You are on page 1of 1

0 100 200

0+320.00
85.00
QUANTITY

ITEM AREA 84.00


1702(1)a 1.18

405(1)a3 0.36 83.00

1704(1)b 1.78
82.00
1711(1) 0.76

1712(2) 1.08 81.00


407(8) 0.24
78.320 80.00
-0.800
78.320
77.194
0.800
76.927 -1.926
-20.000
79.00
TOP OF REVETMENT @ ELEV. 78.320 m
77.323
2.300 78.00
HIGHEST FLOOD LEVEL @ ELEV.77.520 m
DESIGN FLOOD LEVEL @ ELEV. 77.320 m

FREEBOARD = 1.00 m
77.00

77.223 75.523
0.000 4.500 76.00

75.00
ORDINARY WATER LEVEL @ ELEV. 74.318 m

74.00

73.00
73.323
6.000

73.023 72.00
72.523 20.000
7.500

78.320
77.223
71.00

70.00
-20.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 20.00

0+300.00
85.00
QUANTITY

ITEM AREA 84.00


1702(1)a 0

405(1)a3 0.36 83.00

1704(1)b 2.30
82.00
1711(1) 0.79

1712(2) 1.08 81.00


407(8) 0.24
80.00

77.101
78.300 78.300 3.200 79.00
-0.800 0.800
76.768 TOP OF REVETMENT @ ELEV. 78.300 m
-20.000 77.101
-1.999 78.00
HIGHEST FLOOD LEVEL @ ELEV. 77.500 m
DESIGN FLOOD LEVEL @ ELEV. 77.300 m

FREEBOARD = 1.00 m
77.00

76.00
77.101
0.000

75.00
ORDINARY WATER LEVEL @ ELEV. 74.298 m
74.301 74.00
3.600

73.801
73.00
5.000

72.901
6.300 72.00
77.101
78.300

71.00

70.00
-20.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 20.00

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS SECTION
REGION XIII CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG
SURIGAO DEL NORTE SURIGAO RIVER D 32
BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE NESAH B. DAPAR ROMMEL A. PIAPE VINCENT RODERICK O. ACEBES MARCELINO M. OPERARIO POL M. DELOS SANTOS, CESO IV
2ND DISTRICT ENGINEERING OFFICE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER REGIONAL DIRECTOR 17 30 45
SURIGAO CITY DATE: DATE:
SOURCE OF FUND: REGULAR INFRA. PROJECTS CY 2023 DATE: DATE:
APPROPRIATION: Php 100,000,000.00
1ST DISTRICT PLANNING AND DESIGN SECTION

You might also like