REQUEST FOR SITE INSPECTION
ASPIRE
Zone
| Project Tite: ‘Construction & Maintenance works for FIFA 2022 Requirement Modifications in Khalifa Stadium ~
| Package 3A, 38and$ : nae
Cornet /Nos SPIE) Pui aa
ea orator: | Eastwing cuter =
Craving No: AS perattched Cente Gar Alien Trad Con WL
pre : _MTyscenkrpp Elvator tr
Caton EiWiness vo
. Date:
Submittal No. ate: Taz 2
6 - 00
“ype Discpined of epecfon 7
Caches! 1h Shue Bees! Eavecranis! Cterdespe Cereal
| Divisiucire Eats visoo —Elieronants/Contol Chusises Ot Cotes
" entobe eeeced
Inepecton ferintalaion esting end commissioning of 2 nos Elevator it-01 andi-22 at Estwing
READY FOR INSPECTION Date | 052022 | Tire: | 11:00am
reining SOIC Name: | Thssny Beto daar sipatre
‘SteiSecion Engr. | Name: | MairanMasiou a Signa: anni
Recs by Contractor Name
None: Mactin Thomas Z Saati oe
‘Contactor NameRerais: Contato Nae
|" SUPERVISION CONSULTANT REMARK / ACTION
Inspector NamoRomars; Inspector Name
“third Party-to.confitm that counterweight installation meeting _NaneRoshdy Hassan. ae
‘with manufacturer recommendation is required ect Soe |
| clarify if the motor-is 380-V-or420 Vas per. QCS— Cate: 16/05/2022 _
E Projet Management Name
E Nave:
at See Sigmue
Approved] Rejected (Not Aproved) Date: Tine
as noted eae
DISTRIBUTION LIST -
Original: Employer Contactor others
Copies: PMC Supenision consultant Others