 3 of 4 Endt. No. F-64-10/2018/Common SOR/Building/W/PD/ys — Bhopal,Date 07/04/2017 Copy is forwarded to:- PA to Hon'ble Minister,M.P P.W.D, Bhopal The Principal Secretary to Govt. of M.P.P.W.D.Bhopal \¢ Secretary to Govt. of M.P.P.W.D. Bhopal - ‘The Engineer-in —Chief, M.P.P.W.D. .Bhopal The Chief Technical Examiner, M.P. Bhopal. 4 3 6. The Principal Secretary to Govt. Of M.P. Housing & Environment Bhopal 7. The Accountant General, M.P. Gwalior/Bhopal. 8 The Secretary to Hon'ble Lokayukta, M.P. Bhopal. 9. The Chief Engineer, P.W.D. ~ M.P. 10. The Additional Project Director P.W.D. (PIU) -- 11. The Chief Engineer, M.P. R.D.C. Bhopal 12. The Chief Engineer, Rural Engineering Services, M.P. Bhopal 13. The Joint Project Director o/o Project Director PWD PIU Bhopal 14. The Divisional Project Engineer M.P, PWD --------+--- 15. The Executive Engineer, MP P.W.D. Division 16. Chairman, Contractor Association, MP Bhopal 17. PA Project Director PWD PIU Bhopal K ZIAD ProjectiDirector Pwo PIU Bhopal Page dof 4 OFFICE GF THE PROJECT DIRECTOR Ivebwo(ru Ran AWA, OPAL Scieoute OF RATES FOR UKDING WORKS ua. 0.08 7016) [Eaten ADDENDUM Ne 33 The etlowing SOR ating SoM wo 8/2014) Adena aur an chal ppsbieth recive ome ata sue ofthe ordre 1.4 2008 Chapren no 27° MISCELLANEOUS item. | Destiption ae Trae es wa Hiecare’] 15,900.00 conversion of 20 or 39 engineering drawing (Herd or Soft copy) of a campus showing building, roads, tunnel culverts, fandscapes ete. and allover head/under ground services such as electricl lines, cabe's, water lines, sewer ines, g25 pipe lines, telecam lines, opticat fibre tines, fire pine tines, hydrants etc, to virtal 30 bulling model using building modeling Revit software and extractation lof MEP 20 format drawing from this 30 model incorporating landscape detalss ofthe campus for ‘sualisation with finishing and true texture and colors {and submission of soft copies (6 sets of CD} of the model 2s well as hard copies {6 sets of Jaf 2-D drawings lextracted from 3-0 mode! Wie |Cowersion of architectural, structural ard MEP] enechanical, electrical and plumbing) services 2-0) JAutoCAD/pdf frardcopy drawings to vitual 3-D buiiding| lmadel using Building Modeling Revit software and | lewiraction of MEP 2-D format drawings irom this 3-0} lmodel, incorporating interior as well as exterior lacchitectura! details of building for visualization with] finishing and true texture and colors and submission cf soft copies (6 sets of CD) of the mociet as well as hard eopies (6 sets ef) of 2-0 drawings extracted trom 3-0) | model | For completed buildings ia 3.18.2. [opto 10,000 am a 27.18.12 {10,000 sqm to_ 75,000 sam EE sqm 57.00) 27,18.1.3 [25,000 sqm to 50,000 sam sam “54.00 27:48.1.4 [more than 50,090 sqm sam 3.9) FIer Troy ubder tonsiacion bua [a7 3a 24 uote 1.00023 aa a2 fi Osa Tam Fe] 27,18,2.2 [10,000 sqm to 25,000 sqm [27.48.2.3 [25,000 sam to 30,000 sam sa [27.16.2.4 [move than $0,000 sam 2718.3 }for upcoming buildings 27.18,3.1 lupta 10,000 sqm 27,18.3.2 {20.000 sqm to 25,000 sam sam Endt. No. F-64-10/2018/Common SOR/Building/W-VPD/4.59 Copy is forwarded to:- 1. B.A to Hon'ble Minister.M.P P.W.0. Bhopal 2, ‘The Principal Secretary to Govt. of M.P.P.W.0.Bhopal a 3. The Secretary to Govt. of M.P.P.W.D. .Bhopal 4. The Engineer-in -Chief, M.P-P.W.D. Bhopal 5, The Chief Technical Examiner, M.P. Bhopal. 6. The Principal Secretary to Govt. OF MP. Housing & Environment Bhopal. 7. “The Accountant General, M.P. Gwalior/Bhopal. 8. The Secretary to Hon'ble Lokayukta, M.P: Bhopal, 9. The Chief Engineer, P.W.D = MP, 10. The Additional Project Director P.W.D. (PIU) —— 11, The Chief Engineer, M.P. R.D.C. Bhopal. 12. The Chief Engineer, Rural Engineering Services, M.P. Bhopal ~ 13. The Divisional Project Engineer M.P. PWD —————— 14. The Executive Engineer, MP P.W.D. Division 15, Chairman, Contractor Association, MP Bhopal. Page Bot 2 fein No. OFICHOF THE PROJECT DIRECTOR aidbeidina Na. 35) CHAPTER NO- 29 Deseription The following itertis are amentlédsis under in Building SOR wef, 1/8/2014 and rate shail be applicable with effect front the date of issite of this order Lef< /0S/2018 SEWAGE TREATMENT PLANT AND EFFLUENT TREATMENT PLANT (STP/ETP) Unit |” Rate (in Rs.) 29.1 STP: Designing and preparing good for construction (GEC) ‘}civil, mechanical and electrical: drawings of conventional ot | package unit of a Sewage Treatment Plant(STP) as por manufaeturer’s/vender's design and specification consisting meeting “up to date/eurrent design: (target): parameters of troated effluent conforming to” Madhya Pradesti Pollution Control | Béard: (MPPCB) and MoEF GOI guidelines and technical Specifitations codes-of practices as published by the Bureau of Indiait Standard (BIS) até latest version of “Manual on Sowerdge and: Sewage Treatment” “published by the Central Public Health Atid Eavirotitental” Engineering Orgahization (CPHEEO). The’ work shull ihclide supplying, installing, testing and comitiissioning of eléetro-niechanical equipments, instruments, pipes, valves, pumps, and gauges etc. as per approved technical specificatiots, layout and drawing of STP. Most of the electro-mechanical unit will be placed below ground unter toad/green area/as per sité condition, space available, equipment and purtip room will be above the ground | level as per approved drawings. The structure design of civil work such as chambers, Under Ground Tanks, shall be carried as per provision of IS code Civil work items such as excavation, shuttering, reinforcement, RCC(minimum M30 concrete), brick work, plastering, water proofing, pointing, painting, structural steel, roofing, tiles, kota storie doors, windows etc. to construct tanks, chambers, pump house etc. according to the approved shop drawings and of primary, secondary, tertiary treatment units complete for |, ‘direction of Engineer in charge, civil work shall be paid separately, - Description Rates are intclusive of cast of opetatton Gfinititim three Aumber semi-skilled shift operators) and. taintenance (O&M) for one year after completion of works’ which include periodical (monthly) checking quality of treated sewage, checking of safety arrangements and routine maintenance of plant such as oiling, greasing, cleaning, operating, providing consumable replacement of, components within guarantee period, disposal of dried sludge and alsb ensuring. safety against theft. The STP shall comprisé of the following units of required size as per detail process and hydraulic design. (Note:- 1 If STP aud ETP plant are- situated in the same campus then only one O&M contract shall be applicable. 2- Treated water testing shall be got done by the vender fom Pollution Coatrel “Board (PCB) approved laboratory covering parameters such as - BOD, COD, TSS, PH, O&G, TKN, TP and E COLI ete, 3 STP Contractor/vender shall include-in his rate cost of all electrical and mechanical items. as required to Operate the system automatically and also any other components /tanks/equipments process etc. required completing the job as required, 1 My main power supply with earthing up to STP main contol panel shall be provided by the owner/department. The electrical panel will also include all the required NO/NC contacts and provision for BMS connectivity 5- Detail specifications of components shall be as per preamble, 6 Tanks shail be made of MSFRP (mild steel fiber reinforced polymer/plastic) / HDPE (High Density Polyethylene) / FRP (Fiber reinforced plastic) anti corrosive in packaged unit.) Sot rete GC ety a : \ Conventional MBBR/FAB STP Unit | (A)Primary Treatment — -Manual Bar Screen (Oiset) “Oil, Grease Trap and Grit Removal System (01 set) (B) Secondary Treatment — -Raw Sewage Transfér Pump (01set) -Air Blower (Olset) ~Agitator for Anoxic Tank (each) -MBBR Media for MBBR tank (01set) | -Diffuser System (Olset) ~fube Media/Lamella for Tube/Lamella settler tank @lset) “Chlorine Dosing system in Clear water Tank (01set) -Sump Pump (O1se1) ~PlanvInterconnecting Piping And Vaives (01set) “Manual/PLC Based Bicctrical Conirol Panel (Olset) -Incoming/Outgoing Feeder (Olset) Cable Laying With Cable Tray (Oiset) ~Barthing Systems (01set) ~Pressisre Gauges (O1set) “Level Switches (O1set) -Oniline Rotameter (01 set) ~Air Rotameter (O1set) Flow i.ieter (Oi set) “Filter Feed Pump (O1set) | “Multi Grade Sand Filter (O1set) - ‘Activated Carbon Filter (Oiset) (C)Sludge Handling System — ~icge Recycling Pump (61 set) “Sludge Feed Screw Pumps (0isct) Filier Press System (OIset) >. Deseription 32,58,798.00 ‘each | 36.34398.06 250KLD. ‘each _ | 43:28,799.00 (A)Primary treatment ~ ~- Manual Bar Screen -Oil, Grease Trap and Grit Removal Systein @)secondary treatment | -Raw Sewage Transfer Pump -Air Blower ~Anoxie Tank \\ -MBBR Media with, MBBR/FABYActation Tank Diffuser System -Tube Media wish TubO%amelta Settler tank “Clear wated Task Wilh, Chlorine Dosing Pump “Sump Purap -Plant/Intereonnecting Piping Aud Valves sManua/PLC Based Electrical Cdatrol Panel -Inebining/Outgoing Feeder “Cab aying With Cab -Earthing Systems -Pressure Gauges -Level Switches -Oaline Rotameter -Air Rotameter “Flow Meter Filter Feed Pump -Multi Grade Sand Filter -Activated Carbon Filter 3 ‘6 |300KLD ae each | 47,91,250.00 29.11.17 _.|400KLD a Teach |57,61313.00 29.11.18 [S00KLD _____ each _| 59,473,250:00 PSE Package: MBBRIFAB STP Unit ee 4 4 ETS (€)Sliidge Handing System= “Sludge Recycling Puinp -Sludge Holding Tank “Sludge Feed Screw Pumps “Filter Press System BOD.<10 Mg/L in MBBR technology and tweated: ‘water is. | be used for recycling such as flushing, gardening, cooling tower ete. Micro Filtration (MF) system (O1set) ~ ‘Supplying, installing, testing and commissioning ‘of VPMF- variable pore micro filtration system piping and valves with all the required accessories & chemical cleahing systetn, compléte in all respects. VPMF siodule (fully back washable top to bottom: filtration) including SS 304, Pneumatic Valve, PLC Electrical Panel, flow meter, compressor and all other | accessories making the system complete. 29.4.1.2.1 |10KED each: 29.1.1.2.2 [30KLD i “Jeach | 26,70;350.00 29.1.123 |30KLD each __ | 28,59,203.00, 29.61.24 [100 KLD ~ eect P0831 .00 |29:E125 [150 KLD. ae each is iS 388.60 jmuiae 200°KED Teach F64,93,380.00 29.1.3 | Tertiary Treatment- Optional System - when required Z {2 [29.0031 eee sera eer eciceg each | 1,26,198.00 29.1.13.2 [100 KED each | 1,31,980.00— 29.1.13.3 |[150KLD each | 153,800.00 29.1.13.4 |200KLD ae Teak Tar ab00 /29.1.13.5 [250KLD can [ek 1,87,660.00 [2s 1136 300KLD aneeeeeeeateee ae ek a each 187,660.00 — [29-1037 | 400 KLD 7 71,99,800.00 2.09,140.00 18,42,1435.00 | = Description SiP.with Membrane Bio Reaciov (MBR) Technulogy (BOD <10 Mg/L after treatment’) ue Conventional MBR STP Unit (A)Primary treatment — | ~ Manuel Bar Screen (01set) | -Oil, Grease Trap and Grit Removal System (01 set) | (B)Secondary treatment — -Raw Sewage Transfer Pump (O1set) -Ait Blower (023e9) -MBR Module for MBR tank (O1set) | -Membrane Clean-in-place (CIP) system (O1set) | -Diffusets System (O1set) -Petmeate Suction Pump and Transfer Pump (01set) -Sump Pump (Otset) -Plant/Intereonnecting Piping And Valves (Olset) -Manual/PLC Based Electrical Control Pane! (0set) | -Incoming/Outgoing Feeder (01set) | -Cablé Laying With Cable Tray (Otset) -Barthing Systems (01 sei) | -Pressure Gauges (J1set) | -Level Switches (01set) -Online Rota meter (01set) | -Air Rota meter (Ole!) Flow Meter (Olset) i | (C)Sudge Handling System (O1set) ~ | -Sludge coyeling Puinp (Olset) | Sludge Feed Screw Pamps (Olset) ~Filter Press System (01 set) \ 30 KLD edeli [75KLD— each’ i00KID each | 46,27,286.00 150 KLD ‘each | 57,58,429.00 200 KLD paeeceate Bach | 67,36,457.00 250 KLD Beas each | 74,89,171.00, 300 KLD each | 82,27,134.00 100 KLD cere each | 99,68,538.00: Wiis [S00KED coe each | 1.24,07,050.00, 29.1.2.2 T Package MBR STP Unit as (APimary treatment — = Manual Bar Screen -Oil, Grease Trap and Grit Removal System (B)Secondary treatment ~ -Raw Sewage Transfer Pump Air Blower ~Anoxie Tank -Acration tank -MBR Module with MBR tank -Memibrane Clean-in-place (CIP) system Diffuser system -Permeate Suction Pump and Transfer Pump -Sump Pusup -Plan/Interconnecting Piping And Valves -Manual/PLC Based Electrical Control Panel -Incoming/Outgoing Feeder -Cable Laying With Cable Tray -Earthing Systems Pressure Gauges -Level Switches Online Rotameter -Air Rotameter Flow Meter (C)Sludge Handling System -Sndge Recycling Pump Sludge Holding Tank Shulve Fi en Pumps ; Description Unit [28,97 0000 (A)Primary treatment - -Manwal Bar Screen (01set) -Oil, Grease‘Frap and Grit Removal System (01 set) (B)Secondary treatment — -Raw Sewage Transfer Pump (01set) -Ait Blower (O1set) -Decanting mechanism for SBR tank (OLset) -Diffuser system (Olset) -Chlorine Dosing system for clear water tank (O1set) -Sump Pump (01 set) -Plant/Interconnecting Piping And Valves (UIset) ~*PLC Based Blectrical Control Panel (01set)” OR “PEC with HMI - delta based control panel for fully | automatic operation (O1set)” -Incoming/Outgoing Feeder (O1set) -Cable Laying With Cable Tray (01set) -Earthing Systems (O1set) -Pressure Gauges (0set) “Leyel Switches (01set) -Online Rota meter (01set) -Air Rota meter (Oiset) -Flow Meter (01 set) Dissolved oxygen sensor and SS (Suspended solids) sensor (each) a 30 ELD. ie each Op 50 KED : eath | 36,51,206.00 100KID each | 58,47,367.00 301224 |150KLD a ~ [each | 76,63,700.00 29:1.2.2.5 |200KLD each | 91,52,683.00 [2913 STP with Sequencing/Sequential Batch Reactors (SBR) technology ~ (BOD<10Mg/L after treatment.) |, A 291.31 Conventional SBR STP Unit Description Unit Rate i nRs.) “Filter Feed Punip (01set) -Multi Grade Sand Filter(Otset) ~Activated Carbon Filter(01set) (C)Sludge Handling System - ~"Sludge Recycling Pump (O1set) -Sludge Feed Screw Pumps (O1set) ~Filter Press System (O1set)” OR ~“Sludge dewatering unit - bag filter with packet bags, trolley and other accessories (01set).” 29.1 _ [S0KLD a each | 26,29,971.00 29.13.12 [75 KLD ae A ~_ [each | 27,80,500.00 [29.13.13 |100KED each “}30;70,481.00 21314 [1S0KLD each — | 34,35,509.00 200 KLD_ = : Ee [each | 40,37,702.00 250 KLD each | 50,10,374.00 300 KED each | 53,53,656.00 2913.18 |400KLD_ 29.13.19 {S00KLD 29.1.3.2 | Package SBR STP Unit (A)Primary treatment — ~ Manual Bar Screen -Oil, Grease Trap and Grit Removal System (Not required | up to 30 KLD capacities.) 65,76,663.00 @)Secondary treatment — “Raw Sewage Transfer Pump -Air Blower ~Anoxic Tank (Not required for HDPE packaged grid unit) j “SBR tank with decanting mechanism (MOC : MSFRPY” | \ OR | “HDPE (high density polyethylene) tank with grid, inlet | box and cutlet box, diffuser supports, incoming and outgoing sewage flanges. Electrically operated directional | solenoid air valves/NRV.(Up to 50 KLD)” OR ~“FRP (Fiber Reinforcement Plastic) tank with grid, inlet box aud outlet box, diffuser supports, incoming and outgoing sewage flanges. Electrically operated directional 0 _| solenoi p to 200 KLDY* F “Sump Pum -Incoming/Outgoing Feeder Pressure Gauges -Level Switches -Flow Meter Filter Feed Pump “Multi Grade Sand Filter ~Activated Carbon Filter ludge Recyeling Pump ~ Sludge Holding Tanke ~Sludge Feed Screw Pumps | -Filter Press System’ OR ~“Skudge dewatering unit - trolley and other accessories.” Clear Weter Tank With Chi ~Planvinterconnecting Piping And Valves PLC Based Electrical Control Panel “fable Laying With Cable Tray- Earthing System ~Online Rota meter (Not required up to30 KLD capacity) | “Ait Rota meter (Not required up to 30 KL capacity) (QSludge Handling System ine Dosing syste bag filter with packet: bags, 2KLD- . ae ae cach | 454,250.00 | 3 KLD a fe Fy eacli | 6,16,350.00 | SRLD : ae ~ each | 7.45306.00 ~] | lo KD HH a Teach 9,80,250.00 | 1s KLD each [ eer} i each Teach 112.88750.00 each 17, 3,250.00 214 each [32,61,445.00 each ie 45,75,171.00 | each | 68.27,751.00 f { [each 17 oar a Description | Unit Rate (in. Rs.) Kit for converting septic tank to SBR STP ~ STP kit compact system for septic tank which is suitable to Convert existing septic tank to SBR based STP. | 1, Control cabinet with all the components inside such as | solenoid valves (01 set) Air blower (1set) “PLChimer-switch electrical control panel with automate to contro! (each) 2. Grid System - with wall mount support brackets designed fo assemble in tanks with the proposed dimensions consis! af, -PYC air grid (Otsct) Diffuser system (01 set) Piping for the complete system, Excavation for the Placement of complete equipments, cable, earthing 29.43.31 kit Tories ae “| 103,500.00 | 29:1.3.3.2 [Kit for 15 users ae ~{1505,600:00 | 29.1333 | Rit for20 users Hee erie 1,70,250.00 [PSSA | Rater i ase a 239,550.00 | 30.1.3.3.5 [Kit for 50 users — "(392,230.00 | [29.1.33.6” | Kit for 70 users 458,400.00 [29.1.3.3.7 | Ritfor 100 users mine aoe 5,60,700.00 | [29.0338 [Rit for 150 ase cea | 670,000.00 29.2 + ETP: Designing and preparing good for construction (FC) civil, mechanical and electrical drawings of package unit of 2 Effluent Treatment Plant (ETP) as pe r manufacturer's / Wenders design and specification cansisting of primary, | Secondary, tertiary teatment units complete for meeting up to date/currént design (target)parameters of treated effluent conforming to Madhya Pradesh Pollution Control Board (MPPCB) and = MoEF GOI guidelines, technical | Specifications published by the Bureau of Indian Standard | and laiest version of “Manual on Sewerage and Treatment” y the Central Public Li 4 Senter jcnsuring safety against theft. The ETP shall comprise of The work shall included supplying, installing, testing and commissioning of _electro-mechanical equipments, instruments, pipes, valves, pumps, and gauges ete as per approved technical specifications, layout and drawing of ETP. Most of the electro-mechanical unit will be placed below ground under road/green area/as per site condition, space available, equipnient-and pump room will be above the ground level as per approved drawings: » The strusture désign of civil work such as chamber shallbe carried as’ per provision ‘of I$ code. Civil work items such as excavation, shuttering, reinforcement, RCC(ininitnum M30 concrete), brick. work, plastering, water proofing, pointing, painting, structural steel, roofing, tiles, kota stone, door, windows etc. to constrict tanks, chambers, pump house ete. according to the approved shop drawings and direction of Engineer in charge, civil_ work shall be paid separately. Rates are inchusive of cost of operation (minimum three number semi-skilled shift operators) and maintenance (O&M) for one year after completion of worlts which include periodical (monthly) checking quality of treated sewage, cheeking of safely arrangements and routine maintenance | of plant such as oiling, greasing, cleaning, operating, providing consumable replacement of components within guarantee period, disposal of dried sludge and also the following units of required size as per detail process and hydraulic design (Note ~ same as item no 29.1) “ ~ Deseriptigit Unie Rate dn Rs) 29.2.1.2 | Biiuent Treatment Plant (RTP -Pulage Unit (BODS30Mp/L and COD<100 Mg/t after treatment.) (Primary treatment — ~ Manual bar sereen (01 set) ~ Oil, Grease Trap and Grit Removal System (01 set) (B)Secondary treatment — | -Raw Sewage/Effluent Transfer Pump (O1set) ~Ait blower (OLset) -Flash Mixing tank with Motor (O1set) ~Alum/poly/lime Dosing Systent(Ot'set}with Reaction/Dosing MPlocculation/Aeration Tanke ~Agitator for Reaction Tank (each) -Lamella Clarifiet/Tube Settler Tank with Media (O1set) Diffuser System (O1set) : ~Chletine Dosing System (Oiset) in Clear Water Tank ~Sump Pump (01 set) ~PlanvInterconnecting Piping And Valves (Olset) ~Manual/PLC Based Electrical Control Panel (O1set) -Incoming/Outgoing Feeder (O1set) -Cable Laying With Cable Tray (O1sct) ~Barthing Systems (01 set) ~Pressure Gauges (Oisct) -Level Switches (0set) -Online Rota meter (01set) -Air Rota meter (O1set) -Flow Meter (01 set) -Filter Feed Pump (Olset) ~Multi Grade Sand Filter(01set) ~Activated Carbon Filter (O1set) , (C) Sudge Handling System - “Sludge Recycling Pump (01 set) ~Sludge Holding Tank (O1set) ‘Sludge Feed Screw Pumps (01set) Filter Pi t an dn.Rs). [f90.KED:. a ~ [each “| 23:16,248:06 + 30KLD each | 25,31,618.00 40KLD : = each | 26,81,893.00 50 KLD ae each | 30,35,463.00 Ultra violet system (UV) - infection system | Supply and fixing of ultra violet disinfection unit (It is optional System for STP and ETP both). ‘The unit shall have over 99.9 % acterial reduction from inlet to outlet. The disinfection chamber shall be constructed of SS 316L on all welted parts. The UV lamp shall be of low pressure mercury vapor type with hard glass enclosure, the sockets shall be water tight & vibration resistant. The unit shall be complete with temperature safety ediitrol, lampout alert circuit & UV radiometer with 4 ~ 20. mA output The UV unit shall have with reaetoil:cabinet Housing, cabinet cooling, treatment chainber, eléetrical-panel; temperature safety control, lamp ‘out alert, UV radiometer along with UV monitoring system and UV | monitoring teadout pafel. The lamps should be selected based upon the flow requirement of respective unit. As recommended by manufacturer edmplete in all respects. 28: 30KLD each | 41,625.00 [293.2 ~ |SOKLD ela ~ [each | 61,075.00 29.33 [T0OKLD euch >| 65,250.00, (29.34 [150 KLD a each _ | 73,250.00 39.3.5 __|200KLD i each | 1,18,000.00 29.36 | 250KED_ ae each _| 1,23,250.00 29.3.7 [300KLD. a [each [7,30.280.00 | 293.8 | 400KLD each | 1,35,800.00 | (293.9 [S00KLD oe each | 1,43,700.00_ | 29.4 Operation and Maintenance (O&M) Non-Comprehensive— | pet | 3,80,000.00 Operation and maintenance of sewage treatment plant with MBBR/MBR/SBR technology and effluent treatment plant after successful commissioning as per item numbers 29.1 and 29.2 Jand their sub items 29.111, 29.1.0.2),29.1.2.1, 29.1.2.2, 29.13.1, 29.132 and 29.2.1 after handing over to the authority, | for a period of one year, including cost of providing three semi skilled swift operators, periodical (monthly) checking of the treated water quality and safety arrangenient of plant, oiling, | a | greasing, routine maintenance, neoessary ete he | ig ” Beseription Unit Rate is oa ‘O&M Shall iticlude’ all cost involvéd'in maintenance, except for electricity, consumable, components (if to be changed for operation) and disposal of dried sludge. If STP and ETP plant in the same campus then only one O&M contract shall be applicable. Treated water testing report shall be got done by the vender from PCB (Pollution Control Board) | approved laboratory in interval of every one month, Parameters covered BOD, COD, TSS, PH, O&G, TKN, TP and E COLL etc. | Project eS DB. P-LEY Endt. No. F-64-10/2018/Gomion SOR/Building/W/PD/ 4+]2 Bhopal, Date 16/04/2018. Copy is forwarded to:- 1. P.A to Lon'ble Minister, MP P.W.D, Bhopal 2. The Principal Secretary to Govt. of M.P.P.W.D. Bhopal 3. The Secretary to Govt. of M.P.P.W.D, Bhopal 4. The Engineer-in “Chief, MP. P.W.D. Bhopal 5. The Chief Technical Examiner, MP. Bhopal. 6. The Principal Secretary to Govt. Of M.P. Housing & Environment Bhopal 7. The Accountant General, M.P. Gwaliot/Bhopel 8. The Secretary to Hon'ble Lokayukta, M.P. Bhopal. MPPWD (PIU) NIRMAN "eather ma RAN BHAWAN, BHOPAL aie make (STPIETE) SORW-UIPDI AQ 4 Bhopal Dates 07062018 UIST OF APPROVED MATERIAL (ELECTROMECHANICAL ITEMS OF STP?ETP) Fines arene specie, te brandinake ofthe material as specified in th tem nomenclature oi he Perk fsstons or in the lis of epproved materials atachedin the ender, shall be used inthe 2 The Contractor shall obtain prior specific material Brand/Mate. 5 Whenever the specified brand of material isnot available than, the corapeten authort may approve any Tatra euler it species net topo ig ore by Become reese tnditnocraiy toh seen REED i *pproval from the Engineer-a-charge befor placing order for any ‘4 Brand/nake approved in this list shal also conform tothe specification / stipulation lad dowm / applicable in the contract and shall be allowed for use only afer testing as per 1S codes or any other relevant standards, 5 This approved material ist wll be valid for one year ftom the date of issue. [S.No |Materia/Equipment |Approred Brand/Make [Approved Brand/Make (As 00 165-18) [Asoo ~ -2015) T Seen Vsk/Ezologhd iter indiron E Engg | Gopani Wastes Engine |J lon-exchange/ Iconic Eav/AR, lering/MLK lAquaonnstie \ConstrutionsSWTPL 2 JBen Type Oi Samer Prener Teclconcep Ewer JAR Aquafomates EviorWastech ote W [re Ey |quaiation Raw sewage Taster [TTiRiostarEiara/Crompion ~~ | Wie (Drainage Pump Jobson 1s |Air Blower [EverestBeta/Kay/Engersol’ lUsha/ Nitto: JAR Acusfomatcs 5 —|firnes SEMENSTLATomexchanae? = JAR Aquatermaties je iter yiem —— —[OTTIEDDPAenar eek Reta Talent [AR Aqueformaies i — [Piping and valve Taiainda Hise /APL-Apelio ~ Bapreme/AshivadTPince | MBR Sen ine Prenior Tekiberon-tahange [Watch 7 — | embrane For MBR Sysiem |G SienesTon exchange agarrronier Tah z 44 Pe ony (lB Scanned with CamScanner eee eee sai [Raveaspmest [Approred Brand/Miake L-4 ae 165.18) [iortirnaate | {crear ems [abl Ete W ane i leschangePremienechindivonSnglon ak ne Lhe t Minin gon aR Anas eset’ n /ortex Water/clear pice ad [5 [Bienromagnetc Flow Meter 5 IKrohneVEAHiForte Marsalis |WicoredRrani Aver he pa ig [PH Meter [Hanna/Sylew/AR Aquatornatics Aster Differential Pressure Switch \VigalSwizer/Danto ‘Online Rotameter limpell Pure n Cure/Flowsiar IWekseliesFlowstar/impell 19 Jair Rotammeter i357 jSatenotd Valve & NRV 7 - [asian Iai [Turbidity Metee/ SS Sensor lanna/Hack/Honeywell [ierose Eandl xylem faa [Cable system [FinolewPelycab/riavells 7 [a3 [Dosing Pump ticia LMUProninendTesheowsTon- [Grundfos Dose Jexchange/AR Aqueformatics \DosefEmec! Seiko \Germany fag [Pressare Guage iicFiebig GuruWike = F357 [Mult Grade FilterMSFRP Premteriechl Wastecl/AR Tal Tonexchange yank Jaquaformatcsleone Envvfon- [Penr lischange “nditton E EDge Je _ [Activated Carbon FinerMSFRP _|Premiertech! sjasishicore Bav Ton Lal Toneschonas fae exchange/Inditron. LENE |aquaformatics/ HyTank/ Penait Tal fonenchange / Frontier 57 [Dosing system storageltank Sica Verte Copaniieonie Env fag [Electronic ezonator system LeuverO rie /ORADPLTndivon = Engs- . Ff |Water Level indicators (Giras Engineering Trento! Rg TDS Meter bags Marshal/Honywel! RES 8 Scanned with CamScanner — / ~ [go [Materia Equipment pared Besar |(AS on 165.18) \APproved Brand/Make fai [elesronic Water Meter Tae (Avon 2018) aa ‘orbes Marshal Honywell {52 [Buterfly Valve & NRV [Danfoss/ZolotoL eT — [Sant 133 [SBR Decantor system Tonle Eas ates ‘Env JC-tech/ionxchange 'Awatechd Wabag/ Lal ‘Cable Tray ones.change/Premiertech eg y SlotcoTMEM ESPLBPL) Ship /SS Te i pS. [MSP /SS Tanks Beltechno/Biuestar/Wastech TonisEar |Awatech/indivon &.Enge/ Lt Tonexchange one lexchangefn situ WTS /AR |AquaformaticeBrisanzis! IMLKConstrictions /SWTPLIKGESPL [36 [Automatic Valves for Filter [Peniai/Siemena/Rotex = B7 |MBBR Media Premiertech/Kurarayindialiconis |Aquaporin [Env,/ on exchangefindtron.E.Engg. IAR Aquaformaties [38 |b Nediaamal rome Teas Ramporm Env. Andivon.E.Enge/ fonexchange/AR Aquaformatics [39 [Centrifuge system Premiertech/Kuuraray india/Alfa = [a0 |Sonensr Vessel Wastechlion-exchangeTiconie bs EnvirovAR Env Anditvon E Engg, Aquaformatics [a1 | Submersible Mixer/Agitator Premier TeelVABB/lon-exchange |AquaDDM/grundfos/Wilo [2 [HDPE packaged arid unit [Awateeh/Samalequvalent Raindustrics sa [SP Ka [Grisanaia/Awatech/Priemeriech ech [equivalent [a4 |Blecireal Panel lnditon E Engg lonexchange/CPRI |Sudhi Lal approved lonexchange/Adavance! IMLK Constr tions / ‘ INavigntor Tech’ Jakson/ Trident / Seimens as [Fier Foo? iRotorFons Eats | Dharci7 [Clear Water Pump Johasor/CRUATT/ Wie abi [a6 [Filter press [UniversalRoyal Precision/Sachin [Premier tech, Page org Ba ighoel Rrannna ISNo |MateriaVEquipmeat [Approved Brand/Miake Tappraved Brand tete (son 16-5.) (ason - -2018) [97 | CenifegeSindgs bag = Tawatesh/Aurle fi BO Semr = [Micra Xofem Ean a pete = ISetexT CAT i [Anserobis Bio Media /Ciadedalag [MIXX Constructions 57 SWTPL/Clean wate Vonax Tube Arseny yazan Mux {Constructions WTPLIClean ir [Planting tems Finclex Aahivwad Veen Isr evel Switches [Blucseas [Femac / Nand Shyam 7 | pye-4oh'y ootgl Xt (8 PWD PIF [Bhopal Scanned with CamScanner a) o0'000s bz 00'000061 0'000021 Ooro00si1 | 09700006 | oo'00009 | wg i | auny wOnEINDD0L/SuIsoqjuonseTy| 4 : WIM waIssg SuIsoq 0'000szz 00°000061 00'0000r1 00'00006 oo'oo00e | ovooose | tog 1 200W HH Yue Bu eC ovroonsze ovrooossz | ov o00szz Go'o00sr1 | oor000z1 | ooro0008 wonsisy soy samoig ay] i A A i ~ dung] 00°000091 oo ov00zt 0000086 0000008 00700009 | ao'0000r | sm enugaisiosan quaunecry, Kepuesog) g! 0000501 00'000s6 00'000s8 00'00009 00°0000r | on'0000¢ | tag 1 waIEas 1D pue deus osea1g ‘to! 7 or000s9 60°00009 00'00009 0'00005 00000 =| oovo00e | rag 1 uraisig useing! 1 suouyessy Aeeumgl Vy) a8eyoeg aBeyang aBeqeg aBeyorg oBuyoeg same | aD peda nN oorutan | ost-uaaw | oor-usaw osuaaw | ocuasw | orvaaw | apy wondyaseq wos} as) (warsdg atteyoeg ) Suvi juaunaery, wo, swsieay anya maaan SO °91T WAL = 309805 CLASH UI 19qUIEYD Jo Oey == 0"00008 00'00006 00°00009 00'0000s 0000s | ovoo00r | tag duung Suyohooy ofpins} 1 [ # waysdg BuypueR oping! >| ov 000s¢ onro00sz 90'000s1 09'00081 ooo00st | oo000st | yoeo 21M Mon 02 ooooesr yoonse 00°00002 o9'0000z 90'00002 | o0'00002 2eroueoy aryl 61 o0'000s¢ ‘on0sz 00°00051 on'000s" oo'000st | 0000081 ssjaumoy ouug! gy o0'0008z 000s 00°00021 000021 a sang foro 1 o0'0000r ov'oo0se 0000002 00'0000z 00'00002 | 6 00002 sa8nep ainssorg] 91 oo'D000r1 ooeoostr 00°00008 09°00009 oo'00005 | ovoo0os | 9g 1 wciség Suyguneal cy o0'c000r1 oo-000011 00'00008 00°00009 Qo'000sr | oorooooe | 10g AOL 219% HM BUKETaIGQeD| i i Si s9pa04 BuOSNO/PuwoDUH| ¢; ¥ : Turd jonucy 00-00008¢ 00000012 0'000sP1 ‘oo00zt | oo'o0008 | wag 00-0008 1F 00008: 000 0°00 0'0000: 1 two posed ratenteys| zy : i : Seaqeal 0°000S0E o0-00c0sz 00'000061 Geo0ott | 90700008 | o0r00009 | rag 1 ee ee | . ' ‘duing| 50°01 8. 0000065 Ov0001€ | oo'0000sz | ooro000c1 } ws 1 ane! eee a ea wa(yT4da Mdumd duns wooy quer ol | 00°00008 eorooaon 00°00059 000006 ooroo0sr | ooooose | 2g 1 woow metal 6 duma| ro0006¢ ov-000022 00°000061 Goroo0zt | 9000006 | oo'00009 | x85 1 Buisog suuoty.> ura suey, roe U09| = SUMOIE/PAYLLAI aT IvaI} gl »o'onosse, 0'000¢62 o0'oo00ez Orongzt | ooo000%1 | o0'00006 | 195 1 WEL Meg net PreweYeqn yam erpows aqng} | | o0°e00se1 09 000S01 00°00008 0000009 00°0000s 00'0000¢ uraistg sosnyiql of eo'o00s01 ovo00ss. 00'000s2 oo-000s9 o'000s» | op v000% | 195; WEL vonarey Jos 1oeNBy] so'owo0rZZ | Gu'eno0TSS | OO'DDDL96r | oo'evL08 | ovroo0L6zz | oo'ooDLSst Toy, { oo'000sL1 oooo0s9t ovoo00r1 | 90-0008 00'00008 | op00008 j 181 ssaiq say o0'0000%2 ‘00900061 0'0000s 1 00 00008 00700009 | o0'0000r | 381 woneioy wy eipoyy org] oo°b000%s ‘00 on0sse 00'000067 Goreaoget | Se mm0orT | ovomoos | | PSI sda sve oo Ged oo voosre 0°0000r1 o0'00056 0 0008s ovrooosr | dooce | 351 wonsks 29}O¥A. BUY 0000006 0900008 00009 09 00005 00'0000r =| ovro00sz | ST duund zysueay sep porear oo'oooser coonoo8e oo'osv0rz ooo0001z | oooo00ct | oot | v9 1 (ov) s014 vogue poreanoy| 0'000sz9 cooooore | oo oa0iz oov00091 | oo000r1 | oorooo0cr | 1g 1 GW) sama pues ape5 nny 0000008 oornoo0e 00'00009 00 v000s oo'o000s | on'0000s | rg 1 dund ssaag sot BST (D swouywary, Lrey20 3) SI worskg a8ngtsuad) of 9058 00'0008L o0'000s9 00°000s9 000059 | ov'o000s | tag 1 sduumg masog pao 8pnig) o0'o00sez 00-0000€1 700006 | _o0'c000s ‘oo'o000r oorooosz | ST UB SurploHy apins| Fe4-10017-1WApproved ORDER MPPWD (PIL) NIRMAN BHAWAN, BHOPAL ke (STPPETR) SORW-UPDY 494 al Dated ooh i018 LIST OF APPROVED MATERIAL (ELECTROMMECHANICAL ITEMS: OF STPETR) 1 ‘The Contractor shall obtsin specific materiaVBrand/Make, ‘Whenever the specified brand of material isnot avai Prior approval fom the Enginer-in-charge before placing order for any raterial equivalent to thats and its rot Brand/nake approved in this Kis shall ls conform tothe specification stipulation laid down / reece he contract and shall be allowed for use oily afer testing as per IS codes oreny oker relevant st ‘This approved mabye! list willbe valid for one year from the date of issue, |SNo [Material Equipment’ JApprored Brand/Make [Approved Brand/Nake [As on 165-18) (Asoo -2018) 1 Bereen [sslEcologinberfndizon E Engg Gopani/WasichiL D Engine A |/ lon-exchange/ Iconic Env JAR Jering/MLK [Aquaformaties [Constrctions/SWTPL, [Bet Type OW Seamer [Pemier Teiveoncepe [Eset JAR Aquaformatics Envir Wastech/NeotechvSW| HPL [> [Eaualzation Raw sewage Transfer [IT ioslar/EbarCrompion [Wile Drainage Pump Jaomen It aiBiower [Evere geo (Uihar No [AR Aquarmais: [5 [ardness nt SIEMENS Tiowexchange” a [AR Aquaforsiyies Diffuser system ~ JOT TAEDIPrieméx techy |Rehaw Wilo/Airtin/ Aqua ine |AR Aquaformat [7 Ping nd valve ara Sinema [&_ [MBR System integrator [Premier Techiftuberfor. exchange |Wastech : . |? Neitane For MB Stem —[oE/Siemenatonarciage ipePrenie Tah Pepe it 4 hg Scanned with CamScanner ae FiaterlaVEquipmcat [Approred BrandiMake |_| 5 (As on 16-818) rr a [roan TNR System re reed adsl inegrtor ener Th 7S + 2018) ee ii Fir [Uier Violet System hi iuber eames faPeieo AR AquaTerm [3 |MBR Permeate Purm eal esate aera ana — a (Me Pump a i fy [MicrofUltra ices ae ih fe — (Global Eades Wastechom lca occa | ne) ‘ |g Sade ing ensfrievage Riess formaties Recycling /Vortex Waterfclear chase Aa jwater Purp arcarpal f;5[Eiedtomagnetic Flow Meter KrobneVER/Rorbe Marsh ais | Micros Riat Taser fe [PH Meter Iu ie bq [Bafeenial Pressure Switch Wagons ig Jonline Rotameter impel Pure n CurelFlowstar . 5 [Air Rotammeter VexsalleFowstar?impell — so Sotenota Valve & NRV = mane tai forbiity Metre/ S-S-Sensor Fianna flack Honeywell Nicrosel Eandliylem ‘ canes sy [Cable system [Finolea/Polycabravells e | isa [Dosing Pum? tigia LiProninendTosiconfon- [Grndtos (Oe jecchange/AR Aquaformatics VEDose/Emec! Seiko |Germany bag [Pressure Guage TicFiebig/Gurw/Wika a tbs [Muli Grade Filter’MSFRP Premiertech/WasiccWVAR Tal Tonerchangs Tan quaformatesconic Env on Pentair exchange fn |_| enim [Pi Se caw Ev or bal onesies AR inl Carbon FlterMASFRP remierteatd Wastechiicon Tal tonerchangelAl Pelee xchange/Inditron-E-BNS- avatars! HTH Cee caste a k i i iconic Bow. a Tonexchange /Fromier 7 [Dosing system ‘storage/tank anionic Br i+ |g [Bleewonie ozonator system ‘ ae S97 [water Level Indicators [59 |TDS Meter eee Scanned with CamScanner ee ee eg jerlVEGuipment lipmoedeeagce bia [Approved BranRiake (AS on 1645-18) proved ‘Brand/Make |_| (As fBectronic Water Meter : + -2018) ipanery Valve ENRV [esis Mebane [-————] Tee eee ee T. [Sane ISBR Decantor system hone Ea me ERICA tecoweahange ave Wabag tal fonexehange/Premietech [cable Tray é Slotea/MfEM /BSPL(BPL) 2 c 55 [MStrp /SS Tanks [Behechno/Biuestar/Wastech isonicEa VAwatechindiwon Engg! al fonexchange/ lon : lexchange/n stu WTS /AR |AquafdrmaticBrisanzia/ IMLK Constructions /SWIPLIKGESPI. Bi [Automatic Valves for Fier Peni SiemensRoee — 37 [MBBR Media [Premieriech/KurarayindiaTeonic |Aquaporin Env.’ Ton exchange/inditron.E-Eneg. JAR Aquaformaties [38 |Tube Media/Lamella remienseW icone Jaauaporin lEnv.Indivon E.Engg.! lonexchange/AR Aquaformatcs [39 ~ [Centrifuge system . [Premiertech/Kuraray India/Alfa = [sd — |SoRener Vessel IWasiedviowanchangelconie —_[Sbs EnviroJAR : Env Anditvon Engg |Aguaformaties Hii [Submersible Mier/Aghatar [Premier TecWABBMionexchange _ [AquaDDM/grundfow/Wilo 2. [HDPE packaged grid unit [Awatech/Samialequivalent IKaindustries 3 [STP RR nee [BrisanaiafAwaiech’Priemertech ‘Wastech equivalent [a4 [Electrical Pant ndivonE Bagg on-exchange/CPRO [Sudhir Cal lapproved lonexchange/Adavance! IMLK Constructions / |NavigatorTect Jakson / . Hiden Seimens las [Filter Feed [Roto/Flosys poter De ae [Clear Water Pump Jtinsow CRIT TW. abi [ze |iter press ‘Universal Royal Precsion’Sachin [Premier tech i PRES Tass Scanned with CamScanner MateriaVEquipmeat Tapprored Grandia Tapproved Brandish? ‘ Jason 165-1 sson - 2018) [aiid a = lAvaiechvae [Doses = Mies Xie and FecTox " rca [Rani is Heda Cag = IK Convene Noa Take Asem = pa [Consens WTPLCan 5 — Pting tem isos [53 [level Soehes Pyeng Scanned with CamScanner OFFICE OF THE PROJECT DIRECTOR MPPWD (PIU) NIRMAN BHAWAN, BHOPAL F 64-10/2018/C 1on SOR/Building STP-ETP/W-UPD%79 Bhopal, Daterb0 CORRIGENDUM NO.1 With reference to M.P. PWD Building SOR weet, 01/08/2014 Addendum no.35 Chapter no 29 (Sewage Treatment Plant and | fluent Treatment Plant) Endt. No F 64-10/2018/Common SOR/Building /W/PD/473. Bhopal, Date16.05.2018 issued by this office lem No. 29.1.1.1.8 rates for 300 KLD mentioned Rs. 5,94,73.250.00 ( Five crore ninety four lacs seventy three thousands two hundred fifty) mentioned at Page no.4 of 16 shall be read as Rs.59.43.250.00(Filly nine lacs forty three thousand two hundeed fifty) and fem No 29.2.1 on page 13 of 16 Effluent Treatment Plant (ETP) package unit (COD=100v after Treatment ) shall be read as (COD=S0Me "I. atier Treatment) fee ao Project Djrector { PWD PIU/Bhopal Efron My Bhor Endt. No. F-64-10/2018/Common SOR/Building/W/PD/478 Bhopal, Date 2 1-25--2.6/8, Copy is forwarded to:- |. P.A to Hon'ble Minister. M.P P.W.D. Bhopal 2 The Principal Secretary to Govt, of M.P.P.W.D. Bhopal 3. The Secretary to Govt. of M.P.P.W.D. Bhopal 4, ‘The Engineer-in Chief, M.P.P.W.D, Bhopal 8. The Chief Tech | Examiner, M.P, Bhopal 6. The Principal Seeretary to Govt. Of M.P. Housing & Environment Bhopal 7. The Accountant General, M.P, Gwalior’Bhopal 8. The Secretary to Hon'ble Lokayukta, M.P. Bhopal 9. The Chief Engineer, P.W.D —- MP. 10. The Additional Project Director P.W.D. (PIU) ------------- MP, 11. The Chief Engineer, M.P. R.D.C. Bhopal 12. The Chief Engineer, Rural Engineering Services. M-P. Bhopal 13, The Divisional Project Engineer M.P, PWD —---~ 14. The Executive Engineer, MP P.W.D. Division 15. Chairman, Contractor Association, MP Bhopal. er / Project Dirgctor® PWD. PLU a AEN PLL Bhopal

You might also like