SITE INSTRUCTION
] OnNER.
PT. ANGGARAKSA LOKESWARA
‘TANJUNG LAUT - BONTANG
‘CONSTRUCTION MANAGEMENT
FM / PRO-O5 /28 REV -00
PT. DAGREA DESIGN AND ENGINEERING CONSULTANT.
[Fon PT. DAGREA Design and Engineering Constant No Stoowomicm-sravz012
Ito Brant Abigraye lose Tues, December 28, 2020,
Ur. Bp. Awang Prats lLocaon Retaring syten
No. REFERENCE DESCRIPTION
1 |Addonl raving tached, Sehioungan ted prgeseran etaning stem dan kerttan pots capng beam
2 [Design istucin Ol tached). \yngbebatsancengen page blas UT make dadakanpanmbshan paral autur
bse Stuting sepet gambar
Maa dengan hal sb. Agar PT. BAP sogeramelsksanakan ists int dengan sebale
lakes. Terma ash
[casan: [ose
Stn mera yah sebosidasar urtuk paritungen pekojaen tambsh kurang |{_) PT. Bris Araya
selon ada prseuan Perr Tuas. Pr idea ve
1 Pr pnggaratsa Lokeswara
‘Cansbucion Management,
PT. DACREA Design an¢ Engloerng Constant
|
D-PROJECT
‘Dineen Oat
Onna,
PT. ANGGARAKSA LOKESWARA
Dedvsina 7
Project ManaberDA sreuirun
= PT Anggaraksa Lokesware
Project 7 Site: CITIMALL BONTANG.
ro. 'PT_SRANTAS ABIPRAYA
Jour Reference Design Development
Subj 7 Pekerjaan Strutting Capping Beam Retainning System
Kepada Yth PT BRANTAS ABIPRAYA
Bersama dengan ini kami sampatkan, Design Instruction:
Pekerjaan Strutting Capping Beam Retaining System
Dikarenakan
Pergeseran dan keretakan pada Retaining System
|Tertampir Juga bersamaan dengan surat ini dokumen yang menjadi dasar dari pengajuan D1 ini
IMohon agar di lanjutkan ke proses berikutnya di lapangan.
[Terima kasin,
Joriginator by . Acknowledgement by: [Acknowledge ‘of Receipt:
[Signature pe:
ar? Name: c
Dedy Stryo mr.Wasan A [Date__:_2-9~ 12-20
*)Piease Return sign original to HO
Original To
1 Project admin
Copy to
TT eroject Manager coe
Coa
3 site manager{ono1odia)ooexo0e H
Of Hl
wyaa ONIdVO wag
(isvez UNXONY
o0gxo0s o0sx00£ H
WAZ) YINEGIS
Had SA f. Wv3a-ONTEVS
se VvOrel
@ SVLV UVdNVL
OOgx00E H