You are on page 1of 1

0 100 200

0+240.00
85.00
QUANTITY

ITEM AREA 84.00


1702(1)a 0.00

405(1)a3 0.36 83.00

1704(1)b 6.17
82.00
1711(1) 0.84
78.240
1712(2) 1.08 -0.800 81.00
78.240
407(8) 0.24 0.800

80.00
76.619
-20.000 76.916
-2.124
79.00
TOP OF REVETMENT @ ELEV. 78.240 m
78.00
HIGHEST FLOOD LEVEL @ ELEV. 77.440 m
DESIGN FLOOD LEVEL @ ELEV. 77.240 m

FREEBOARD = 1.00 m
77.00

76.00

75.00
76.916 ORDINARY WATER LEVEL @ ELEV. 74.238 m
0.000
76.916
0.800 74.00

75.516
1.060
73.00

72.00
73.587
20.000

78.240
76.916
72.916 71.00
7.000

70.00
-20.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 20.00

0+220.00
85.00
QUANTITY

ITEM AREA 84.00


1702(1)a 0

405(1)a3 0.36 83.00

1704(1)b 5.21
82.00
1711(1) 0.79

1712(2) 1.08 81.00


407(8) 0.24
78.220 80.00
0.800
76.795
-20.000 78.220
-0.800 79.00
77.020
-2.000 TOP OF REVETMENT @ ELEV. 78.220 m
78.00
HIGHEST FLOOD LEVEL @ ELEV. 77.420 m
DESIGN FLOOD LEVEL @ ELEV. 77.220 m

FREEBOARD = 1.00 m
77.00

76.00
77.020
0.000
73.270
20.000 75.00
77.020
1.000 ORDINARY WATER LEVEL @ ELEV. 74.218 m
74.00
75.020
1.700

73.00
73.720
7.000
73.020
15.000
72.00
78.220
77.020

71.00

70.00
-20.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 20.00

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS SECTION
REGION XIII CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG
SURIGAO DEL NORTE SURIGAO RIVER D 30
BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE NESAH B. DAPAR ROMMEL A. PIAPE VINCENT RODERICK O. ACEBES MARCELINO M. OPERARIO POL M. DELOS SANTOS, CESO IV
2ND DISTRICT ENGINEERING OFFICE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER REGIONAL DIRECTOR 15 30 45
SURIGAO CITY DATE: DATE:
SOURCE OF FUND: REGULAR INFRA. PROJECTS CY 2023 DATE: DATE:
APPROPRIATION: Php 100,000,000.00