You are on page 1of 1

0 100 200

0+340.00
85.00
QUANTITY

ITEM AREA 84.00


1702(1)a 1.16

405(1)a3 0.36 83.00

1704(1)b 1.79
82.00
1711(1) 0.71

1712(2) 1.08 81.00


407(8) 0.24 78.340
0.800 80.00

78.340
77.017 -0.800
-20.000 77.329 79.00
-1.811
TOP OF REVETMENT @ ELEV. 78.540 m

78.00
HIGHEST FLOOD LEVEL @ ELEV. 77.740 m
DESIGN FLOOD LEVEL @ ELEV. 77.540 m

FREEBOARD = 1.00 m
77.00
75.929
4.000

76.00
77.329
0.000
76.229
2.500 75.00
77.329 ORDINARY WATER LEVEL @ ELEV. 74.538 m
1.100
74.00

73.00

72.00

78.340
77.329
71.00

70.00
-20.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 20.00

0+336.15
85.00
QUANTITY

ITEM AREA 84.00


1702(1)a 1.19

405(1)a3 0.36 83.00

1704(1)b 1.29
82.00
1711(1) 0.67

1712(2) 1.08 81.00


407(8) 0.24 78.336
0.800
80.00
77.080
-20.000 78.336
-0.800
79.00
TOP OF REVETMENT @ ELEV. 78.336 m

78.00
HIGHEST FLOOD LEVEL @ ELEV. 77.536 m
DESIGN FLOOD LEVEL @ ELEV. 77.336 m

FREEBOARD = 1.00 m
76.025 77.00
4.300

76.00
77.425
0.000
74.335
11.705 75.00
ORDINARY WATER LEVEL @ ELEV. X m

74.00

73.00
73.925
6.400 73.325
8.000 73.550 72.00
20.000
78.336
77.425

71.00

70.00
-20.00 -15.00 -10.00 -5.00 0.00 5.00 10.00 15.00 20.00

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR
DETAILED CROSS SECTION
REGION XIII CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG
SURIGAO DEL NORTE SURIGAO RIVER D 33
BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE NESAH B. DAPAR ROMMEL A. PIAPE VINCENT RODERICK O. ACEBES MARCELINO M. OPERARIO POL M. DELOS SANTOS, CESO IV
2ND DISTRICT ENGINEERING OFFICE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION DISTRICT ENGINEER REGIONAL DIRECTOR 18 30 45
SURIGAO CITY DATE: DATE:
SOURCE OF FUND: REGULAR INFRA. PROJECTS CY 2023 DATE: DATE:
APPROPRIATION: Php 100,000,000.00
1ST DISTRICT PLANNING AND DESIGN SECTION